Microwave Installation Procedure v1.1
MICROWAVE INSTALLATION PROCEDURE v1.1
OptiX RTN 310 and OptiX RTN 900
PT INDOSAT Tbk
PT. Huawei Tech. Investment PT Indosat Tbk
Approved by: Approved By:
Name : Name :
Date : Date :
Huawei Tech Investment
Team
Microwave Installation Procedure v1.1
REVISION HISTORY
Date Revision Description Authors
2015/Jan/19 V1.0 Initial draft Toni Riyanto
2015/Feb/17 V1.1 Installing the IDU chassis on outdoor cabinet guideline
Toni Riyanto
2015/Feb/17 V1.1 Define which MetroE site and non-MetroE site
Toni Riyanto
2015/Feb/17 V1.1 Use feeder clamp to fix IF cable on the ladder
Toni Riyanto
2015/Feb/17 V1.1 MW installation configuration Toni Riyanto
2015/Feb/17 V1.1 IP Communication parameter Toni Riyanto
Microwave Installation Procedure V1.1
i
Table of Contents
1. Preparation .....................................................................................................................................3
2. Safety Equipment ..........................................................................................................................4
3. Outdoor Installation ......................................................................................................................5 3.1 MW Antenna 0.3m – 0.6m .....................................................................................................5
3.1.1 Antenna Installation Condition ....................................................................................5 3.1.2 Inspection of antenna accessories ..............................................................................5 3.1.3 Hanging Bracket Assembly .......................................................................................6 3.1.4 Antenna Installation Manner .......................................................................................7 3.1.5 Anti-Fall Clamp Installation .........................................................................................7 3.1.6 Hanging Bracket Installation .......................................................................................8 3.1.7 Antenna Polarization ...................................................................................................8
3.2 MW Antenna 1.8m .................................................................................................................9 3.2.1 Cheking Parts of Antenna ...........................................................................................9 3.2.2 Fixing Hanging Bracket to Reflector ........................................................................ 10 3.2.3 Installation of Adjustable Rod................................................................................... 11 3.2.4 Antenna Polarization Adjustment ............................................................................. 11 3.2.5 Antenna Adjustment ................................................................................................. 12
3.3 MW Antenna 2.4m .............................................................................................................. 13 3.3.1 Cheking Parts of Antenna ........................................................................................ 13 3.3.2 Fixing Hanging Bracket to Reflector ........................................................................ 14 3.3.3 Antenna Polarization Adjustment ............................................................................. 15 3.3.4 Installation of Adjustable Rod................................................................................... 15 3.3.5 Antenna Adjustment ................................................................................................. 16
3.4 ODU/ Hybrid Coupler/ Waveguide ...................................................................................... 17 3.4.1 ODU ......................................................................................................................... 17 3.4.1.1 Appearance and Interfaces of the ODU ................................................................ 17 3.4.1.2 Appearance and Interfaces of the OptiX RTN 310 ODU ...................................... 17
3.4.1.3 Installation the ODU on Dual-Polarized Antenna .......................................... 18 3.4.2 Hybrid Coupler ......................................................................................................... 18 3.4.2.1 Appearance and Interfaces of the Hybrid Coupler ................................................ 18 3.4.2.2 Changing the Polarization Direction of the Hybrid Coupler .................................. 19 3.4.3 Waveguide ............................................................................................................... 19 3.4.3.1 Appearance of the Flexible Waveguide ................................................................ 19 3.4.3.2 Installing the Flexible Waveguide ......................................................................... 20 3.4.3.3 Installing Guide for the Flexible Guide Fixture ...................................................... 21 3.4.3.4 Fixing the Flexible Waveguide Fixture on the Pole ............................................... 21
4. Indoor Installation ...................................................................................................................... 23 4.1 Installing the Chassis in the 19-Inch Cabinet ..................................................................... 23
4.1.1 OptiX RTN 310 ......................................................................................................... 23 4.1.2 OptiX RTN 950A ...................................................................................................... 24 4.1.3 OptiX RTN 980 ......................................................................................................... 26
4.2 Connector Installation ......................................................................................................... 27 4.2.1 Terminating the TNC Connector .............................................................................. 27 4.2.2 Terminating the N Connector ................................................................................... 29 4.2.3 Terminating the RJ45 Connector ............................................................................. 30 4.2.4 Assemble P&E Cables ............................................................................................. 31 4.2.5 Assemble OT Terminal and Power Cable ................................................................ 34 4.2.6 Assemble Cord End Terminal and Power Cable ..................................................... 35
5. Cable Installation ........................................................................................................................ 36 5.1 Cable Connection ............................................................................................................... 36 5.2 Installing OptiX RTN 310 PGND Cable .............................................................................. 37
Microwave Installation Procedure V1.1
ii
5.3 Installing OptiX RTN 950A PGND Cable ............................................................................ 37 5.4 Installing OptiX RTN 980 PGND Cable .............................................................................. 38 5.5 Installing OptiX RTN 310 Power Cable .............................................................................. 39 5.6 Installing OptiX RTN 950A Power Cable ............................................................................ 40 5.7 Installing OptiX RTN 980 Power Cable .............................................................................. 41 5.8 Installing OptiX RTN 950A E1 Cable .................................................................................. 42 5.9 Installing OptiX RTN 980 E1 Cable .................................................................................... 42 5.10 Installing NM Cable (for Multiple Interconnected NEs at a Site) ...................................... 43 5.11 Installing Fiber................................................................................................................... 43 5.12 Routing IF Cable ............................................................................................................... 44 5.13 Grounding Points of the IF Cable ..................................................................................... 45 5.14 Installing the PGND Cable of the ODU ............................................................................. 46 5.15 Waterproofing Outdoor Connector.................................................................................... 47
6. Cable Installation ........................................................................................................................ 48 6.1 Antenna ............................................................................................................................... 48
6.1.1 One antenna on site ................................................................................................. 48 6.1.2 Two Antenna on site ................................................................................................. 48
6.2 ODU .................................................................................................................................... 49 6.2.1 1+0 Configuration ..................................................................................................... 49 6.2.2 1+1 Protection Configuration .................................................................................... 50 6.2.3 2+0 Protection Configuration .................................................................................... 50
6.3 Cable ................................................................................................................................... 51 6.3.1 PGND Cable of the ODU .......................................................................................... 51 6.3.2 IF Cable .................................................................................................................... 52 6.3.3 PGND Cable of the IDU ............................................................................................ 53 6.3.4 Ethernet LAN Cable .................................................................................................. 53 6.3.5 E1 Cable ................................................................................................................... 54 6.3.6 Optical Cable ............................................................................................................ 54
6.4 IDU ...................................................................................................................................... 55 6.5 DCPDB ............................................................................................................................... 55
Microwave Installation Procedure V1.1
Page 3, Total 63
1. Preparation
1.1 Be sure to wear a company uniform, wearing Huawei Pass ID, a letter of assignment from Huawei, and certification of each personnel.
1.2 Make sure Permit for entry to the site is ok.
1.3 Make sure Lock site and site address is ok.
1.4 Be sure to bring technical documents such as Engineering Design, BOQ, Delivery Note, and installation guide.
1.5 Be sure to bring and use safety equipment and bring P3K supplies.
1.6 Be sure to bring equipment and measuring installations are complete.
Microwave Installation Procedure V1.1
Page 4, Total 63
2. Safety Equipment
Microwave Installation Procedure V1.1
Page 5, Total 63
3. Outdoor Installation
3.1 MW Antenna 0.3m – 0.6m
3.1.1 Antenna Installation Condition
Antenna could be mounted on diameter of ᴓ60~ ᴓ110mm vertical mounting pipe
3.1.2 Inspection of antenna accessories
Microwave Installation Procedure V1.1
Page 6, Total 63
3.1.3 Hanging Bracket Assembly
Microwave Installation Procedure V1.1
Page 7, Total 63
3.1.4 Antenna Installation Manner
Antenna right installation Antenna left installation
3.1.5 Anti-Fall Clamp Installation
To ensure the safety during the processes of antenna installation and adjustment, user should install the anti-fall clamp before the antenna installation.
Microwave Installation Procedure V1.1
Page 8, Total 63
3.1.6 Hanging Bracket Installation
Hanging bracket right installation Hanging bracket left installation
3.1.7 Antenna Polarization
Microwave Installation Procedure V1.1
Page 9, Total 63
3.2 MW Antenna 1.8m
3.2.1 Checking Parts of Antenna
Microwave Installation Procedure V1.1
Page 10, Total 63
3.2.2 Fixing Hanging Bracket to Reflector
Microwave Installation Procedure V1.1
Page 11, Total 63
3.2.3 Installation of Adjustable Rod
3.2.4 Antenna Polarization Adjustment
Microwave Installation Procedure V1.1
Page 12, Total 63
3.2.5 Antenna Adjustment Azimuth adjustment of antenna
Elevation adjustment of antenna
Microwave Installation Procedure V1.1
Page 13, Total 63
3.3 MW Antenna 2.4m
3.3.1 Checking Parts of Antenna
Microwave Installation Procedure V1.1
Page 14, Total 63
3.3.2 Fixing Hanging Bracket to Reflector
Microwave Installation Procedure V1.1
Page 15, Total 63
3.4.3 Antenna Polarization Adjustment
3.4.4 Installation of Adjustment Rod
Microwave Installation Procedure V1.1
Page 16, Total 63
3.4.5 Antenna Adjustment
Azimuth adjustment of antenna
Elevation adjustment of Antenna
Microwave Installation Procedure V1.1
Page 17, Total 63
3.4 ODU/ Hybrid Coupler/ Waveguide 3.4.1 ODU
3.4.1.1 Appearance and Interfaces of the XMC ODU
3.4.1.2 Appearance and Interfaces of the OptiX RTN 310 ODU
Microwave Installation Procedure V1.1
Page 18, Total 63
3.4.1.3 Installation the ODU on Dual-Polarized Antenna
3.4.2 Hybrid Coupler
3.4.2.1 Appearance and Interfaces of the Hybrid Coupler
Microwave Installation Procedure V1.1
Page 19, Total 63
3.4.2.2 Changing the Polarization Direction of the Hybrid Coupler
3.4.3 Waveguide 3.4.3.1 Appearance of the Flexible Waveguide
Microwave Installation Procedure V1.1
Page 20, Total 63
3.4.3.2 Installing the Flexible Waveguide
Microwave Installation Procedure V1.1
Page 21, Total 63
3.4.3.3 Installing Guide for the Flexible Waveguide Fixture
3.4.3.4 Fixing the Flexible Waveguide Fixture on the Pole
Microwave Installation Procedure V1.1
Page 22, Total 63
Microwave Installation Procedure V1.1
Page 23, Total 63
4. Indoor Installation
4.1 Installing the Chassis in the 19-Inch Cabinet
4.1.1 OptiX RTN 310
Microwave Installation Procedure V1.1
Page 24, Total 63
4.1.2 OptiX RTN 950A
Microwave Installation Procedure V1.1
Page 25, Total 63
Microwave Installation Procedure V1.1
Page 26, Total 63
4.1.3 OptiX RTN 980
Microwave Installation Procedure V1.1
Page 27, Total 63
Microwave Installation Procedure V1.1
Page 28, Total 63
4.2 Installing the Chassis in the Outdoor Cabinet
i. Place the first IDU in the top position, if there is a second IDU place
beneath distance between IDU 1U.
ii. Install IDU grounding cable and connect to ground point on the cabinet.
iii. Install IDU power cable and connect to the power supply. Number of IDU
power cable base on BOQ.
iv. Install IF cable base on IDU cable layout.
v. Install ethernet service LAN cable for 2G/3G traffic:
a. GE port on the Power Injector (PI) of RTN310.
b. GE4 port on CSHO of RTN950A.
c. FE4 port on EM6Fof RTN980.
Microwave Installation Procedure V1.1
Page 29, Total 63
4.3 Microwave Installation Configuration
4.3.1 Antenna installed based on Link Budget requirement
4.3.2 ODU and Coupler (if any) installed properly on antenna by waveguide
4.3.3 IF cable installation follow design layout
Outdoor service cabinet-Rear view
Microwave Installation Procedure V1.1
Page 30, Total 63
View of coaxial cable from ODU to IDU inside outdoor service cabinet
View of IP LAN cable from IDU to BBU inside outdoor service cabinet
Microwave Installation Procedure V1.1
Page 31, Total 63
Use feeder clamp for coaxial cable
View of route cables of IDU power cable
MCB allocation for IDU
4.3.4 Ground kit for IF cable and ODU installed based on requirement
4.3.5 Waterproof and anticorrosive measures must be adopted for outdoor equip
4.3.6 IDU installed following site engineering design
Microwave Installation Procedure V1.1
Page 32, Total 63
4.2 Connector Installation
4.2.1 Terminating the TNC connectors
One end of the 5D IF cable needs to be terminated with a type-N connector and is connected to the ODU or lightning arrester. The other end of the 5D IF cable needs to be terminated with a TNC connector and is connected directly to the IF cable.
i. Use an electric knife to strip back the 16 mm cable sheath.
ii. Fit the lock nut and clamp 1 on the cable.
iii. Fit clamp 2
a. Fold back the braided shield to cover clamp 1.
b. Tidy the braided shield and use clamp 2 to bind the braided shield.
c. Cut the redundant part of the shielding layer.
iv. Use the electric knife to strip back the dialectric insulating layer in front of clamp 2. During the operation, the exposed cable wire should be 6 mm long.
Microwave Installation Procedure V1.1
Page 33, Total 63
v. Fit the connector.
vi. Connect the connector and the lock nut. Use a wrench to tighten the connection. Use a wrench to rotate the lock nut and another wrench to position the body of the connector. The recommended torque is 15±2 N.m.
Microwave Installation Procedure V1.1
Page 34, Total 63
4.2.2 Terminating the N connectors
Microwave Installation Procedure V1.1
Page 35, Total 63
4.2.3 Terminating the RJ45 Connector
a. Straight Cable
b. Crossover Cable
Microwave Installation Procedure V1.1
Page 36, Total 63
4.2.4 Assembling P&E Cables i. Assemble the P&E connector on the RTN 310 side
Microwave Installation Procedure V1.1
Page 37, Total 63
ii. Assemble the P&E connector and MGMT connector on the PI side
Microwave Installation Procedure V1.1
Page 38, Total 63
Microwave Installation Procedure V1.1
Page 39, Total 63
4.2.5 Assembling OT Terminal and Power Cable
Microwave Installation Procedure V1.1
Page 40, Total 63
4.2.6 Assembling Cord End Terminal and Power Cable
Microwave Installation Procedure V1.1
Page 41, Total 63
5. Cable Installation
5.1 Cable Connections
OptiX RTN 950A
OptiX RTN 980
Microwave Installation Procedure V1.1
Page 42, Total 63
5.2 Installing OptiX RTN 310 PGND Cable
5.3 Installing OptiX RTN 950A PGND Cable
Microwave Installation Procedure V1.1
Page 43, Total 63
5.4 Installing OptiX RTN 980 PGND Cable
5.5 Installing OptiX RTN 310 Power Cable
The recommended fuse capacity is 6 A to 12 A. Power over Ethernet supplies power over a maximum distance of 100 m. Allowable voltage ranges -38.4 V to -57.6 V.
Microwave Installation Procedure V1.1
Page 44, Total 63
5.6 Installing OptiX RTN 950A Power Cable
Microwave Installation Procedure V1.1
Page 45, Total 63
5.7 Installing OptiX RTN 980 Power Cable
Microwave Installation Procedure V1.1
Page 46, Total 63
5.8 Installing OptiX RTN 950A E1 Cable
5.9 Installing OptiX RTN 980 E1 Cable
Microwave Installation Procedure V1.1
Page 47, Total 63
5.10 Installing NMS Cable (for Multiple Interconnected NEs at a site) a. in MetroE sites
b. In non-MetroE sites
*Inband DCN NMS
Microwave Installation Procedure V1.1
Page 48, Total 63
5.11 Installing Fiber
5.12 Routing IF Cable
IF CABLE
IF CABLE
Microwave Installation Procedure V1.1
Page 49, Total 63
5.13 Grounding Points of the IF Cable
Microwave Installation Procedure V1.1
Page 50, Total 63
Microwave Installation Procedure V1.1
Page 51, Total 63
5.14 Installing the PGND Cable of the ODU
Connect PGND cable of the ODU to nearest grounding bar at below of the antenna. No ODU grounding to any tower Legs, it is not allowed
5.15 Waterproofing Outdoor Connector
Microwave Installation Procedure V1.1
Page 52, Total 63
a. Ground connections of ODU for Indoor IDU Installation
b. Ground connections of ODU for outdoor IDU Installation in Cabinet Greenfield
Microwave Installation Procedure V1.1
Page 53, Total 63
Rooftop
Microwave Installation Procedure V1.1
Page 54, Total 63
6. Labeling
6.1 Antenna
6.1.1 One antenna on site
6.1.2 Two antenna on site
Standard_Label MW_20120219.xlsx
Microwave Installation Procedure V1.1
Page 55, Total 63
6.2 ODU
6.2.1 1+0 configuration
Microwave Installation Procedure V1.1
Page 56, Total 63
6.2.2 1+1 protection configuration
6.2.3 2 +0 protection configuration
Main
Std by
Main 1
Main 2
Microwave Installation Procedure V1.1
Page 57, Total 63
6.3 Cable
6.3.1 PGND Cable of the ODU
ODU point
Grounding Bar point
>> 1+1 protection configuration
Microwave Installation Procedure V1.1
Page 58, Total 63
>> 2+0 protection configuration
6.3.2 IF Cable 1+0 configuration
1+1 protection configuration
Microwave Installation Procedure V1.1
Page 59, Total 63
2+0 protection configuration
6.3.3 PGND Cable of the IDU
6.3.4 Ethernet LAN Cable
Microwave Installation Procedure V1.1
Page 60, Total 63
6.3.5 E1 Cable
6.3.6 Optical Cable
IDU to IDU connection
Microwave Installation Procedure V1.1
Page 61, Total 63
6.4 IDU
6.5 DCPDB