PARTICIPATION OF "Naftogaz Group" in the development of
WIND ENERGY IN UKRAINE 2017
«VUGLESYNTEZGAZ UKRAINE» AFFILIATED COMPANY
wind turbine
PROVIDES FOR THE
INTENSIVE DEVELOPMENT
OF RENEWABLE ENERGY
SOURCES
ENERGY STRATEGY OF UKRAINE
for the period up to 2035:
"Safety, energy efficiency, competitiveness“,
which was approved by the Ordinance
of Cabinet of Minister of Ukraine
№ 605-r dated August 18, 2017
SHARE OF RENEWABLE ENERGY
IN ENERGY STRATEGY OF UKRAINE - 2035
млн т н.е.
0,1
1
2
5
2015 р.
2020 р.
2025 р.
2035 р.
2030 р.
wind turbine
THE MAIN ACTIVITIES FOR THE
IMPLEMENTATION OF STRATEGIC
OBJECTIVES IN RES SECTOR
INCLUDE STABLE AND
PREDICTABLE POLICY AS
FOR STIMULATING THE
CONSTRUCTION OF SOLAR
AND WIND PLANTS
DEVELOPMENT OF WIND ENERGY BY OTHER OIL AND GAS
COMPANIES IN THE WORLD
2016: 3.0 GW
2020: 6.5 GW
2022: 1950 MW
United States
425 MW
2.259 MW 2009:
16,5 MW
4.8 GW
NAFTOGAZ GROUP IS CONSIDERING
various opportunities for further development, including entering new segments in accordance with global trends in energy sector, in particular
RENEWABLE ENERGY
WIND ENERGY OF UKRAINE IN THE STRATEGY OF “NAFTOGAZ GROUP” SMALL SCALE DEVELOPMENT
Small projects 10-20 MW - minimal capacity
to gain scale benefits
Сарех
26 mln dol.
Advantages
Insignificant Capex
Ability to gradually build capacity in RE
Expected reduction of CAPEX in the near future - possibility for implementation of large profitable projects
Disadvantages Low NPV due to small size
WIND ENERGY OF UKRAINE IN THE STRATEGY OF “NAFTOGAZ GROUP”
FULL-SCALE DEVELOPMENT
Construction of large wind plants - up to
200 mw each
Сарех 264 mln dol.
Advantages
Relatively high NPV
Disadvantages Relatively high САРЕХ
UKRAINE WIND MAP
ecosvit.net
NECESSARY COMPETENCIES NEEDED FOR THE IMPLEMENTATION
OF WIND ENERGY PROJECTS
Site selection, approvals obtaining
Interaction with regulator and stakeholders
Selection of contractors and subcontractors
Technology knowledge
Access to low-cost financing
Experience of project financing at the expense of international financial institutions
Attracting a strategic partner at the stage of business scaling
Capabilities in large-scale construction
Grid connection
Supply management
Experience in engaging EPC-contractors
Maintenance planning and execution
Production monitoring and performance diagnostics
Energy production forecasting
PROJECT DEVELOPMENT STRUCTURING AND FUNDING CONSTRUCTION OPERATIONAL ACTIVITY
NAFTOGAZ HAS
ALREADY HAD 90% of the competencies necessary
for the successful development
of wind energy business
PROBLEMATIC ISSUES OF UKRAINIAN WIND ENERGY DEVELOPMENT
APPROVAL FINANCING CONNECTION
Complexity of obtaining land plots for the construction of wind plants and
obtaining permits
Complexity of obtaining low-cost long funding
Complexity of document issuing. Excessive technical requirements
for connection specifications
6, Khreschatyk Str., Kyiv, 01601
+380 44 279 5384 +380 44 278 8537
Reporter – Yurii Trofymenko
+380 97 603 6337
trofymenko@naftogaz.com
«VUGLESYNTEZGAZ UKRAINE» AFFILIATED COMPANY
top related