DTU Wind Energy25 March 2019
Wind Energy –Opportunities from the SET-plan
Peter Hauge Madsen
DTU Wind Energy
1
DTU Wind Energy25 March 2019 2
What is the SET Plan?
Research and Innovation (R&I) pillar of the Energy Union.
Aim:
to transform the energy system by accelerating the development and deployment of low-carbon technologies
to maximise impact of public investments by coordinating national & European efforts
to promote cooperation amongst EU countries, companies, research institutions, and the EU itself
DTU Wind Energy25 March 2019
How to influence
Memberships
• SETPlan Steering Committee
• Implementation plan steering group
• ETIPWind
• EERA JPWind
• Program committee
Danish fora:
• Megavind
• Research Consortium for wind
energy
• FI Reference group for energy R&I
6
DTU Wind Energy25 March 2019
• Take stock of R&I progress so far
• In order to meet the targets,
identify:
– Technological R&I activities
– Demonstration projects
– Non-technological barriers/enablers
• Joint R&I activities between SET
Plan countries: a key dimension
for implementation
Implementation Plans
DTU Wind Energy25 March 2019
Offshore wind Implementation Plan
The seven technology-related R&I activities
concern:
1. System Integration
2. Wind Energy Offshore Balance of Plant
3. Floating Offshore Wind
4. Wind Energy Operations and Maintenance
5. Wind Energy Industrialisation
6. Wind Turbine Technology
7. Basic Wind Energy Sciences
The two non-technological concern:
8. Ecosystem, and Social Impact
9. Human Capital Agenda
Framework program calls
Co-fund instruments - ERANet
Institutional alignment - Bilateral
DTU Wind Energy25 March 2019
Offshore implementation plan
Offshore wind targets:
• Reduce the levelised cost
of energy for fixed
offshore wind by
improving performance and
efficiency over the entire
value chain, leading to a
no-subsidy deployment
situation
• Develop the floating
offshore wind subsector to
reduce the LCoE to <12
ct€/kWh by 2025 and <9
ct€/kWh by 2030
9
DTU Wind Energy25 March 2019
SETWind
Best practice of
Institutional Alignment:
Reliablade (DK-GE) –
a living lab for cross
border collaboration
• Coordinator: DTU
• Budget: €1 million (Mar. 2019 – Feb. 2022)
• Goals
– Organising cross-border research projects
– Support to R&I policy (stronger research focus)
• Main deliverables
– Cross-border research projects (10)
– Criteria to evaluate the impact of wind energy R&I
– Mapping of R&I policies and priorities for offshore
wind
– Rolling R&I agenda / updated Implementation Plan
– Proposal for a European Lighthouse project
ReliaBlade - An international initiative to improve wind turbine blade reliability• Total project budget (Danish and German funding together): €18.3 mio. (DKK 136
mio.)
• The project runs from November 2018 through October 2022 (4 years)
Danish project:
• Budget of €11.1 mio. (DKK 88 mio.), with €6.0 mio. (DKK 44 mio.) funding by EUDP at Danish Energy Agency
German project:
• Budget of 6.5 mio. EURO (48 mio. DKK)
• Funded by German Federal Ministry for Economic Affairs and Energy (BMWi)
ReliaBlade Consortium
Danish project partners• DTU Wind Energy
• DTU Compute
• Vestas Wind Systems A/S
• LM Wind Power A/S
• IBM Denmark ApS
• FORCE Technology
• CEKO Sensors ApS
• Dantec Dynamics GmbH
• Zebicon A/S
• Blade Test Centre A/S (BLAEST)
• Olsen Wings A/S
• Siemens Industry Software NV
• Siemens Gamesa Renewable Energy A/S
German project partners
• Fraunhofer IWES
• ForWind Hannover (Leibniz UniversitätHannover)