photos.pdf

Post on 12-Jan-2016

16 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Photographs of CK Road/July 2015 1 | P a g e

ANNEX I: Photographs

Project information of CK-2 package Road section at Tumlingtar needs delineation measures

Hairpin bend down at Sabhakhola needs barriers Road Section at Tumlingtar

Photographs of CK Road/July 2015 2 | P a g e

Gabion barriers at Sabhakhola Sabha Khola Bridge

Sabha Khola Bridge section Chevron sign at Bridge approach

Photographs of CK Road/July 2015 3 | P a g e

Sharp Bend without delineation Building inside the RoW

Delineator post at the curved section small cutting may ease the driving

Photographs of CK Road/July 2015 4 | P a g e

Insufficient delineation Building at the center of the hairpin bend

Talking with local regarding road safety Describing the safety by local

Photographs of CK Road/July 2015 5 | P a g e

Delineation at Causeway Insufficient delineation

Causeway delineation A typical bus-bay

Photographs of CK Road/July 2015 6 | P a g e

Delineation Existing parapet blocks at curves

Curve Section visibility Chainpur

Photographs of CK Road/July 2015 7 | P a g e

CH 50+550 Causeway Hair pin bend

narrow road at 52+000 Gabion at 53+000

Photographs of CK Road/July 2015 8 | P a g e

CH 53+800 CH 54+500

Public interaction at Kharang Kharang Police Post

Photographs of CK Road/July 2015 9 | P a g e

Causeway delineation CH 58+000 Damaged causeway at CH 62+000

CH 62+800 CH 63+000 Causeway

Photographs of CK Road/July 2015 10 | P a g e

CH 64+400 Hairpin Bend CH 65+350

CH 0+900 (CK-2) Tumlingtar

Photographs of CK Road/July 2015 11 | P a g e

Lay Byes Tumlingtar Tumingtar airport chowk

S- Curve sign Hairpin bend at CH 9+000

Photographs of CK Road/July 2015 12 | P a g e

End point of CK-2 Chainpur Bazar

Interaction with Traffic Police at Chainpur Chainpur Bazar Gate

Photographs of CK Road/July 2015 13 | P a g e

Chainpur with ARE Ravi Panta Kharang Bazar

Photographs of CK Road/July 2015 14 | P a g e

Interaction on RS at Kharang bazar At Kharang

Delineation for Culvert CK 1 road Hairpin bend

Photographs of CK Road/July 2015 15 | P a g e

Kingring (Hairpin bend) CH 62+200 CK-1 Hair pin bend

Hairpin bend Sabha Khola Bridge

Photographs of CK Road/July 2015 16 | P a g e

Bend at Sabhakhola Delineation at Hairpin bend

CK 2 Road (with RE, ARE and contractor's representative) End point of CK-2 Road

Interaction with Drivers of Land-Rover Jeep Land Rover (Taxi) at Tumlingtar

Photographs of CK Road/July 2015 17 | P a g e

top related