Photographs of CK Road/July 2015 1 | P a g e

ANNEX I: Photographs

Project information of CK-2 package Road section at Tumlingtar needs delineation measures

Hairpin bend down at Sabhakhola needs barriers Road Section at Tumlingtar

Page 2: photos.pdf

Photographs of CK Road/July 2015 2 | P a g e

Gabion barriers at Sabhakhola Sabha Khola Bridge

Sabha Khola Bridge section Chevron sign at Bridge approach

Page 3: photos.pdf

Photographs of CK Road/July 2015 3 | P a g e

Sharp Bend without delineation Building inside the RoW

Delineator post at the curved section small cutting may ease the driving

Page 4: photos.pdf

Photographs of CK Road/July 2015 4 | P a g e

Insufficient delineation Building at the center of the hairpin bend

Talking with local regarding road safety Describing the safety by local

Page 5: photos.pdf

Photographs of CK Road/July 2015 5 | P a g e

Delineation at Causeway Insufficient delineation

Causeway delineation A typical bus-bay

Page 6: photos.pdf

Photographs of CK Road/July 2015 6 | P a g e

Delineation Existing parapet blocks at curves

Curve Section visibility Chainpur

Page 7: photos.pdf

Photographs of CK Road/July 2015 7 | P a g e

CH 50+550 Causeway Hair pin bend

narrow road at 52+000 Gabion at 53+000

Page 8: photos.pdf

Photographs of CK Road/July 2015 8 | P a g e

CH 53+800 CH 54+500

Public interaction at Kharang Kharang Police Post

Page 9: photos.pdf

Photographs of CK Road/July 2015 9 | P a g e

Causeway delineation CH 58+000 Damaged causeway at CH 62+000

CH 62+800 CH 63+000 Causeway

Page 10: photos.pdf

Photographs of CK Road/July 2015 10 | P a g e

CH 64+400 Hairpin Bend CH 65+350

CH 0+900 (CK-2) Tumlingtar

Page 11: photos.pdf

Photographs of CK Road/July 2015 11 | P a g e

Lay Byes Tumlingtar Tumingtar airport chowk

S- Curve sign Hairpin bend at CH 9+000

Page 12: photos.pdf

Photographs of CK Road/July 2015 12 | P a g e

End point of CK-2 Chainpur Bazar

Interaction with Traffic Police at Chainpur Chainpur Bazar Gate

Page 13: photos.pdf

Photographs of CK Road/July 2015 13 | P a g e

Chainpur with ARE Ravi Panta Kharang Bazar

Page 14: photos.pdf

Photographs of CK Road/July 2015 14 | P a g e

Interaction on RS at Kharang bazar At Kharang

Delineation for Culvert CK 1 road Hairpin bend

Page 15: photos.pdf

Photographs of CK Road/July 2015 15 | P a g e

Kingring (Hairpin bend) CH 62+200 CK-1 Hair pin bend

Hairpin bend Sabha Khola Bridge

Page 16: photos.pdf

Photographs of CK Road/July 2015 16 | P a g e

Bend at Sabhakhola Delineation at Hairpin bend

CK 2 Road (with RE, ARE and contractor's representative) End point of CK-2 Road

Interaction with Drivers of Land-Rover Jeep Land Rover (Taxi) at Tumlingtar

Page 17: photos.pdf

Photographs of CK Road/July 2015 17 | P a g e