Post Point Wastewater Treatment Plant Improvements

Project Overview

October 2010

Filename.ppt

Post Point WWTP Project Site

Projected BOD Loading

20,000

25,000

30,000

35,000

40,000

45,000

1998 2003 2008 2013 2018 2023 2028 2033 2038

Plan

t Influen

t BOD Lo

ad (lb/d)

Comp PlanReduced GrowthReduced Growth+Aggressive  ReductionHistorical Max 30‐Day Avg

Estimated Phase 1Completion (Year 2014)

Current WWTPCapacity

Average Monthly BOD Loading

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

J M M J S N J M M J S N J M M J S N J M M J S N J M M J S

% of R

ated

 Cap

acity

2006                       2007                      2008                   2009            2010

Average Monthly Flow1998-2010

0

2

4

6

8

10

12

14

16

18

20

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Average Mon

thly Plant Flow (m

gd)

Basis of DesignParameter Current NPDES

PermitDesign

Design Year --- 2034

Design FlowAverage AnnualMaximum MonthPeak Hour (plant)Blending allowed for peak flowPeak Hour (secondary)

---20 mgd72 mgd

Yes37 mgd

21.7 mgd34.3 mgd72 mgd

Yes40 mgd

Maximum Month Influent BOD 25,530 lb/d 39,800 lb/d

Maximum Month Influent TSS 47,000 lb/d 47,000 lb/d

Temperature Range --- 12-22.5 oC

Effluent BOD 30 mg/L 30 mg/L

Effluent TSS 30 mg/L 30 mg/L

Filename.ppt

Wetlands

NeighborhoodImpacts

InterpretiveTrail Loop/Public Access

Open Space(passive recreation)

Wildlife Habitat

Poor Soils

BellinghamBay

Filename.ppt

Filename.ppt

CEPT Building

Filename.ppt

Chemically Enhanced Primary Treatment (CEPT) Building

Chemical Storage and Metering

• 2,600 sf Building• PAX, Polymer Storage• Electrical Room

Filename.ppt

PEPSModifications

Modifications to Primary Effluent Pump Station

Structural Addition

Pump Replacement and Electrical Modifications

Filename.ppt

BlowerBuilding

Selector/ AS Basin

Modificationsto Existing ABs

Filename.ppt

Selector/Activated Sludge Basin 1

Aluminum Covers

Sluice Gates

Filename.ppt

Blower Building

Filename.ppt

Oxygen Supply and Standby Power

• 5,800 sf Building• Blower Room• Generator Room• Controls Room• Electrical Room

Modifications to Existing Activated Sludge Basins

Remove SurfaceMixers

Aeration Piping

Reroute Large ML Process Piping

Filename.ppt

Flow Splitter Box

Secondary Clarifier

Secondary Clarifier Improvements

Pile Supports

Piping Connections

Addition to Splitter Box

RAS System Modifications

Filename.ppt

Additional Basin(future)

Additional Activated Sludge Basin(Likely Future Phase)

Flow Junction Box

0.84 MgalAeration Basin

Filename.ppt

Secondary Clarifier

Selector/ AS Basin

BlowerBuilding

CEPT Building

PEPSModifications

Flow Splitter Box

Additional Basin(future)

Filename.ppt

Yard Piping Layout

Filename.ppt

Piping Between PEPS and Selector/AS Basin 1

Filename.ppt

Secondary Clarifier Piping

. 2008 2009 2010 2011 2012 2013 2014

PlanningPreliminary Design Detailed DesignConstructionStartup

Complete construction

Project Schedule

Notification of Selected GC/CM

Complete MACC Negotiations

Begin Pre-Construction

Phase

Begin Construction