prbdb.gov.inprbdb.gov.in/files/tnm/mpr july 2016.pdf · 2016-12-06 · rep ort pr worl punj outpu...
Post on 30-Aug-2018
215 Views
Preview:
TRANSCRIPT
Rep
eport pr
WORL
Punj
OutpuImprove
T
repared
MON
GD BANK
jab Ro
ut and ement, Re
Sang
NM
d by TNM
MonitoCon
S
NTHLY
GOVEK FUND
oads
Perforehabilita
grur‐M
TECHNOMANAG
M – ICR
oring Connstruction
D.A.Sangrur,
Y PROGJu
RNMED PUN
& Bri
rmancation, Res
ansa‐B
OLOGY AGEMENT
RA Mana
nsultant - Division.C Block Punjab -
GRESSuly 201
ENT NJAB ST
dges
ce Basesurfacing
Bathin
ANDLTD.
agement
Project O, PWD B&– 2 148001
S REPO16
OF PTATE RO
Deve
ed Roag and Ro
da Roa
t Consul
Office &R
ORT N
UNJAOAD SEC
lopme
ad Contutine Ma
ad Net
33
lting Se
o. 22
AB CTOR P
ent B
tract (aintenan
twork
33333333
ervices L
ROJECT
oard
OPRC)ce works
3
Ltd
T
) s
TNM
OPRC WorlMonthly Pro
ABREV
AASHTOAADT AC ASTM BANK Base YeaBC BDS BM BoQ CBR CoI CQAMP DBM DCP DgMark
DRB EHS EIA EMP EIRR ESA ESMF FIDIC
FWD FWP GC or GCGDP GOI GOP IBRD ICB IDA INR IRC IRI IRR ITB JV JVA km LOS MC MBCB MDR MEC MOEF
M TECHNOMANAG
ld Bank Project fogress Report No 22
VIATION
O AmeAnnuAsphAmeWorl
ar Last BitumBid DBitumBill oCalifoCorri
ContDensDyna
et Interand DispuEnvirEnvirEnvirEconEquivEnvirFedeConsFallinForw
CC GeneGrosGoveGoveInterInterInterIndiaIndiaInterInterInstrJointJointKilomLeveMonMetaMajoMonMinis
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
S
rican Associaual Average Dhalt Concreterican Societyld Bank Completed Fminous ConcData Sheet minous Macaof Quantities ornia Bearingidor of Impacract Quality se Bituminouamic Cone Pernational por internationute Review Bronment Hearonmental Imronmental Momic Internavalent Standronmental Soeration Internsulting Enginng Weight Deward Work Preral Conditios Domestic Pernment of Inernment of Prnational Banrnational Comrnational Devan Rupees an Roads Conrnational Rournal Rate of Ructions to Bit Venture t Venture Agmetre l of Service itoring Consal Beam Crasor District Roitoring Consstry of Enviro
a Bathinda Netwo
ation of StatDaily Traffic e y for Testing
Financial Yeacrete
adam
g Ratio ct Assurance Mus Macadamenetrometerrtal for tendeal organisatiBoardalth and Safempact AssesManagement al Rate of Reard Axel ocial Managenational Des eers eflectometerrogramme ons of ContraProductndia Punjab nk for Rehabmpetitive Bidvelopment A
ngress ughness IndeReturn idders
reement
ultant sh Barrier oad ultant, Emplonment and
ork in Punjab (Ind
e Highway a
and Materia
ar at the time
Management
r ers and procons (www.d
ety sment Plan
eturn
ement FramIngénieurs‐C
r
act
ilitation andddingAssociation
ex
oyer, ContraForests
dia)
nd Transpor
als
e of receipt o
t Plan
urement oppgmarket.com
ework Conseils ‐ Int
Developme
actor
tation Officia
of the Bids
portunities fm)
ternational F
nt
als
from governm
Federation o
2
ments
f
TNM
OPRC WorlMonthly Pro
MORT&MPa MPD MPM MSA NH NHAI NPV ODR OPRC PAP PC PCU PIRR PSPCB PWD PRBDB PSRSP QA QC RAP RDPM ROMDAROW RPM RUS&CPSDBC SH SIA TMP TOR UNDB oWB
M TECHNOMANAG
ld Bank Project fogress Report No 22
H MinisMegaMeaManMillioNatioNatioNet POtheOutpProjePartiPasseProjePunjaPubliPunjaPunjaQualQualReseRoad
AS RoadRightRaise
PM RoadSemiStateSociaTraffTerm
nline UniteWorl
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
stry of Road aPascal. Unitn Profile Depagement Peron (Equivaleonal Highwayonal HighwayPresent Valuer District Roput and Perfoect Affected cular Conditenger Car Unect Internal Rab State Pollic Works Depab Roads andab State Roaity Assurancity Control ttlement Actd Durability Pd Measuremet of Way ed Pavementd User Servici Dense Bitume Highway al Impact Assfic Managemms of Referened Nations Dld Bank
a Bathinda Netwo
Transport at of Measurepth rformance Mnt) Standardy ys Authority e ad ormance BasPerson ions of Contnit Rate of Returlution Contropartment d Bridges Dead Sector Proe
tion PlanPerformanceent Data Acq
t Markere and Comfominous Conc
sessment ment Plannce Development
ork in Punjab (Ind
nd Highwaysement
Measures d Axels
of India
sed Road Con
ract
rn (PIRR)ol Board
evelopment Boject
e Measurequisition Syst
ort Performacrete
t Business on
dia)
s
ntract
Board
tem
ance Measur
nline (www.d
re
devbusiness.
.com)
3
TNM
OPRC WorlMonthly Pro
TABLE
1 PRO
1.1
1.2
1.3
2 PRO
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7
3 WO
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.2
3.2
3.2
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
EOFCON
OJECT HIGHL
Significant
Crash Reco
Snapshots
OJECT OVER
Backgroun
Agencies I
Contract A
Organisati
Responsib
Project Or
Basic Cont
.1 Proje
ORK PROGRE
Improvem
.1 Work
.2 Work
.3 Work
.4 Work
.5 Work
.6 Chang
Road Dura
.1 Roug
.2 Struct
Network P
.1 Pavem
.2 Unsea
.3 Drain
.4 Routi
.5 Obstr
.6 Incide
.7 Veget
.8 Road
.9 Raise
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
NTENTS
LIGHTS FOR
t Events .......
ord Update .
s – Pictorial O
RVIEW .........
nd ................
nvolved in th
Administratio
on & Respon
ilities of the
ganization ..
tract Feature
ct Brief .......
ESS ‐ SUMMA
ment, Rehabil
ks Done ‐ Firs
ks Done ‐ Sec
k Done ‐ Thir
ks Under ‐ Fo
k Progress ‐ F
ge in Propos
ability’s Over
hness ..........
tural Capacit
Performance
ment Mainte
aled Shoulde
nage Mainten
ne Maintena
ruction on th
ent Response
tation Contr
Signs Maint
d Reflective
a Bathinda Netwo
THE MONTH
....................
....................
Overview ......
...................
....................
he OPRC Pro
on Chart .......
nsibilities – M
Monitoring
....................
es .................
....................
ARY AND CO
itation and R
st Year .........
cond Year .....
d Year ..........
ourth Year Pr
Fourth Year P
sal: ...............
rview ............
....................
ty Data (Pave
Works’ Ove
enance (RUS&
er Maintenan
nance (RUS&
ance of Bridg
he Pavement
e and Emerg
ol (RUS&CPM
enance (RUS
Pavement M
ork in Punjab (Ind
H OF JULY 20
....................
....................
....................
...................
....................
oject .............
....................
Monitoring C
Consultant .
....................
....................
....................
OMMENTS ..
Resurfacing W
....................
....................
....................
rogramme ...
Programme .
....................
....................
....................
ement Defle
rview ..........
&CPM‐1) ....
nce (RUS&CP
&CPM‐3) ......
ges and Othe
t Surface and
gency Works
M‐7) ............
S&CPM‐8) ...
Markers (RUS
dia)
016 .............
....................
....................
....................
...................
....................
....................
....................
Consultant ....
....................
....................
....................
....................
...................
Works ..........
....................
....................
....................
....................
....................
....................
....................
....................
ctions) .........
....................
....................
PM‐2) ..........
....................
er Structures
d Shoulders (
Response (R
....................
....................
S&CPM 9) ....
...................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
s (RUS&CPM
(RUS&CPM‐5
RUS&CPM‐6)
....................
....................
....................
...................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
– 4) ............
5) .................
) ...................
....................
....................
....................
4
........... 9
............ 9
............ 9
.......... 10
.......... 13
.......... 13
.......... 14
.......... 15
.......... 15
.......... 15
.......... 16
.......... 16
.......... 17
.......... 19
.......... 19
.......... 19
.......... 20
.......... 20
.......... 20
.......... 21
.......... 21
.......... 22
.......... 22
.......... 23
.......... 24
.......... 25
.......... 26
.......... 27
.......... 28
.......... 28
.......... 28
.......... 28
.......... 29
.......... 30
TNM
OPRC WorlMonthly Pro
3.3
3.3
3.3
3.3
3.4
3.5
4 CO
4.1
4.2
4.2
4.2
4.2
4.2
4.3
4.4
5 ENV
5.1
5.2
5.3
5.4
5.5
5.6
6 RO
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
7 CO
7.1
7.1
M TECHNOMANAG
ld Bank Project fogress Report No 22
.10 Pavem
.11 Traffi
.12 Crash
.13 Mark
Observatio
Recomme
NSOLIDATED
Contractor
Summary &
.1 Analy
.2 Mana
.3 Road
.4 Road
Verificatio
Audit Insp
VIRONMENT
Environme
Complianc
Status of G
Status of P
Status of S
Future key
OADSAFETY
Introductio
Crash Reco
Crash Ana
Trend in C
Road Safet
Road Safet
Road Safet
Way Forw
Distributio
NTRACTOR’S
Contract’s
.1 Key S
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ment Markin
c Island and
h Barrier Mai
er Post Main
ons on Audit
ndation for N
D AUDIT REP
r's Audit Rep
& Compariso
ysis and Com
agement Per
Durability P
User Service
on of Contrac
ection’s Pho
TAL &SOCIAL
ental Manag
ce as per Env
General facili
Physical Envi
Statuary Clea
y issues as re
YANDTRAF
on ...............
ords .............
lysis ............
rashes .........
ty Audit .......
ty Audit Find
ty Strategies
ard ..............
on of fatal cra
S STAFF AND
Staff as per
taff of Lead
a Bathinda Netwo
ng (RUS&CPM
Roundabou
intenance (R
ntenance (RU
t Sections .....
Network Per
PORT ...........
port on July 2
on of Contra
mments of the
rformance M
erformance
e and Comfo
ctor’s Audit R
otographic Re
LMANAGEM
ement .........
vironmental
ities at Contr
ronmental A
arances Appl
eviewed from
FFICMANA
....................
....................
....................
....................
....................
dings ............
s ...................
....................
ashes in the
D CONSTRUC
Contract Ag
Contractor P
ork in Punjab (Ind
M‐10) ..........
t Maintenan
RUS&CPM‐12
US&CPM‐14)
....................
rformance W
...................
2016 ............
ctor’s Audit
e Performan
Measures (MP
Measures (R
ort Performa
Report .........
ecord of Non
MENT ...........
....................
Performance
ractor Camp
Aspects on Si
icable for pr
m the works
AGEMENT ...
....................
....................
....................
....................
....................
....................
....................
....................
OPRC netwo
CTION EQUIP
greement .....
Present at Sit
dia)
....................
nce (RUS&CP
2) ..................
) ...................
....................
Works ............
...................
....................
vs. Monitori
nce Audit Ins
PM’s) ...........
RDPM’S) .......
nce Measure
....................
n‐Conforman
...................
....................
e Indicators
Site .............
te ................
roject and Ca
programme
...................
....................
....................
....................
....................
....................
....................
....................
....................
ork ...............
PMENTS .....
....................
te in the mo
....................
PM‐11) .........
....................
....................
....................
....................
...................
....................
ing Consulta
pection .......
....................
....................
es ‐ RUS&CP
....................
nces .............
...................
....................
as per World
....................
....................
amp site ......
and work m
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
nth of July 2
....................
....................
....................
....................
....................
....................
...................
....................
nt’s Audit ....
....................
....................
....................
M ................
....................
....................
...................
....................
d Bank guide
....................
....................
....................
ethod ..........
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
016 ..............
5
.......... 31
.......... 32
.......... 33
.......... 33
.......... 34
.......... 39
.......... 41
.......... 41
.......... 44
.......... 44
.......... 44
.......... 45
.......... 46
.......... 48
.......... 64
.......... 69
.......... 69
elines . 69
.......... 71
.......... 71
.......... 73
.......... 76
.......... 77
.......... 77
.......... 77
.......... 79
.......... 81
.......... 83
.......... 83
.......... 84
.......... 84
.......... 85
.......... 91
.......... 91
.......... 91
TNM
OPRC WorlMonthly Pro
7.1
7.2
7.3
7.4
8 PAY
8.1
8.1
8.2
9 APP
9.1
9.1
9.1
9.2
9.3
9.4
M TECHNOMANAG
ld Bank Project fogress Report No 22
.2 Key S
Contractor
Contractor
Review of
YMENTS & D
Disputes a
.1 Claim
Summary
PENDIX .......
Minutes o
.1 Minu
.2 Minu
MEC Meet
Correspon
Correspon
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
taff Present
r’s Construct
r’s Staff Pres
Contractor’s
DISPUTES ....
and Claims ...
m ..................
Man‐Hours o
..................
f Meeting ...
tes of Arbitr
tes of Disput
ting Agenda
ndence by M
ndence Recei
a Bathinda Netwo
at Site in Jul
tion Equipme
sent – July 20
s Staff ..........
...................
....................
....................
of Monitorin
...................
....................
al Tribunal M
te Resolution
....................
onitoring Co
ived .............
ork in Punjab (Ind
ly 2016 ........
ent’s July 20
016 ..............
....................
...................
....................
....................
ng Consultan
...................
....................
Meeting .......
n Board (DRB
....................
onsultant .....
....................
dia)
....................
16 ................
....................
....................
...................
....................
....................
t Team ........
...................
....................
....................
B) Meeting ..
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
...................
....................
....................
....................
...................
....................
....................
....................
....................
....................
....................
6
.......... 91
.......... 92
.......... 93
.......... 93
.......... 94
.......... 94
.......... 94
.......... 94
.......... 96
.......... 96
.......... 96
.......... 96
.......... 96
.......... 97
........ 101
TNM
OPRC WorlMonthly Pro
LISTO
Figure 2Figure 2Figure 2Figure 2Figure 2Figure 3Figure 3Figure 3Figure 3Figure 3Figure 3Figure 3Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6Figure 6
M TECHNOMANAG
ld Bank Project fogress Report No 22
OFFIGUR
2‐1 : OPRC Or2‐2 : Contract2‐3 : Organiza2‐4 : Major c2‐5 : OPRC N3‐1 : Rutting 3‐2 : Reverse3‐3 : Vegetat3‐4 : Road Se3‐5: Faded/d3‐6: Poor ma3‐7: Km stone6‐1: OPRC Ne6‐2: OPRC Ne6‐3: OPRC Ne6‐4: OPRC Ne6‐5 : OPRC Ne6‐6 : Fatal Cra6‐7 : Fatal Cra6‐8 : Fatal Cra6‐9 : Fatal Cra6‐10 : Fatal C6‐11 : Fatal C
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
RES
rganization Ct Administraation Chart ocomponents Network Map& Shoves re slope, rain cion control oection B8 – Pamaged Pavintenance ae 3, improveetwork – Secetwork – Secetwork – Speetwork – OPRetwork – Craash Locationash Locationash Locationash Locationrash Locatiorash Locatio
a Bathinda Netwo
Chart ...........ation Chart ..of Monitorinof Civil Worp ..................ecorded on Scuts & low son shouldersPoor maintenvement Marknd painting ement in wriction Length ction Length eeding & AligRC Network ash Trend ....ns at Sectionns at Sectionns at Sectionns at Sectionons at Sectioons at Sectio
ork in Punjab (Ind
....................
....................ng Consultanrks under OP....................S2 & B8 Roadshoulder ......s with manunance of Roaking on S1, Sof median kiting is requiv Number ov Number ognment as F– Fatality Tr.................... S1 .............. S2 .............. S3 .............. S4 ..............n S5 ............n B8 ............
dia)
....................
....................nt .................PRC project .....................d Sections ........................ual and mechad signs .......S5 & B8 Roadkerbs on B8 Rired ..............of Fatalities &of Crashes & actors in Crarend ........................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................hanical mean....................d Sections ...Road Section....................& Fatality RaCrash Ratesashes ...........................................................................................................................................................................
....................
....................
....................
....................
....................
....................
....................ns.........................................................n.......................................ates ..............s .......................................................................................................................................................................................................
7
.......... 13
.......... 15
.......... 16
.......... 17
.......... 18
.......... 26
.......... 27
.......... 29
.......... 30
.......... 32
.......... 33
.......... 34
.......... 79
.......... 80
.......... 81
.......... 82
.......... 82
.......... 85
.......... 86
.......... 87
.......... 88
.......... 89
.......... 90
TNM
OPRC WorlMonthly Pro
LISTO
Table 2‐Table 2‐Table 3‐Table 3‐Table 3‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 4‐Table 5‐Table 5‐Table 5‐Table 5‐Table 6‐Table 6‐Table 6‐Table 7‐Table 7‐Table 7‐Table 7‐Table 8‐Table 8‐Table 9‐Table 9‐
M TECHNOMANAG
ld Bank Project fogress Report No 22
OFTABLE
‐1 : Agencies‐2 : Network‐1 : Work Pro‐2 :Structura‐3 : Audit Sec‐1 : Accumul‐2 : Summary‐3: Managem‐4: Road Dur‐5 : Road Use‐6 : Summary‐7 : Managem‐8 : Road Du‐9 : Summary‐10 : Verifica‐11 : Verifica‐12 : Verifica‐13 : Verifica‐14 : Verifica‐15 : Verifica‐16 : Verifica‐17: Verificat‐18: Verificat‐19 : Verifica‐20 : Verifica‐21 : Verifica‐22 : Verifica‐23 : Verifica‐24 : Verifica‐25 : Verifica‐1: Complian‐2 : Status of‐3 : Status of‐4 : Status of‐1: OPRC Net‐2: OPRC Net‐3: OPRC Net‐1: Contracto‐2: Key Staff ‐3: Construct‐4 : Contact N‐1 : Man Hou‐2 : Man Hou‐1 : Correspo‐2 : Correspo
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ES
s and Key Pek Road Sectioogram Approal Capacity Dctions for thated Scores y of Networment Performrability Perfoer Service any Non‐Confoment Perforrability Perfoy of Non–Coation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audition of Audittion of Auditation of Audiation of Audiation of Audiation of Audiation of Audiation of Audiation of Audince as per Enf General facf Physical Enf Statuary Cletwork Crashtwork Fatalittwork – Sumor’s Key Stafof Professiotion EquipmNo. of Contrurs (for the murs (for the mondence Senondence Rec
a Bathinda Netwo
rsons involvons under OPoved vs. AchData (Pavemee Month of Submitted bk Performanmance Measormance Mend Comfort Pormances .....mance Measormance Meonformancesit – Section Sit – Section Sit –Section Sit – Section Sit – Section Sit – Section Sit – Section St – Section St – Section Sit – Section Sit – Section Sit – Section Sit – Section Sit – Section Bit – Section Bit – Section Bnvironmentacilities at Convironmentaearances Ap Details (Up ties Details (
mmary of Craff as per Cononal Engineeent as per Cractor’s Staffmonth of Julmonth of Julnt ..................ceived ..........
ork in Punjab (Ind
ved in the PrPRC projecthieved Progrent DeflectioJuly 2016 ....by Contractonce submittesures (MPM`easures (RDPPerformance....................sures (MPMeasures (RDPs of RUS&CPS1 – Km 0.00S2 – Km 2.24S2 – Km 15.0S2 – Km 45.0S2 – Km 60.0S2 – Km 65.0S2 – Km 75.0S4 – Km 0.00S4 – Km 5.00S4 – Km 15.0S5 – Km 5.00S5 – Km 15.0S5 – Km 20.0B8 – Km 9.20B8 – Km 15.0B8 – Km 20.0al Performanntractor Caml Aspects onpplicable for to July 2016(Up to July 2ash Statisticstract Agreem
ering Consultontract Agref Present at Sy 2016) – Key 2016) – No........................................
dia)
oject ...............................ress ..............ons) .................................or for Non‐Coed by Contra`S) SubmittePM`S) – Subme Measures –....................’s) ................PM’s) ...........M Measures0 to Km 5.0040 to Km 10.0 to Km 20.000 to Km 50.00 to Km 65.00 to Km 70.00 to Km 80. to Km 5.00 . to Km 10.0000 to Km 20.0 to Km 10.000 to Km 20.00 to Km 25.00 to Km 15.00 to Km 20.00 to Km 25.nce Indicatormp Site .........n Site ............project and6)…………………2016)…………s …………………ment and Prtant ..............eement/ PreSite ..............ey Experts ....on Key Exper........................................
....................
....................
....................
....................
....................onformanceactor ............ed by Contramitted by Co– Submitted............................................................s ..................00 .................00 ...............00 ................00 ...............00 ...............00 ...............00 ...................................0 ..................00 ...............
00 .................00 ...............340 ..............00 ................00 ................00 ...............rs as per .............................................. Camp site ..……………..…………………..…………………………esent at Site....................esent at Site ........................................rts .......................................................
....................
....................
....................
....................
....................es ......................................ctor .............ontractor ......d by Contract................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................…………………………………………………………e ...............................................................................................................................................................
8
.......... 14
.......... 17
.......... 19
.......... 23
.......... 25
.......... 41
.......... 42
.......... 42
.......... 42 tor ..... 43 .......... 44 .......... 45 .......... 45 .......... 47 .......... 48 .......... 49 .......... 50 .......... 51 .......... 52 .......... 53 .......... 54 .......... 55 .......... 56 .......... 57 .......... 58 .......... 59 .......... 60 .......... 61 .......... 62 .......... 63 .......... 69 .......... 71 .......... 71 .......... 73 ……. …78 ……. …78 ……. …83 .......... 91 .......... 91 .......... 92 .......... 93 .......... 95 .......... 95 .......... 97 ........ 101
SN
TNM
OPRC WorlMonthly Pro
1 PR
1.1
1.2
Sr. No.
RoadName
1 S1
2 S2
3 S3
4 S4
5 S5
6 B8
Total
M TECHNOMANAG
ld Bank Project fogress Report No 22
ROJECTH
Significan
Monitoring
Consultant
Monitoring
Network o
The Enviro
July 2016.
The Arbitra
the confer
between C
adjustmen
of the resp
MEC Meet
July 2016,
project wh
The Monit
submitted
Contract A
The Monit
of June 20
CrashRec
Total 8 cra
There were
Total num
The total n
crashes sa
While the
Network h
measures.
d e
Mar. 2
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
HIGHLIGH
ntEvents
g Consultant
t team and v
g Consultant
on 5th July 20
onmental and
al Tribunal h
rence room o
Claimant (Ch
nt formula, co
pondent’s co
ting between
to ensure ef
hich is the re
oring Consu
the non‐con
Agreement.
oring Consu
16 on 21 July
cordUpdat
shes were re
e two fatal c
ber of fatalit
number of cr
me time pre
total numbe
has risen shar
OP
013 to Nov. 2013
5
59
3
2
6
6
81
a Bathinda Netwo
HTSFOR
t’s Environm
visited the OP
t’s Data Anal
16 and held
d Social Expe
eld its 13th &
of the Institu
ief Engineer,
ontained in t
ounsel.
n Monitoring
ffective comm
quirement fo
ltant conduc
nformance re
ltant submit
y 2016, in ac
e
eported on t
crashes resul
ties in the 4t
rashes this ye
evious year (7
er of crashes
rply from 8 t
PRC Network
Dec. 20Nov.2
0
78
3
3
1
1
86
ork in Punjab (Ind
THEMON
ental Expert
PRC Network
yst & Statist
meetings wi
erts from Wo
& 14th Meetin
ution of engin
, PWD) and R
the contract
g Consultant,
munication a
or OPRC proj
cted the mon
eport on 10 J
ted Monthly
ccordance wi
the network
ting in 2 fata
h Year stand
ear (64) is do
74).
has come do
to 18, calling
k Crash Detai
013 to 2014
8
6
dia)
NTHOFJ
, Dr Asha Sh
k on 14th July
tician, Dr Vin
ith M/s PIPL
orld Bank vis
ng on 15 & 1
neers, to del
Respondent
. The Arbitra
, Employer a
and teamwo
ject (Please
nthly audit o
July 2016 to
y Progress Re
ith the Contr
for reporting
alities.
ds at 18.
own by 10, co
own, the num
for some ur
ils (Up to Jul
Dec. 2014 toNov. 2015
7
71
9
4
1
6
98
JULY201
arma, joined
y 2016.
ay Maitri, vis
Inventory M
ited the OPR
16th July, 201
iberate on m
(M/s PIPL), a
al Tribunal he
nd Contract
ork for the de
see Section 9
f the OPRC n
fulfil the req
eport (MPR)
ract Agreeme
g month of J
ompared to
mber of fata
rgent speed m
ly 2016)
o DecNo
16
d Monitoring
sited the OP
Management
RC Network o
6 in Chandig
matter of Arb
arising out pr
eard the argu
or was held
elivery of hig
9).
network and
quirement of
no 21 for th
ent.
uly 2016.
the number
lities on OPR
managemen
c. 2015 to ov. 2016
7
50
2
1
2
2
64
9
g
RC
team.
on 26th
garh in
bitration
rice
uments
on 29
gh quality
f the
e month
of
RC
nt
Total Crashes
19
258
17
10
10
15
329
s
TNM
OPRC WorlMonthly Pro
Crashes
Fatalitie
1.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
Dec Ja
s 5 6
es 0 0
Snapshot
MEC Mee
135
1
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
Cra
n Feb M
6 12 9
0 10 1
s–Pictoria
eting at MC
23
39
11
23
2 3
Total C
a Bathinda Netwo
ashes 4th Yea
Mar Apr M
9 8
1 2
alOverview
Office
5059
3240
4 5
Crashes
Third
ork in Punjab (Ind
ar (Dec. 2015
May June
9 7
3 0
w
6368
4956
6 7
s This Ye
d Year
dia)
5 to Nov. 20
July Aug
8
2
Arbitratio
7481
64
8 9
ear v Las
Fourth Year
016)
Sep O
on Meeting i
8793
10 11
st Year
Oct Nov
n Chandigar
98
12
10
Total
64
18
rh
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
MC
a Bathinda Netwo
C Key Experts
Fatal
Fatal
ork in Punjab (Ind
s meeting Co
Crash on S2
Crash on S2
dia)
ontractor's Te
2 Road
2 Road
eam
11
TNM
OPRC WorlMonthly Pro
T
M TECHNOMANAG
ld Bank Project fogress Report No 22
Traffic Contr
Contr
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
World
rol during Ro
ractor's shou
a Bathinda Netwo
Bank Enviro
oad Works
ulder rectific
ork in Punjab (Ind
nmental Exp
MC
ation and ve
dia)
pert on S2 Ro
C inspecting c
egetation con
oad Site
construction
ntrol mainte
of Culvert C
nance
12
Catch Pit
TNM
OPRC WorlMonthly Pro
2 PR
2.1
M TECHNOMANAG
ld Bank Project fogress Report No 22
ROJECTO
Backgrou
The Goverhas allottePatel InfraRajkot, foBathinda cdate on co
This contManagemMaintenanContractorroutine mpavement emergency
TechnologConsultingof the MoBoard, a sBoard ActConsultanc
The OrganFigure 2‐1
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
OVERVIEW
und
rnment of Pued the worksastructure Por 203.68 kmcontract areaompletion is 4
ract is an ent Contrance works or is responsiaintenance rehabilitatioy works.
gy and Mang Services Ltonitoring Constatutory bot, 1998 (Pucy services w
isation Chart.
F
a Bathinda Netwo
W
unjab (GOP)s for ImprovPvt. Ltd Patcms of its sta. The contr4th Decembe
Output anact) for Imf roads andble for the owork, desigon and impr
nagement Litd, India, wansultant (MCody establishnjab Act N
will be for a p
t of Output a
Figure 2‐1 : O
ork in Punjab (Ind
through Punvement, Rehacon House, tate road nact has starter 2022.
nd Performaprovement, allotted unoverall manan and constrovement wo
imited, Israes selected aC) on behalfhed under thNo. 22 of 1period of five
and Perform
OPRC Organ
dia)
njab Public Wabilitation a2nd Floor, K
network comted on 5th De
ance basedRehabilitat
nder Contracagement of ttruction of torks and the
el, in assocs the preferf of Punjab Rhe Punjab R1998). The e (5) years.
ance based
ization Char
Works Depand Routine MKotecha Chomprising ofecember 20
d Road Contion, Resurfct no. PSRSPthe networkthe requirede manageme
ciation with red bidder tRoads and BRoads and Binitial term
Road Contra
rt
artment, PWMaintenanceowk, Kalawathe Sangrur12 and the e
ntract (OPRfacing and P/WB/OPRC/k, including ad surfacing ent of any n
ICRA Manao undertakeBridges DeveBridges Deve
of the Mo
act is given in
13
WD (B&R) e to M/s ad Road, r‐Mansa‐expected
RC)(Asset Routine
/ICB. The all of the renewal, necessary
agement e the role elopment elopment onitoring
n
TNM
OPRC WorlMonthly Pro
2.2
M TECHNOMANAG
ld Bank Project fogress Report No 22
Agencies
Agencies a
T
EMPLOYER
CLIENT
EMPLOYERREPRESEN
FUNDING A
MONITORCONSULTA
CONTRACT
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
Involvedin
and key perso
Table 2‐1 : A
AGE
R
R’S TATIVE
AGENCY
ING ANT
TOR
a Bathinda Netwo
ntheOPRC
ons involved
Agencies and
ENCIES &KEY
PUNJABPROJEC
PUNJABDEVELO
CONSTR(B&R) ‐
INTERNDEVELO
TECHNOMANAGMANAGSERVICE
DATE M
DURATI
PATELINLTD
DURATI
START D
DATE O
END DA
VALUE O
ork in Punjab (Ind
Project
d in OPRC pr
d Key Person
Y PERSONS IN
B STATE ROACT (PSRSP)
B ROADS ANDOPMENT BOA
RUCTION DIV‐ SANGRUR
ATIONAL BAOPMENT (IBR
OLOGYAND GEMENT LIMGEMENT CONES LIMITED
MOBILIZED O
ION OF CONT
NFRAESTRUC
ION
DATE
F SIGNING O
ATE
OF CONTRAC
dia)
roject are pre
ns involved i
NVOLVED IN
AD SECTOR
D BRIDGES ARD (PRBDB)
VISION PWD
ANK FOR RECRD)
MITED ‐ ICRA NSULTING
N
TRACT
CTURE PVT.
OF CONTRAC
CT SIGNED
esented in Ta
n the Projec
N THE PROJEC
Mr. YogChief En
)
Mr. YogProject Mr. AniDeputy
Mr. GurExecutivMr. PawSub Div
CONSTRUCTIO
Mr. HaiPresidenMr. YogTeam LeManage
Octobe
5 years
Mr. ArvManagiMr. MuRoad M
10 Year
Decemb
T Decemb
Decemb
INR 596
able 2‐1.
ct
CT
gesh Gupta ngineer‐ PSRS
gesh Gupta Director l Kumar ShaProject Dire
rmukh Singhve Engineer wan Kumar Gvisional Engin
ON AND
m Bonjack nt gendra Bhatneader/Projecer
r 7, 2014
vind Bhai V. Ping Director kesh Kumar
Manager
rs
ber 5, 2012
ber 10, 2012
ber 4, 2022
6.36 Crores
14
SP
rma ctor
Garg neer
nagar ct
Patel
2
TNM
OPRC WorlMonthly Pro
2.3
2.4
2.5
M TECHNOMANAG
ld Bank Project fogress Report No 22
ContractA
Contract ad
Organisat
The appoRepresentOPRC proje
The ConsuConditionsof the Conpotential runder the
As a repreadministraperformedassessmen
Responsib
The Monito
Monitoring
Overall moachieving a
Evaluationconstructe
EvaluationThe Emplo
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
Administra
dministratio
tion&Resp
ointed Monative in impect.
ultant will rs of an Outpnsultant’s rorisk to the Emworks contr
sentative of ation of thed by the Contnt of the CE´s
bilitiesofth
oring Consul
g the perform
onitoring of tand maintain
n of the qualied and maint
n and recommoyer.
a Bathinda Netwo
ationChart
n chart is giv
Figure 2‐2
ponsibilitie
itoring Conlementing a
represent thut and Perfole is to provmployer by vact within th
the Employe Contract atracting Entits technical pe
heMonitor
ltant is respo
mance of the
the road conning the requ
ty and residutained by the
mendation o
ork in Punjab (Ind
ven in Figure
: Contract A
es–Monitor
nsultant isnd maintain
he Client asormance basvide timely averifying the he stipulated
er, the Monand for thety for the Civerformance.
ringConsul
onsible for:
e Contractor
nstruction beuired and de
ual life of roae Contractor
of designs pro
dia)
e 2‐2
Administratio
ringConsul
responsible ing an appro
s the Projeced Road Conand orderly achievemen
d time and bu
itoring Conse verificationvil Works. Th
tant
r, based on th
eing done by esigned level
ad pavemenr.
oposed by th
on Chart
ltant
for assistiopriate regim
ct Manager ntract. Accorrequired advnt of all contrudget.
ultant will bn of works he above inc
he approved
the Contracs of service.
t, presented
he Contracto
ing the Emme for mana
under the rdingly, the ovice to minimractual requ
e responsibland serviceludes the co
d Work Progr
ctor, based o
d, designed,
or for accepta
15
mployer’s aging the
General objective mize any irements
e for the es to be ntinuous
ram.
n
ance to
TNM
OPRC WorlMonthly Pro
2.6
2.7
M TECHNOMANAG
ld Bank Project fogress Report No 22
Evaluationand Resett
Managing control of
Monitoringupdating s
The reviewapprovals
Review anusing tech
ProjectOr
Figure 2‐3Consultant
BasicCon
The OPRC The Contralevels on managemehanding ov
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
n and monitotlement & Re
the Quality Athe Contract
g, overall supsubmitted by
w of all technof the mont
d monitor thnology accep
rganization
3 shows the t and the rel
Figure 2‐3
ntractFeatu
methodologactor is paidthe roads (ent of the faver the road
a Bathinda Netwo
oring of the pehabilitation
Assurance oftor.
pervision andy the Contrac
nical documehly billing pr
he process leptable to the
n
internal distationship wi
: Organizati
ures
gy optimisesd for output(level of sercility and asin a certain
ork in Punjab (Ind
performancen Plan by the
f the roads a
d recommenctor.
entation requesented by t
eading to thee Client.
tribution of th the Client
on Chart of
use of resouts, the mainrvice) underssociated righquality to th
dia)
e of EnvironmContractor.
and bridges a
ndation for a
uired for paythe Contract
e creation an
all membert and Contra
Monitoring
urces to provntenance serr contract aht of way due Client at th
mental Impac
and monitori
cceptance o
yment and retor.
d updating o
rs of the stactor.
Consultant
vide maximarvice of ensand specific uring the conhe end of the
ct Managem
ing the quali
of data for inv
ecommendat
of the asset d
ff of the Mo
al “value for uring certainimproveme
ntract periode contract pe
16
ent Plan
ty
ventory
tions for
database
onitoring
money”. n quality ents, the d and for eriod.
TNM
OPRC WorlMonthly Pro
2.7
RoaCod
S1
S2
S3
S4
S5
B8
Tota
M TECHNOMANAG
ld Bank Project fogress Report No 22
7.1 Projec
AccoWor
Figu
The inte
ad de
N
1 Sangru
2 BhawanSH13 In(SH12A
3 Barnala
4 Mansa interse
5 Dhanau
8 BathindSabo (u(SH17)
l Length of c
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ctBrief
ording to thrk Contract a
ure 2‐4 : Ma
roads undrvention are
Table 2‐2
ame of Road
r ‐ Sunam (M
nigarh ‐ Sunantersection ‐A)
a ‐ Mansa: (S
–Talwandi Sction with B8
ula ‐ Bhikhi: (
da ‐ Kotshamup to interse
contract area
a Bathinda Netwo
he Contractoare illustrate
ajor compon
der the OPe given in Tab
: Network R
d Section
MDR 21)
am ‐ Bhikhi ‐‐ Kotshamir:
SH13)
Sabo (up to 8): (ODR9)
(MDR 14)
mir–Talwandiction with S4
a (kms)
ork in Punjab (Ind
or’s Bidding d in Figure 2
nents of Civil
RC Contractble 2‐2 and i
Road Section
Classific
MD
‐ SH
SH
OD
MD
i4):
SH
dia)
Document,2‐4.
l Works unde
t and theirllustrated in
ns under OPR
cation Len(k
DR 1
H 10
H 7
DR 24
DR 25
H 28
203
the major
er OPRC pro
r main featFigure 2‐5.
RC project
ngth km)
Ty
1.3 RehaResu
6.13 Impr(widResu
.29 RehaResu
4.97 Impr(widResu
5.34 RehaResu
8.65 RehaResu
3.68
component
oject
tures and t
ype of interv
abilitation anurfacing
rovement Wening) and urfacing
abilitation anurfacing
rovement Wening) and urfacing
abilitation anurfacing
abilitation anurfacing
17
ts of the
types of
vention
nd
Works
nd
Works
nd
nd
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figu
ure 2‐5 : OPRC N
18
Network Map
8
TNM
OPRC WorlMonthly Pro
3 W
3.1
YEAR
1 (2013)
2 (2014)
3 (2015)
4 (2016) (Balance of 3
rd
year)
5 (2017)
6 (2018)
7 (2019)
8 (2020)
9 (2021)
10 (2022)
Contract Total (km)
*ROB
3.1
M TECHNOMANAG
ld Bank Project fogress Report No 22
ORKPRO
Improvem
The detailsper the coachieved f
The achievthe table.
It should bPIPL) from2014.
The progrework progeffect on tthe contra
IM
As per Contrac
t
AApW
Pro
27.20 27
47.60 24.935.8
54.10 40
0.00 5
0.00
0.00
0.00
0.00
0.00
0.00
128.90
B length exclud
1.1 Works
In tapp(i) Fi.e. imp
WitConBhi
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
OGRESS‐
ment,Rehab
s of the apprntract for thigures at the
ved progress
be noted that December 2
ess of work igramme) wathe efficiencyct.
Table 3‐1 :
PROVEMENT
As per pproved Work ogramme
Ac
.20 (S2) 25
97(S4) & 84 (S2)
24
0.87 (S2) 21.10.5
52.42
6.7.5.95.5
9
ded.
sDone‐Fir
the first yeaproved workFrom km 2.2in village G
provement w
th regard tontractor fulfkhi (S5)(leng
a Bathinda Netwo
SUMMAR
bilitationa
roved work phe remaininge end of the f
s during the
t the summa2012, prior t
in the seconas appreciaby and effect
Work Progra
chieved As Con
c
5.91(S2) 0.
.44 (S4) 7.
100 (S2) & 530 (S4)
0.
00 (S2)85 (S2) 900 (S2) 510 (S2), LHS
25
5.
2.
34
0.
0.
0.
97.24 74
stYear
ar of contrack program. It240 to km18.harachon (iiworks in the f
o the rehabifilled the regth of 25.340
ork in Punjab (Ind
RYANDC
andResurfa
program for g time (6 yeafirst year, se
fourth year
ary includes to the mobil
d year as webly behind sciveness of ro
am Approve
REHAB
per ntract
As per AWork Pro
00 25.34
29 11.30
00 7.29 (S3
(S
.34 3
05
20
4.90
00
00
00
4.78 49
ct, the Contt complied w.150 (except ) from km 6first year.
litation worhabilitation 0 km).
dia)
COMMEN
acingWork
the first fours) are summcond year an
r (balance w
the works caization of M
ell as in the tchedule. Thoad network
ed vs. Achiev
BILITATION
Approved ogramme
Ac
4 (S5) 25
0 (S1)
3) & 2.20 S2)
11.
3.6
9.73 3
ractor fulfillwith the imprthe road sec7.840 to km
rks as per thpertaining t
NTS
ks
r years and tmarised in Tand the third
work of 3rd ye
arried out byMonitoring Co
third year (ehis delay mak operations
ved Progress
chieved As pCont
.34 (S5) 34.
0.00 0.0
125 (S1) 0.0
3.41* 11.
23.
10.
0.0
56.
68.
0.0
39.875 203
ed the requrovement of ction from k
m 79.000. For
he approvedto the road
the work proable 3‐1. Furyear are also
ear) is also s
y the contraconsultant in
extension of ay have detover the du
RESUR
per tract
As per AWork Pr
.20 0.
00 0.
00 28
.30
.60
.20
00
.00
.30
00
3.60 28
uirements asf road sectiokm 8.400 to kr a total of 2
d work progsection Dha
19
ogram as rther the o shown.
shown in
ctor (M/s October,
2nd year trimental ration of
RFACING
Approved ogramme
Ac
.00
.00 28.
8.65 0
8.65 2
s per the ns S2 i.e. km 9.400 26.07 km
ram, the anaula –
hieved
0.00
65 (B8)
0.00
28.65
TNM
OPRC WorlMonthly Pro
3.1
3.1
3.1
M TECHNOMANAG
ld Bank Project fogress Report No 22
1.2 Works
Imp201thethekmclea
Reh2nd thicDis
Res37.woconAftreh
Duesec
1.3 WorkD
Duesec(PSsubbalCon0.0Jun
TheyeaS1)
Thepav67.
1.4 Works
TheexeThewoEmare
As the
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
sDone‐Sec
provement w14 as per the road lengthe work on the 79.000 andarance of for
habilitation wyear (2014)ckness of thpute Review
surfacing wo850). Howerks executensidered as rer the 15thhabilitation o
e to the abovctions (S1 and
Done‐Thir
e to the dection, the 2nd
RSP) approbmitted the ance works ntractor was0 to km 11.3ne, 2015 resp
e balance woar. The Empl and up to05
e works forvement of S840 were co
sUnder‐Fo
e Contractoecuted in theese works arrk programmployer for ape to be impro
per the appe 4th year of
a Bathinda Netwo
condYear
works of 47he approvedh of 24.44 kme other roadd km 108.77rest land.
work for the , however thhe pavemenw Board (DRB
ork in the 2n
ver, the Cod from km rehabilitationh DRB meeof B8 road, th
ve reasons, td S2) in the s
rdYear
esign disputedyear work pved it as revised worfor accepta
s started the300) on 29thpectively.
orks of S1 anloyer was gr5th Dec, 201
r 3rd year S2 road fromompleted. Th
ourthYear
r had subme 4th year oe to be execme has beenpproval. Undoved and 3.6
proved work the contract
ork in Punjab (Ind
7.60 km werwork progr
m correspondd sections i.e70 (total 29.7
road length he work did nt overlay. TB). d year was cntractor had9.200 to kn or resurfacting the dehe resurfacin
the Contractsecond year.
e of S1 roaprogramme extension ork programmance of the e rehabilitatih May, 2015
nd S2, schedranted the t5 (for S2) res
(2nd year bm km 45.200he completio
Programm
mitted the rof the contrauted in the 4n accepted bder the 4th y km road len
programmet
dia)
re planned tramme. Howding to Sectioe. S2 betwee77 km on ro
of 11.3 km fnot commeThe Contrac
completed ind raised them 15.000 scing. The casecision was ng would be
tor did not fu.
d and non‐was shiftedof 2nd year me in June, Monitoringon and imprand S2 (from
uled in the 2ime extensiospectively.
balance wor0 to km 54.0on of minor w
e
revised 3rd act) for the 4th year of ty the Projecyear work prngths are to b
e the followi
to be compwever, the Con S4 and wen km 32.000oad section
for S1 sectioence due toctor forward
n the Sectioe dispute reection, whese has been conveyed tconsidered.
ulfil the work
clearance o to 3rd yearwork prog
2015 to comg Consultantrovement wm km 45.20 t
2nd year, weon up to 15
rks), the im000 and froworks is still i
year work acceptancehe contract. t manager arogramme 52be rehabilita
ing works ar
leted by NoContractor im
was unable to0 and km 67S2) due to t
n was plannthe dispute ded the case
n B8 (km 9.egarding theether this shreferred to that the ins
k programme
f forest on r and Chief gramme. Complete the 2t and the Eorks on S1 (to km 67.84)
ere shifted inth August, 2
mprovement m km 55.70in progress.
programmeof Project MThe revised
and forwarde2.42 km roadated.
re to be exe
20
ovember, mproved o execute .840 and the non‐
ed in the over the e to the
200 –km e type of hould be the DRB. stead of
e of road
S2 road Engineer ontractor 2nd year mployer. from km ) 0n 03rd
n the 3rd 2015 (for
of road 00 to km
e (to be Manager. 3rd year ed to the d lengths
ecuted in
TNM
OPRC WorlMonthly Pro
3.1
3.1
M TECHNOMANAG
ld Bank Project fogress Report No 22
Improve
Km 8.40
Km 18.1
Km 28.5
Km 40.7
Km 79.1
Total Le
Rehabili
Km 24.6
Km 26.4
Km 27.6
Total Le
1.5 WorkP
Durto pro
Dursec
Durfrocom
Dur28.
Dur95.
1.6 Change
Undhad Brid Vari
Vari
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ement of Bha
0 to km 9.40
50 to km 24
00 to km 39
00 to km 45
50 to km 108
ngth (kms)
tation of Su
to km 26.40
00 to km 27
00 to km 28
ngth (kms)
Progress‐F
ring the monkm 24.400
ogress.
ring the moction from km
ring the monm km 79.00mpleted.
ring the mo600 to km 34
ring the mon010 (LHS) ha
einPropos
der Section Vapproved th
dge Widening
ation Order
ation Order
a Bathinda Netwo
awanigarh‐S
000
.5,00
.300
.200
8.770
nam portion
00 (less ROB
.60 (initially
.600
FourthYea
nth of Marchhas been c
onth of Aprim 24.400 to k
nth of May 00 to km 8
nth of June 4.500.
nth of July 20as been com
sal:
VII – General he variations
g:
No.1: WidcleaBhik
No.2: WideachBha
ork in Punjab (Ind
Sunam‐Bhikh
n S2 road
400m)
included as i
rProgramm
h 2016, the completed.
l, 2016, bitukm 28.600 (l
2016, the bi83.570 and
2016, 5.9 k
016, 5.510 kmpleted.
Conditions, s for:
dening of exisar span) overkhi‐Kotshamdening of exh c/c over Kowanigarh‐Su
dia)
hi‐Kotshamir
improvemen
me
bituminous wThe exec
uminous woess the ROB
ituminous wfrom km 8
m of S2 roa
m (LHS) of S2
Clause 63, C
sting bridge r Lisara Drainir road (S2) .xisting bridgotla Branch Cunam‐Bhikhi‐
r Road (S2)
1.
6.
10
4.
29
52
1.
nt work) 1.
1.
3.
work of S2 rution of mi
ork for rehab) has been c
work for impr86.200 to km
d have been
2 road betwe
Change in Pro
at Ch 100+7n crossing Bh e 2 span 3.Canal at RD 5‐Kotshamir R
0 km
35 km
0.8 km
5 km
9.77km
2.42
4 km
2 km
0km
6
road from kminor works
bilitation of ompleted.
rovement ofm 89.500 h
n improved
een km 89.5
oposal, Empl
00 (5x9.5m ehawanigarh‐S
.50m clear &54+040 (SkewRoad (S2).
21
m 18.150 is under
S2 road
f S2 road has been
from km
00 to km
oyer
each Sunam‐
& 3.60m w in 250)
TNM
OPRC WorlMonthly Pro
3.2 Ro
3.2
RSeN
M TECHNOMANAG
ld Bank Project fogress Report No 22
Vari
Vari
4‐L
Vari
Vari
Vari
oadDurabi
2.1 Rough
Concolle
In ththe
Road ction No.
Road
S2 BhawBhikh
S1 Sang
S2 BhawBhikh
S4 Man
S5 Dhan
B8 BathSabo
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ation Order
ation Order
anning of Ro
ation Order
ation Order
ation Order
ility’sOverv
hness
tractor has ect the rough
he month of following ro
d Section Nam
wanigarh‐Sunhi‐Kotshamir
grur Sunam
wanigarh‐Sunhi‐Kotshamir
sa Talwandi
naula Bhikhi
inda Talo
a Bathinda Netwo
No.3: WideachTalw
no. 4: WideachSun250)
oad sections
No.5: For Roa
No. 6: For 4(S2)
No. 7: For 4(S2)
view
procured thhness (IRI) d
f June and Juad sections:
me Roa
Fro
nam‐r
24.4
27.
79.0
86.
0.00
nam‐r
2.24
18.4
45.
55.7
68.0
Sabo 0.00
0.00
lwandi 9.20
ork in Punjab (Ind
dening of exh clear) ovewandi Sabo rdening of exh c/c over am‐Bhikhi‐K)
s:
4‐lanning rod (S2) in Bhi4‐lanning of in Cheema T4‐lanning of in Maur Tow
e Profilometata of the ne
uly 2016, Con
ad Section
m (km) To
400 26
200 28
000 83
200 89
00 11to
40 18
400 24
200 54
700 67
000 79
00 24
00 24km
00 37
dia)
isting bridgeer Lisara Draroad (B8) xisting bridgKotla Brancotshamir ro
oad of Bhawakihi Town froBhawanigarTown from CBhawanigarwn from Ch 8
ter in the metwork roads
ntractor has
o (km)
6.400
8.530
3.560
9.500
1.300 (excepCh 3+085)
8.150
4.400
4.000
7.800
9.000
4.970
4.800 (exceptm 24.800 to k
7.850
e at RD 20+ain crossing
ge 3 span 3.ch Canal crooad (S2) at R
anigarh‐Sunaom Ch 54+03rh‐Sunam‐BhCh 39+300 torh‐Sunam‐Bh84+030 to Ch
month of Juns.
collected th
pt from Ch
t city portionkm 25.340)
+600 (6 spanBathinda‐Ko
.00m clear &ossing BhawRD 73+450
am‐Bhikhi‐Ko30 to Ch 55+hikhi‐Kotshamo Ch 40+700.hikhi‐Kotshamh 86+060.
e 2016 and
e roughness
Rem
DatJun
2+940 DatJuly
DatJuly
DatJuly
n from DatJuly
DatJuly
22
n 8.70 m otshamir‐
& 3.60m wanigarh‐(skew in
otshamir +700. mir Road . mir Road
starts to
s data for
marks
ta collected ne 2016 end
ta collected y 2016
ta collected y 2016 end
ta collected y 2016 end
ta collected y 2016 end
ta collected y 2016 end.
in
in
in
in
in
in
TNM
OPRC WorlMonthly Pro
3.2
M TECHNOMANAG
ld Bank Project fogress Report No 22
Conprocof tConConuseddo tMC.
2.2 Structu
The of Mi.e. IRC
The and 68.0S5 (inte
The com95thcurv
The km MonAgrechar
Pavement lo
Group 2 (S4,S5,B8)
Group 3 RoaS2, S3)
The this
Duriroad
Duriroadkm 8
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
tractor has cess the collthe requiredsultant andsultant (MCd to processthe same. So
uralCapaci
pavement dMonitoring Co(S1&S2 for 1115: 2014 al
pavement dS4 (from km
000 to 79.00(from km 0rmediate lan
pavement mplying with h percentilevature confir
FWD data o54+000 andnitoring Coeement. Theracteristic cu
Table 3‐2 :S
oading categ
Roads 50
ads 100 msa
FWD data fmonth and t
ing the mond from km 18
ing the mond sections of89.500. The
a Bathinda Netwo
procured thected roughd software, d to accept) has alread the collecteo the data is
ityData(Pa
deflections wonsultant wi100 MSA, S4ong the inne
deflection dam 0.000 to km0) for inner 0.000 to kmne road widt
deflections the requirem
e value of rmed as show
on the newly from km 55nsultant ane 95th percurvature conf
Structural Ca
ory MaxiCent
msa < 0.8
a (S1, < 0.8
for road lengthe analysis
nth of June 28.400 to km
nth of June 2f S2 road i.eresults for th
ork in Punjab (Ind
e profilomethness data hathe IRI da for fulfildy conveyeded roughnesonly submitt
avementDe
were recordeith FWD for t4 & S5 for 50er (LHS & RH
ata was collm 25.340), Sand outer w
m 25.340) foth.
data for tments of Clapavement cwn in the Tab
constructed5+700 to kmnd analysedentile valuefirmed as me
apacity Data
imum Cral Deflectio
80
80
gth from kmof the data i
2016, the FW24.400.
2016, the FW. From km 7he above me
dia)
ter at OPRC as not been ata cannot the contrac to the Cons data at sitted by the C
eflections)
ed by Contacthe improve0 MSA) for eHS) and the o
ected for S12 (from km 2
wheel paths (or outer wh
the above ause 8.2.3 ofcharacteristible 3‐2.
d road sectiom 67+850 wd as per t of pavemeentioned in t
(Pavement
Characteristicon D0 (mm)
m 18.400 to is under proc
WD data ana
WD data wa78.500 to kmentioned sec
project site arranged atbe verified ctual requirtractor to ae but till datContractor bu
ctor (PIPL) ud and rehabeach traffic louter (LHS &
1 (from km 02.240 to km (left and righheel path o
mentioned f the contracc deflection
ns of S2 roadwas collectethe requireent charactethe Table 3‐2
Deflections)
c MinimumCurvatur
< 0.1
<0.1
km 24.400 wcess.
alysed for th
s collected am 83.560 andtions are sum
but the soft site. In the by the Moements. Moarrange the te Contractout not verifie
nder the supilitated roadloading grouRHS) wheel
0.000 to km18.150 and ht side lanesonly because
roads sectct agreemenn and chara
d from km 4d in the preements of ristic deflec2.
)
m Charae D0‐D200 (m
was collecte
he road secti
and analysedd from km 8mmarized be
23
ftware to absence onitoring onitoring software or fails to ed by the
pervision sections up as per paths.
m 11.300) from km ) and for e of the
ions are nt i.e. the acteristic
5+200 to esence of Contract tion and
acteristic mm)
ed during
ion of S2
d for the 86.200 to elow:
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
NetworkP
To fulfil thfor the mo
The audit Consultantsections.
S
S
1
2
3
4
1
2
3
4
Sl No
Sl No
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
Performan
e requirementh of July, 2
details ant against eac
From
1 78+9
2 79+0
3 80+0
4 81+0
5 82+0
6 83+0
From
1 78+9
2 79+0
3 80+0
4 81+0
5 82+0
6 83+0
l No.
l No.
From
86+200
87+020
88+020
89+020
From
86+200
87+020
88+020
89+020
o. Cha
o. Cha
a Bathinda Netwo
nceWorks’O
ent of the Co2016 are sum
nd summarych RUS&CPM
m To
900 79+000
020 80+000
020 81+000
020 82+000
020 83+000
020 83+560
m To
900 79+000
020 80+000
020 81+000
020 82+000
020 83+000
020 83+560
Chainage
Chainage
To
87+000
88+000
89+000
89+500
To
87+000
88+000
89+000
89+500
inage
inage
ork in Punjab (Ind
Overview
ontract Agremmarised be
y of non‐coM, MPM and
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
0 RHS 0
Oute
Side
Inne
9
Perc
Value
Side 9
Perc
Value
RHS
RHS
RHS
RHS
RHS
RHS
RHS
RHS
Oute
Side 9
Per
Valu
Inne
Side 9
Per
Valu
dia)
eement, the elow in Table
onformancesd RDPM are
0.66 0
0.65 0
0.61 0
0.65 0
0.62 0
0.54 0
0.63 0
0.69 0
0.65 0
0.6 0
0.6 0
0.53 0
er Wheel Path
Ave
Defle
(m
er Wheel Path
5th
centile
e (mm)
5th
centile
e (mm)
Ave
Defle
(m
0.51 0
0.60 0
0.62 0
0.52 0
0.51 0
0.59 0
0.56 0
0.6 0
er Wheel Path
95th
rcentile
ue (mm)
Ave
Defl
(m
er Wheel Path
95th
rcentile
ue (mm)
Ave
Defl
(m
randomly see 3‐3:
s adjusted explained i
.08 LHS
.07 LHS
.07 LHS
.07 LHS
.08 LHS
.07 LHS
.08 LHS
.06 LHS
.07 LHS
.07 LHS
.07 LHS
.07 LHS
erage
ection
mm)
Side
Sideerage
ection
mm)
0.07 LHS
0.07 LHS
0.07 LHS
0.07 LHS
0.07 LHS
0.06 LHS
0.07 LHS
0.06 LHS
h
erage
ection
mm)
Sid
erage
ection
mm)
Sid
elected audit
by the Mon the follow
0.54
0.65
0.59
0.65
0.6
0.62
0.44
0.65
0.64
0.69
0.63
0.61
95th
Percentile
Value (mm)
95th
Percentile
Value (mm)
S 0.63
S 0.61
S 0.57
S 0.58
S 0.56
S 0.59
S 0.57
S 0.56
e 95th
Percent
Value (m
e 95th
Percent
Value (m
24
t lengths
onitoring wing sub‐
0.08
0.07
0.07
0.07
0.07
0.07
0.07
0.08
0.07
0.06
0.07
0.08
Average
Deflection
(mm)
Average
Deflection
(mm)
3 0.07
1 0.07
7 0.07
8 0.07
6 0.07
9 0.06
7 0.06
6 0.06
h
tile
mm)
Averag
Deflecti
(mm)
h
tile
mm)
Averag
Deflecti
(mm)
ge
on
)
ge
on
)
TNM
OPRC WorlMonthly Pro
Sl. No.
1 S
2 B(S
3 MR
4 D
5 BIn
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
angrur ‐ Sun
BhawanigarhS2)
Mansa‐TalwaRamtirathjaga
Dhanaula‐Bhi
Bathinda‐Kotntersection w
3.1 Pavem
Durmai
Thesect
The
On 13.3
The
S2: (km
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
Table 3‐3
Name of
nam Road (S1
‐Sunam‐Bhik
andi Saboa (S4)
ikhi Road (S5
shamir‐Talwwith S4
mentMainte
ring the audiintained as p
e28 to 30mmtion.
e cracks were
B8 road the395 to km 13
e deficiencies
m 2.240 to km
a Bathinda Netwo
3 : Audit Sec
f Road
1)
khi‐Kotsham
o Road
5)
wandi Sabo
Total Audit
enance(RU
it inspectionper the requi
m rutting wa
e also found
e slippage an3.400, LHS.
s recorded u
m 3)
ork in Punjab (Ind
ctions for the
ir Road
Up to
Road upto
t Length (km
US&CPM‐1)
for the mored level of s
as recorded
between km
nd shoving w
nder RUS&C
dia)
e Month of J
Section Code
S111
S211 S213 S219 S221 S223 S225
S411 S412 S414
S512S514 S515
B811 B812 B813
ms)
nth of July 2service.
between km
m 17.000 to k
was observed
CPM‐1 are pr
S2:
July 2016
Cha(from km
0.000 t
2.240 t15.000 t45.000 t60.000 t65.000 t75.000 t
0.000 5.000 t15.000 t
5.000 t15.000 t20.000 t
9.200 t15.000 t20.000 t
2016, all the
m 2.420 to k
km 18.000 of
d more than
resented in F
(km 2.240 t
inage m ‐ to km)
to 5.000
to 10.000 to 20.000 to 50.000 to 65.000 to 70.000 to 80.000
to 5.000 o 10.000 to 20.000
o 10.000 to 20.000 to 25.340
o 15.000 to 20.000 to 25.000
e audit sectio
km 2.460 of
f S2 road.
n 50mm betw
Figure 3.1
o km 3)
25
Length (kms)
5.000
7.760 5.000 5.000 5.000 5.000 5.000
5.000 5.000 5.000
5.0005.000 5.340
5.800 5.000 5.000
83.90
ons were
f S2 road
ween km
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
B8: (
Fig
3.2 Unseal
Theon a
ThefromobsConexpreq
On 4.50
On The63.070.0
On 5.00
On shoshoEmpconthe
On
On wer
Conmatsho
Thenoruns
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
(km 9.2 to 15
gure 3‐1 : Ru
ledShoulde
e improvemeall road secti
e extra soil atm the edges erved at sontractor has edite the wuired ratio a
S2 road sec00 to km 4.9
S2 road, lowe rain cuts a000. Low sho000.
S5 road sect00 to km 10.
S5 road seulder was opkeepers anployers interducted withdrainage sys
S3 road, the
B8 road sectre observed
ntactor also terial in 80/2ulders.
e road sectiomal such asealed should
a Bathinda Netwo
5)
utting & Shov
erMainten
ent was obseions.
t the edge oto facilitateme of the astarted to rork and finiss per the spe
ction, the re00 RHS and
w shoulder wand erosion oulder and r
tion, the low000.
ction betweobserved. Asnd the villagervention is rh the villagerstem of the r
e laying of se
tion betweebut the wate
maintaining20 ratio. This
ns where ths the locatiders should b
ork in Punjab (Ind
ves recorded
ance(RUS&
erved to mai
of the shoulde the drainagaudit sectionremove the sh the slopeecifications.
everse slopebetween km
was observedof shoulderrain cuts we
w shoulder a
een km 24.0 intimated bers were oppequired. Thrrs and ‘Gramroad section
ewer was in p
n km 15.960er drained ou
the unseales shows the g
he wear and ons near dhbe maintaine
dia)
B
d on S2 & B8
&CPM‐2)
ntain the se
ders was obsge. The erosns but rectifexcess soil fes of the sho
and rain cum 4.900 to km
d at few locas was obserere also obse
nd reverse s
000 to km by the Contrposed the shrough LRC, tm Panchyats’ s.
progress whi
0 to km 15.99ut.
ed shouldergood results
tear of the habas, schoed on regula
B8: (km 9.2 t
8 Road Sectio
rvice level o
served whichion of shoulfied by the from the shoulders and
uts were obm 5.000 LHS r
ations betwerved betweeerved betwe
slope was ob
25.000 reveractor in hisoulder mainthe consultatto find out
ich disturbed
90, the signs
s by mixing for the main
unsealed shools and petar basis. Now
o 15)
ons
f unsealed s
h should be ders due to Contractor oulders but embankmen
bserved betwrespectively.
een km 45 toen km 62.00en km 69.00
bserved betw
erse slopes s own audit tenance actition may nethe way to
d the LHS sho
s of water st
the soil witntenance of u
oulders is mtrol pumps w the Contra
26
houlders
removed rain was on time. need to nt in the
ween km .
o km 50. 00 to km 00 to km
ween km
and low that the ivity. The eed to be maintain
oulder.
agnation
th milled unsealed
ore than etc. The actor has
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
staris a
The
S2: (k
3.3 Draina
Mosfromlocaparamaithe
The
At sConregu
On Theculv
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
rted to maintgood sign of
e deficiencies
km 4 to km
Figure 3
ageMainten
st of the culm debris. Nations the haapets wereintain/restorquality of Ha
e scouring at
some culvertntractor has sular basis.
S4& S5 roade catchpits shverts exist on
a Bathinda Netwo
tain the sensf maintenanc
s recorded u
5)
S2: (
3‐2 : Reverse
nance(RUS
lvert drains Need to maazard markee missing/dre the reflecazard marke
the inlet and
t locations tstarted to re
d, at some ohould be pron the other n
ork in Punjab (Ind
sitive locatioce which nee
nder RUS&C
(km 45 to km
e slope, rain
S&CPM‐3)
under this mintain the ser were founamaged. Tting tapes oers.
d the outlet
he erosion aectify the ero
of the culverovided not onetwork road
dia)
ons as mentioeds to contin
CPM2 are pre
S2
m 50)
cuts & low s
month audit slopes alongnd damagedhe immedion the parap
of the culver
adjacent to tosion by putt
rt locations only on the d sections.
oned above onue.
esented in F
2: (km 45 to k
shoulder
sections weg the culverand the refate attentiets, delineat
rts was also o
the parapetsting the sand
the catch piS4&S5 road
on regular b
igure 3.2
km 50)
ere cleaned rt parapets.flective tapeon is requtors and to
observed.
s was also od filled gunny
its are not ps but also o
27
asis. This
and free . At few es on the uired to maintain
observed. y bags on
provided. on all the
TNM
OPRC WorlMonthly Pro
3.3
3.3
3.3
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
Conand
On wasConmai
On betw
On km
In Bactithe maicooadjawith
Thebe ssolurecoConland
3.4 Routin
Theand
All locaobs
No
Themonto m
3.5 Obstru
The of tposs
No
3.6 Incide
Conememajo
3.7 Vegeta
Conbut
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ntractor has d the work is
S2 road, bets observed ntractor menintain the dra
S2 road seween km 76
S5 road sect9.400 which
Built‐up areavities, the CRoW corri
intenance wperatively wacent landowhin Built‐up z
e impact of isevere and tutions for adognizes the ntractor anddowner issue
neMaintena
e bridges andd free from d
the bridgesations whererved.
damage of t
e median manthly audit imaintain.
uctiononth
unauthorizethe road secsible.
obstruction
ntRespons
tractor has ergency toll for incident w
ationContr
ntractor was during the M
a Bathinda Netwo
started to jogoing on in f
tween km 8.along the cntioned in thainage.
ection, the .400 to km 7
tion, the wah was drained
s where othContractor shdor and wi
work that exwith the Emwners to seezones.
nadequate dthe Contractddressing thdifficulties
d the Empes that may b
anceofBrid
d the other sebris.
s and otherre the una
he structure
rkers were it was observ
hePavemen
ed stockpilingctions. Whe
was found o
seandEme
deputed thfree contractwas recorded
ol(RUS&CP
recorded thMC audit no
ork in Punjab (Ind
oin the catcfull swing.
.4000 to km carriageway eir own aud
water stagn76.500 which
ater stagnatid out.
hers may be hall be respoill inform thxtends beyomployer, otheek the best
drainage on tor is requirehese deficieinvolved inloyer shall be an imped
dgesandO
structures in
r structures uthorised a
s was observ
installed on ved some of
ntSurfacea
g of materiaere possible
on the pavem
rgencyWor
he highway t numbers od during the
PM‐7)
he vegetationvegetation w
dia)
hpits to all t
9.400 in budue to the
dit that the v
nation was h was draine
on was also
responsible onsible for ahe Project ond the correr communsolutions fo
the pavemeed to give pncies as a pn implemenwork coopiment to ach
therStruct
n this month
were cleanadvertisemen
ved and reco
the footpathf the marker
andShould
ls along the request the
ment surface
rksRespon
patrolling n each netwmonth.
n on shouldewas found be
the culverts
ilt up area, te higher levvillagers oppo
also observd out.
observed b
for some drall drainage Manager ofridor. The City organisator addressing
ent within tharticular attpriority. Hownting these peratively thieving these
tures(RUS&
h audit sectio
n and clear nts and wr
orded during
hs of the Mars were miss
ers(RUS&C
shoulders we owner to
during audit
nse(RUS&C
vehicles anwork road at s
ers in some eyond the sp
where it is
the water stvel of surroosed the act
ved in built‐
between km
rainage mainmaintenancf the need Contractor wtions (e.g. Lg drainage p
he Built‐up zoention to idwever the Eimproveme
to resolve e improveme
&CPM–4)
ons were ma
except froritten mate
g the monthly
ansa ROB. Dusing which m
CPM‐5)
was observedremove as
t visit.
CPM‐6)
d also dispsuitable inte
of the audit pecified limit
28
required
agnation oundings. tivities to
‐up area
9.300 to
ntenance ce within for any
will work LRC) and problems
ones can entifying Employer nts. The adjacent ents.
aintained
m some rial was
y audit.
uring the may need
d in some soon as
plays the rvals. No
sections ts.
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
Conmai
On obsthe
Thesign“veg
Conbranfrom
Thepres
Figure 3‐3
3.8 RoadS
Mosmucthe the
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ntractor haintain/contro
B8, betweenerved on thesame.
e road‐side tns. Need to getation free
ntractor mennches of them the forest
e vegetationsented in Fig
: Vegetation
SignsMaint
st of the roach required visibility. Ascushion at t
a Bathinda Netwo
s arrangedol the vegeta
n km 15 to ke shoulders
rees obstruccut the vege zone” as pe
ntioned that e trees. Interdepartment
n control og. 3.3
n control on
tenance(RU
ad sides ganto paste the per the insthe gantry po
ork in Punjab (Ind
d the manation on the
km 20 and bduring the a
ct the visibiligetation ander contract a
the forest drvention of Et.
n shoulders
shoulders w
US&CPM‐8)
ntries exist ine reflective ttruction of Wost which is c
dia)
nual and shoulders.
etween km audit and rec
ity of the ro clear up toagreement.
epartment wEmployer is
s with man
with manual
)
n the audit tape on the
World Bank tecomplied wit
mechanical
20 to km 25corded the n
ad users, eso 6m vertica
was not allowrequired to
nual and m
and mechan
sections wepost of the eam during tth.
grass cut
5, the vegetanon‐conform
specially for ally from gro
wing them toseek the pe
mechanical m
nical means
re painted. gantries to their visits to
29
tters to
ation was mance for
the road ound the
o cut the ermission
means is
It is very improve
o provide
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
Thecorr93–
Theroad
Theconholl
On km Figu
B8: (km
B8: (km
Fi
3.9 Raised
As pshoIRC:
On to k17.0
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
e Contractoresponding t–1985 and IR
e sectionsto bds are not co
e traffic signsfirming to ISow section c
B8 road sect9.200 to kmure 3.4.
m 9.2 to km
m 9.2 to km
igure 3‐4 : R
dReflective
per the Conuld be provi: 79.
S1 road, betkm 4.000, k000, km 68.0
a Bathinda Netwo
r should mto location dC 67–2001.
be used for ompatible to
s should be mS: 1239, rectconfirming to
tion, the signm 15. The non
15)
15)
oad Section
ePavement
tract agreemded on all h
tween km 0.km 6.000 to 000 to km 69
ork in Punjab (Ind
maintain thedetails of eac
sign posts ino IRC: 67‐201
mounted onangular holloo IS: 3589.
n boards wen‐conforman
B8 – Poor m
tMarkers(R
ment delineaorizontal cu
.000 to km 1km 7.000,
9.0 and betw
dia)
e sign detch sign in ac
nstalled on t12 and MORT
the supportow sections
re damaged nce is record
B8
B8
maintenance
RUS&CPM9
ators, bollarrves on eith
1.000, on S2 km 9.000 to
ween km 76+
ails along cordance wi
he new impT&H specifica
t posts whicconfirming t
and not fouded for the s
8: (km 9.2 to
8: (km 9.2 to
e of Road sig
9)
rds and the er side of th
road sectioo km 10.000+230 both sid
with the dith the stand
roved / rehaations.
h may be of to IS: 4923 o
nd in order same as pres
km 15)
km 15)
ns
other safetye carriagewa
n between k0, km 16.00des, the defic
30
drawings dards IRC
abilitated
f GI pipes or square
between sented in
y devises ay as per
km 2.240 00 to km ciency to
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
maiMC
On the aud
Simsectrecorest
But mai
3.10 Pavem
During pavemeon the a
On fade
On pavMC
On fade
On cenreco
The
As cen
AlsoConto othe
Themoris veThepart
Durpres
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
intain the RPaudit it was
S4 road, betdeficiency t
dit but during
ilarly on S5 tion betweeorded by thetored.
on B8 roadintained and
mentMarkin
this month ent marking audit section
S1 road seced/ disturbe
S2 road sectement markaudit it was
S5 road sected and missi
B8 road sectreline was forded.
e edge line m
per the Clautreline and e
o as per thntractor musoffer an accetime for con
e roads may rnings, in wiery much reqerefore, the ticularly at th
ring this mosented below
a Bathinda Netwo
PMs was recfound resto
tween km 2.to maintain g the MC aud
road section km 15.000e Contractor
d section be the non‐con
ng(RUS&CP
audit inspewas observens as below:
ction, betwed.
tion betweenking was recofound satisf
tion, betweeng for the sa
ction, betwefound faded
marking on S5
use 15.13 oedge lines on
he Clause 1st ensure thaeptable levelnstruction to
be hazardounter seasonquired to maContractor he missing a
onth audit,w in Figure3.
ork in Punjab (Ind
corded by thored.
.800 to km 3the RPMs w
dit it was fou
on, between0 to km 17.00r in his own
etween km nformance w
PM‐10)
ction the deed. The pave
een km 0.00
n km 75.000 orded by thefactory.
en km 24.00ame the non
een km 15.0and missing
5 road has b
f the Contran all state hig
15.3 (last pat the centrel of safety foo commence
us for the rowhen fog exaintain the sneeds to end faded sec
the record.5.
dia)
e Contractor
3.000 and bewas recordeund restored
n km 16.00000, the deficaudit but d
20.000 to kwas recorded
eficiency to ement marki
00 to km 0.1
to km 80.00e Contractor
00 to km 25.‐conformanc
000 to km 1g and the non
een complet
act Agreemeghways and m
paragraph)of e line and edor the road uor if it is und
oad‐users duxists and duervice level ensure the ctions as IRC
ed deficien
r in his own
etween km 1ed by the Co.
0 to km 17.0ciency to mauring the M
km 25.000, d.
maintainingng was eithe
150 the pav
00, the deficir in his own
340, the pavce was recor
6.000 the pn‐conforman
ted.
ent Contractmajor distric
the Contradge lines meusers at all tderway’.
e to low visiring the monof pavementnew set of‐35.
cies in pav
audit but du
17.650 to kmontractor in
000 and on aintain the RC audit it w
the RPMs w
g the serviceer faded or d
vement mark
ency to mainaudit but du
vement marrded.
avement mance for the s
tor has to mct roads.
act Agreemeet the specitimes ‘irresp
ibility in nighnsoon seasot marking atf pavement
vement mar
31
uring the
m 17.700, his own
B8 road PMs was as found
were not
e level of damaged
king was
ntain the uring the
king was
arking of ame was
mark the
ent, the ifications ective of
hts, early n also. It all time. marking
king are
TNM
OPRC WorlMonthly Pro
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
S1 –
S5 –(Km
Figur
3.11 Traffic
The
On centhe
Thespe
The
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
–(Km 0 to km
m 24 to km25
re 3‐5: Faded
cIslandand
e improveme
B8 road, betral verge wsame.
e roundaboucifications. T
e poor mainte
a Bathinda Netwo
m 1)
5.340)
d/damaged
dRoundabo
ent in the ma
etween km 9was below th
ts in all the The safety en
enance and
ork in Punjab (Ind
Pavement M
outMainten
aintenance o
9.200 to km he service lev
network senhancement
painting of c
dia)
Marking on S
nance(RUS
f roundabou
14.00 the mvel. The non
ections shouon the roun
central verge
S1 –(Km 0
B8 –(Km 15
S1, S5 & B8 R
S&CPM‐11)
uts was obse
maintenancen‐conforman
ld be maintadabouts nee
e is presented
to km 1)
to km 20)
Road Section
rved.
e and paintinnce was reco
ained as pereds to impro
d in Figure 3
32
ns
ng of the orded for
r the IRC ve.
3.6.
TNM
OPRC WorlMonthly Pro
3.3
3.3
M TECHNOMANAG
ld Bank Project fogress Report No 22
B8: (
Figure
3.12 Crash
On (MBTheIRC:
On risedonthe
3.13 Marke
Thepilladeli
Stillmai
Thesectsect
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
(km 9.2 to km
e 3‐6: Poor m
BarrierMa
S2 road, betBCB) should e ends of th:SP:73.
S5 road sect. In the 5thNne by the CoFishtails as p
erPostMain
e deficiency ars, edge maneators was
the boundaintain the se
e concrete pitions of netwtions which a
a Bathinda Netwo
m 15)
B
maintenance
aintenance
tween km 1be continuo
he MBCB sh
tion, betweeNight Inspectontractor. Thper IRC: SP: 7
ntenance(R
to maintainarkers, culves observed al
ary pillars arvice level of
pe bollards (work. These aare sensitive
ork in Punjab (Ind
B8: (km 9.2 to
e and paintin
(RUS&CPM
17.200 to kmous. The dishould be fla
en km 18 to tion Report he ends of th73.
RUS&CPM‐1
n the kilomert markers, long the diffe
re not mainf the bounda
(roadway indare installede from the sa
dia)
o km 15)
ng of median
M‐12)
m 17.400, LHscontinuity sayer and cov
km 19, the hit was pointhe MBCB sh
14)
eter stonesdistance maerent road se
ntained alonary pillars als
dicators) are at the curveafety point o
B8: (km 9.2
n kerbs on B8
S, the metashould be pvered with
height of theted out but ould be flay
, hectometrarkers, hazarections of th
g the netwoso.
e existed alone locations aof view. Thes
to km 15)
8 Road Secti
l beam crasatched immthe Fishtail
e MBCB maystill it has n
yer and cove
re stones, brd markers ahe network.
ork. It is req
ng the differnd on the otse bollards a
33
ion
h barrier mediately. s as per
y need to not been ered with
boundary and road
quired to
rent road ther road also carry
TNM
OPRC WorlMonthly Pro
3.4
M TECHNOMANAG
ld Bank Project fogress Report No 22
the sectmaimaiotheonebe m
It isCondeta
Observati
The obsattentio1. S1 R
Km
Betw
Cleund
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
reflectors intions and dintain these intain the exer sections es and to ensmaintained a
s very mucntractor shouail design for
Figure 3
ionsonAud
ervations whon are summRoad: 0 – km 5
ween km 0 to Nea
neeo Foo
sideo RHS
immo RHS
to do RHS
to to d
o LHSimp
o Saf
aning in theder the dust.
a Bathinda Netwo
nstalled on temark the pipe bollard
xisting pipe balso. The dasure that theas per IRC: 79
h required uld need to ir improveme
3‐7: Km ston
ditSections
hich were noarized below
to km 0.100, ar junction wed to attend otpath kerbses of the carS, the electmediately. S, Water stado the fillingS, the soil exremove fromdrain out theS, small drainprove and clefety enhance
e built up are
ork in Punjab (Ind
the top whiccarriagewayds and painbollards in thamaged pipee post shoul9.
to enhanceidentify the sent.
S1: (km 0
ne 3, improve
s
ot the part ow:
with NH on Limmediatelys need to mrriageway. tric pole du
gnated on thg and maintaxcavated to m the shoulde rain watern along the fean. ement at the
ea required o
dia)
h increase t boundariest them. Nowhe audit secte bollards shd be vertica
e the safetysensitive loc
0 to km 3)
ement in wr
of the non‐co
LHS a manhoy.
maintain and
umped on
he shoulder in the slope make the dider edges anstagnated ofootpath or t
curve needs
on regular b
he visibility s. It is very w the Contrtion but it nehould be repl. The roadw
y on the encations at its
riting is requ
onformance
ole portion d
paint in bla
the shoulde
along the caof the shoulitch to drainnd make then the shouldthe covered
s to improve
asis. The pav
of the sensitmuch nece
ractor has steed to expanplaced with way indicator
ntire road own and su
uired
but need im
depressed wh
ack & white
er need to
arriageway mder. n out the wa permanent der. slab of ‘nala’
e.
vement mar
34
tive road essary to tarted to nd to the the new rs should
network. ubmit the
mmediate
hich may
on both
remove
may need
ter need solution
’ need to
rking was
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
Neethe
At k
At k
At k
Delimai
At ksafe
Som
At k
Culv
The
2. S2 RKm
Km
Betwof t
5/1
Km
5/3,
Km
Km
Km
Km
Km
Km
7/2,
Betwbut
Km
Km
Betwdeli
At tthe mar
Bou
Km
BetwreqThe
Km
At adja
At k
RHSdan
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ed to provideBus Stand.
km 0.600, LH
km 0.780, RH
km 1.400, pip
ineators on tintain.
km 1.900, LHety walls in b
me of the saf
km 3.600, RH
vert, 5/1, no
e reflective ta
Road: 2.240 – km
2.240, RHS,
ween km 2.2he emulsion
culvert not c
4.368, 5/2 S
, catch pit re
4.870, RHS,
5.155, 6/1 w
6.300, LHS, A
6.400, RHS,
6.500, LHS,
6.700, RHS,
, water stagn
ween Km 7.0it was <50m
8.350, LHS,
8.385, newly
ween km 9neators nee
the improveThermopla
rking should
undary pillars
15 – km 20
ween km 1uired at bote MBCB shou
45‐km 50
km 46.900, acent to road
km 47.100 cu
S, Village wngerous to ro
a Bathinda Netwo
e the Zebra
HS, the juncti
HS, culvert no
pe culvert pa
the safety w
HS, gap betwbetween.
fety parapets
HS, the pipe b
catch pit an
ape on the sa
10
pavement m
240 to km 4 used to rep
completed r
Slab culvert, c
equired.
Curve sign d
water stagna
Access road
Minor junct
Minor juncti
Access road
nated, catch
000 to km 7mm
narrow sign
y constructe
9.700 to kmd to maintai
d road sectistic materiabe scarify pr
s need to ma
7.200 to kmh ends. Damuld be flayer
LHS, villaged & RHS, was
ulvert 48/1, p
waste wateroad crust.
ork in Punjab (Ind
crossing and
on sign boar
o. ½, catch p
arapet requir
wall missing a
ween safety
s are damage
bollard need
d poor main
afety parape
marking distu
4.000, the paair the crack
epair and pla
catch pit dam
damaged
ted cleaning
sign should
ion not impr
on not impr
sign damage
pit required
.300, RHS, s
post damage
ed culvert (sla
m 9.800, LHn
ions the paval. During mroperly and t
aintain.
m 17.400, Lmage MBCB aat the ends a
e Dhapai, wste material
parapet need
r stagnated
dia)
d other safet
rd required.
it required.
red.
and the refle
parapets is
ed or tilted n
d to paint bla
ntenance of h
ets missing o
urbed by NH.
avement marks.
aster require
maged plaste
g required
be as per IRC
roved
oved
ed and it sho
d.
hoving and b
ed
ab type) win
HS retaining
vement markmaintenancethen remark
LHS, MBCB at start needas per IRC: S
water stagnadumped by
ds to plaster
in ROW a
ty features a
ctive tape al
more may
need to main
ck & white.
hazard mark
r damaged.
.
rking disturb
ed.
er and repair
C 67
ould be as pe
bleeding on
g or retainin
wall paint
king may nee the old k.
discontinue d to remove P: 73.
ated on shothe locals at
r from backsi
along the c
as per IRC in
lso damaged
need to inst
ntain.
er.
bed due to o
r required.
er IRC:67
the repaired
ng wall dama
ing faded/d
eed to maintdamaged p
at centre, and fix the f
oulder fromt shoulders.
ide.
arriageway
35
n front of
d need to
tall more
over flow
d surface
aged
damaged,
tain with avement
Fish tail fish tails.
m houses
may be
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
At k
At k
Km bac
Km
Culv
Km 6
Betwtraf
Betwand
Slab
Culv
Betw
Culv
Culvpara
Km
Km
Betw
Km
At k
Km
Km
Km
Km mai
Km per
Culvpara
Km
Km
LHS
LHS
Km
Km
70/4
Km
Km
Betw
Km (LHSpara
Betw
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
km 48.150 cu
km 48.400 cu
49.210 culvek.
49.200, (200
vert 50/2, RH
60 – km 65
ween km 60ffic, near ‘dha
ween Km 63d Rain cuts on
b culvert 64/
vert 64/5 pa
ween km 64
vert 65/1, pi
vert 65/3, Bapet.
64.480, LHS
64.800, RHS
ween km 64
65 – km 70
km 65.200, th
65.580, BHS
65.585, RHS
65.500 to km
66.800, Paintained.
67.600, ManIRC‐35.
vert 68/2, capet to para
69.000, pain
69.170, Culv
S Hazard mar
S Minor junct
69.200, Aud
69.800 Bridg
4, no catch p
75 – km 80
stone 75 pa
ween km 75
75.312, culvS=0.8m fromapet painting
ween km 75
a Bathinda Netwo
ulvert 49/1, R
ulvert 49/2, p
ert 50/1, LHS
0m) hectome
HS parapet c
0.700 to kmaba’
3.050 to km 6n embankme
/4, No deline
rapet height
.250 to 64.4
pe partially c
BHS, parapet
junction not
S, Khiala pon
to km 65, R
he sign posts
S, Minor junc
S, Parapet ne
m 65.600, LH
avement m
nsa Kanchian
catch pit oldpet distance
nting require
vert 70/1, No
rker damage
tion need to
dible lines no
ge on canal,
pit.
inting faded
.000 to km 7
vert 76/1, pm edge of Cg faded & pa
.800 to km 7
ork in Punjab (Ind
RHS catch pit
parapet pain
S parapet clo
eter stone da
lose to the c
m 60.800, LH
63.200 culveents
ators on par
t less (36 cm
00, LHS, min
chocked, cat
ts close to
t maintained
d over flowin
HS, the exca
s are old and
ctions need t
eed to mainta
HS, Edge line
marking mai
n round abo
d and damae is 11.88m. p
ed.
o catchpit (Sl
d, edge line
maintain.
ot maintained
hazard mark
.
75.200, RHS,
arapet closeC/W & RHS arapet height
76.000, RHS,
dia)
t damaged, p
nting faded.
ose to carria
amaged.
carriageway.
HS, earthen
erts 64/1 & 6
rapets.
from FRL)
nor junction n
tch pit damag
carriageway
d.
ng. Immedia
vation for w
d not as per I
to maintain
ain & LHS, Pa
under dust.
ntained poo
ut pavemen
aged. Parapparapet pain
lab), Erosion
faded/dama
d after the re
ker damaged
Edge line da
e to carriage= 10 cm), t is 43cm.
water stagn
parapet not
ageway, para
carriageway
64/2 Erosion
not maintain
ged improve
y, only 11.06
te attention
water pipe lin
RC standard
arapet dama
orly, width
t marking at
et height isnting require
cuts adjace
aged.
epair of crac
d on all sides
amaged <20m
eway, parapeback of par
ated in ROW
plastered fro
apet not plas
y, dust inter
adjacent to
ned.
ement requir
6m from pa
required.
e was in pro
d.
aged.
not match
t Junction als
s 30‐33cm od.
nt to parape
ks.
(i.e. 4 in nos
m.
et to paraperapet not p
W.
36
om back.
ster from
rrupt the
parapets
red.
arapet to
ogress.
hed and
so not as
only and
et.
s.)
et = 11m lastered,
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
Culvpavmar
CulvRHS
Km
Betwcarr
3. S5 Km
At kplasculv
At ktree
Culveart
At k
At kside
Som
Wasalso
8/2,
At req
At ktree
At k
10/
Betwregu
Km
Km
16/clea
16/4
At k
17/mai
Betwneethe
Som
At kIRC:
Bou
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
vert 77/2, Aement, Pararker required
vert 77/3, LHS close to car
76.400, Hec
ween km 76riageway, wa5 Road: m 5 – km 10
km 6.050, oster and the vert slab, imm
km 6.300, the.
vert 7/1, 8/th level and
km 6.410, the
km 6.450, thes, to contro
me of the spe
ste material o consult wit
, catch pit re
km 9.220, uired.
km 9.560, the.
km 9.550, mi
2, need to cl
ween km 9.9ular basis or
10, km ston
1 5 – km 20
3, RHS paraarance.
4, parapets n
km 16.250, R
1, needs to rintain it.
ween km 16ed to replacecurves.
me of the spe
km 18.580, M:SP:73 guide
undary pillars
a Bathinda Netwo
udible lines apet close td at all four s
HS, Catch pitrriageway, ha
tometre fad
6.400 to kmaste water co
0
ld slab culve numbering mediate atte
he vegetation
1 needs to maintain it.
e condition o
he 7/2, needl the emban
eed signs are
dumped onh them to st
equired.
RHS, water
he vegetation
inor junction
ear the wate
900 to km 10do some pe
e repair requ
apet needs t
need to shift
RHS, roads cr
raise the wa
6.500 to km 1. Sign post o
eed signs are
MBCB not relines.
s need to ma
ork in Punjab (Ind
at bridge apto carriagewsides.
t damaged, pazard board
ed.
m 76.500, RHontinuously
ert, need toalso to be d
ention requir
n obstructs t
raise the wa
of curve sign
d to maintaikment erosio
e irrelevant a
the shouldetop this type
r stagnation
n obstructs t
n improveme
er way.
0.000, need rmanent sol
uired.
to shift on
t to clear the
rossing sign b
lls of the cat
16.600, chevof the chevro
e irrelevant a
ctified yet. N
aintain.
dia)
pproach not way, Parape
parapet to padamaged.
HS, water stcoming from
o clean and done. Cracksred.
the visibility
alls of the c
poor, need
n the RPMs on.
and need to r
er edges by tof activities
observed
the visibility
ent required.
to remove tution of this
catch pit w
e roadway wi
board in poo
tch pit above
vron are old on also dama
and need to r
Need to incre
maintained et to parape
arapet = 11.
tagnated onm houses.
maintain. Ths on paveme
of the Gent
catch pit abo
to replace.
and also to
replace with
the villagers in future.
at the sho
of the Gent
.
he dust from problem.
wall to increa
idth.
or condition.
e the surroun
and not as paged. Delinea
replace with
ease the heig
after rectificet = 10.8m,
15m, paintin
shoulder a
he parapets ent develope
try, need to
ove the surr
project the
suitable sign
need to rem
ulder, impro
try, need to
m the carriag
ase the carr
nding earth l
per IRC speciators also req
suitable sign
ght and insta
37
cation of , Hazard
ng faded,
long the
need to ed at the
trim the
rounding
e parapet
ns.
move and
ovement
trim the
geway on
riageway
level and
ifications quired at
ns.
all as per
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
Km
At k
21/leve
Som
24/
25/
Betwthe
Bou
4. S4Km
1/1,
At guid
Som
At k
3/1,
3/3,
At kalso
Km
At spe
At spe
8/2,
8/4,
At k
10/
10/
Bou
Km
At k
At k
16/
17/
17/4
18/
18/
18/
18/4
At k
20/
Bou5. B8
Km
Pain
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
20– km 25.3
km 20.000, R
1, 22/2, neeel and mainta
me of the spe
3, catch pit r
3, parapet cr
ween km 24sharp edges
undary pillars
4 Road m 0 – km 5 –
, needs to cle
km 0.000, jdelines.
me of the sign
km 2.000, sch
, catch pit re
, no number
km 3.820, RHo.
stone 4.000
km 5.500, cifications.
km 6.100, Rcifications.
, painting of
, hazard mar
km 8.600, he
1, LHS catch
3, painting re
undary pillars
15 – km 20
km 15.200, R
km 15.560, R
1, RHS catch
1, catch pit r
4, numberin
1, catch pit r
2 painting ne
3, canal brid
4, 18/5, 18/6
km 18.400, sc
3, the height
undary pillars8 Road m 9.200 – km
nting of rema
a Bathinda Netwo
340
RHS, curve sig
eds to raise ain it.
eed signs are
required.
racked.
4 and km 25,s.
s need to ma
– km 10
ear the wate
junction wit
n post rusted
hool sign nee
equired.
ring on LHS p
HS, village s
, painting re
LHS, the vil
RHS, chevro
parapets is r
rker damage
ectometre pa
pit needs to
equired.
s need to ma
RHS, sign of w
RHS minor ju
h pit damage
required, nee
g required.
required.
eeds to main
ge, height of
6, 19/1, 19/2
chool sign bo
t of both side
s need to ma
m 15.000
aining centra
ork in Punjab (Ind
gn in poor co
the walls of
e irrelevant a
, the MBCB,
aintain.
er way.
th S3 road,
d and paintin
ed to replace
parapet.
ign post not
quired.
llage sign p
on sign post
required.
d.
ainting needs
o improve an
aintain.
water stagna
nction needs
d.
eds to clear t
ntain.
f parapets le
2, 19/3, 19/4
oard needs t
e parapets v
aintain
al verge requ
dia)
ondition.
f the catch p
and need to r
needs to im
pavement
ng damaged
e.
t vertical and
post (Musa)
t height is
s to maintain
nd RHS catch
tion observe
s to maintain
the water wa
ess than the r
4, 19/5, 20/1
to replace.
aries.
uired.
pit above th
replace with
mprove and p
marking sh
need to rest
d needs to r
needs to m
less need t
n.
pit required
ed.
n.
ay.
required nee
&20/4 catch
he surroundi
suitable sign
place the fish
ould be as
tore.
replace the s
maintain as
o check as
d.
eds to check
h pits require
38
ng earth
ns.
h tails on
per IRC
sign post
per IRC
per IRC
.
ed.
TNM
OPRC WorlMonthly Pro
3.5
M TECHNOMANAG
ld Bank Project fogress Report No 22
Pav
Rem
11/
11/
Km
Km sho
12/
12/
At kand
Bou
Km
At k
16/
Betw
Junc
17/bac
At k
At k
Deli
19/
Km
At kmai
At k
22/
22/
Km
Km
Km IRC
Recomme
Momaipainnee
Moeffeirre
Mopavan a
At sreqheigIRC
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ement mark
move the Un
1, catch pit d
3, parapet m
11, stone ha
11.050, LHSulder. Need
/1, need to im
2, repair of c
km 12.300, sd maintain th
undary pillars
15 – km 20 –
km 15.300, R
2, hazard ma
ween km 15
ction signs s
1, needs to ck side of the
km 16.600, L
km 16.813, R
ineator and t
3 catch pit re
stone 19, ne
km 20.180, intain the slo
km 20.350, R
1, catch pit r
2, catch pit r
stone 23, 24
24.450, curv
stone 25 shstandard. Th
endationfo
nitoring Conintain the pnting and cueds to mainta
nitoring Conectively and spective of t
nitoring Conement markacceptable le
some of theuired or lesght of the sig: 67 guidelin
a Bathinda Netwo
king covered
authorised s
damaged.
maintenance
as different d
S, waste wato consult w
mprove the
catch pit req
sign of watehe slopes.
s need to ma
– km 25
RHS, hazard m
arker damag
.600 to km 1
hould be as
clear the wae parapets.
HS, curve sig
RHS, curve sig
the pipe boll
equired.
eeds to main
LHS, on shoope of the sh
RHS, curve sig
required. Par
required, num
4 needs to m
ve sign faded
hould be as phe sub‐stand
orNetwork
nsultant haspavement mulvert parapeain.
nsultant recmaintain t
the monthly
nsultant alsokings meet tevel of safety
road sectios than thatgn posts as pnes.
ork in Punjab (Ind
under dust,
sign boards.
required.
dimension so
ter drained with the Guru
parapets and
uired. Numb
er stagnation
aintain
marker dama
ged.
15.800, chev
per IRC stand
ter way. Cat
gn suppleme
gn suppleme
lards need to
ntain as per I
oulder the sihoulders.
gn post dam
rapets need
mbering nee
maintain and
d and post da
per IRC. Km dard km and
Performan
s observed tmarking, roaets painting
commends tthe service audit section
recommendhe IRC speciy and service
ons either th. Contractorper IRC guide
dia)
cleaning req
on both sides
out from thudwara mana
d also the he
bering not as
n on shoulde
aged. Curve s
rons require
dards.
tch pit requir
entary plate d
entary plate
o extend upt
RC standard
ign of water
aged
to plaster fro
eds to mainta
improve. Nu
amaged.
stones and 5th km ston
nceWorks
that there iad signs, ais required.
that the CMlevel of thens.
ds that the Cifications ane for the road
he height of r needs to celines and al
quired on reg
s, rectificatio
he Gurudwaagement to
eight of the c
s per IRC spe
ers observed
sign post als
ed at curve.
red and also
damaged.
damaged.
to the bridge
s.
r stagnation
om back.
ain as per IRC
umbering not
5th km stones should be
is a scope fnd bridge m. This is a co
MU team nee entire net
Contractor md contractuad users at all
the sign pocheck and mso maintain
gular basis.
on required.
ra stagnatedstop this act
catch pit wal
cifications.
d. Needs to
o damaged.
needs to pla
e.
observed. N
C standards.
t as per IRC.
nes should be replaced.
for improvemaintenanceontinue pro
eeds to wotwork at ea
must ensure al obligationl times.
sts is more maintain thethe sign pos
39
d on the tivity.
ls.
improve
aster the
Needs to
be as per
ement to e, island cess and
ork more ach time
that the n to offer
than the e desired sts as per
TNM
OPRC WorlMonthly Pro
M TECHNOMANAG
ld Bank Project fogress Report No 22
Theentinew
Theavaeros
In tandon texisenterem
Spemaispesafe
Convegthe
Thepho
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
e catchpits sire road netw catch pits b
e embankmeilable with Psion cuts.
he view of td put close wthe road anst along the ers on the
moved to faci
ed zoning ointain the roed limit signety measures
ntractor has etation on scontinuity.
e detailed aotographs is p
a Bathinda Netwo
should be ptwork. Contrbut at the sa
ent slopes shPWD. Need
the monsoonwatch on thed erosion ofnetwork nenetwork roilitate the dr
of the entirad signs acc boards. In ts and prepar
arranged thhoulders. Th
audit reporpresented in
ork in Punjab (Ind
rovided at eractor has stme time nee
hould be mato ensure t
n season thee sensitive lof high embaeed to proteads. The exainage.
re road netordingly. Cohe built‐up are the propo
he manual ahis is a good
rt with scon Chapter 4.
dia)
each culverttated to exeeds to impro
aintained in that the emb
e CMU teamocations wheankments maect so that thxtra soil on
work is verntractor hasareas it is versal according
and mechansign of impr
ores, un‐rep
t location onecute the wve the old on
a good manbankments s
m needs to were the wateay take plache water mathe should
ry much req started the ry much reqgly.
ical grass curovement an
ported non‐
n both sidesork to constnes also.
nner within should be fr
work more efer may be stce. The wateay not overfer edges sh
quired and activity to inuired to enh
utters to connd needs to
‐conformanc
40
s on the truct the
the land ree from
ffectively tagnated er bodies flow and hould be
need to nstall the ance the
ntrol the maintain
ces with
TNM
OPRC WorlMonthly Pro
4 CO
4.1
T
T
T
A
A
M TECHNOMANAG
ld Bank Project fogress Report No 22
ONSOLIDA
Contracto
Table 4‐1 :
Month
Mar‐13
Jul‐13
Aug‐13
Sep‐13
Oct‐13
Nov‐13
Dec‐13
Total – 2013
Jan‐14
Feb‐14
Mar‐14
Apr‐14
May‐14
Jun‐14
Jul‐14
Aug‐14
Sep‐14
Oct‐14
Nov‐14
Dec‐14
Total – 2014
Jan‐15
Feb‐15
Mar‐15
Apr‐15
May‐15
Jun‐15
Jul‐15
Aug‐15
Sep‐15
Oct‐15
Nov‐15
Dec‐15
Total – 2015
Jan – 2016
Feb – 2016
Mar – 2016
April – 2016
May – 2016
Jun‐16
Jul‐16
Accumulated
Total
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
ATEDAU
or'sAuditR
: Accumulate
S1 S2
2 12
2 12
2 11
1 14
2 16
1 12
2 13
12 90
0 9
1 9
1 17
1 11
1 10
1 7
0 5
0 3
1 9
1 13
7 20
14 42
28 15
2 13
2 7
40 31
4 44
24 16
0 36
0 35
0 13
2 87
2 65
0 32
0 26
76 52
0 8
2 43
2 2
0 43
1 16
14 29
4 43
135 90
a Bathinda Netwo
UDITREP
ReportonJu
ed Scores Su
2 S3
2 0
2 0
1 1
4 0
6 0
2 0
3 0
0 1
3
0
7 0
1 0
0 0
0
0
0
0
3 1
0 0
2 3
5 7
3 1
1
1 0
4 0
6 53
6 0
5 55
1 0
7 0
5 11
2 0
6 4
3 125
0
3 39
0
3 0
6 0
9 8
3 0
9 180
ork in Punjab (Ind
PORT
uly2016
ubmitted by
S4 S5
10 6
6 1
2 3
10 2
4 0
5 1
4 2
41 15
3 3
2 2
2 2
1 3
3 2
0 0
0 0
0 0
6 4
1 3
13 1
11 24
42 44
0 3
4 4
20 40
22 20
11 10
2 28
3 0
6 0
6 18
15 2
23 4
2 8
114 137
8 0
2 10
53 0
0 20
0 46
19 0
4 4
279 272
dia)
Contractor f
5 B8
4
4
5
6
5
5
5
5 34
6
6
4
4
5
1
0
3
3
2
17
4 35
4 86
4
4
0 39
0 69
0 31
8 44
17
0
8 21
19
5
5
7 258
26
0 20
44
0 14
6 2
36
10
2 520
for Non‐Con
MPM RDP
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
16 0
16 0
24 0
0 0
0 0
6 0
22 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
52 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
68 0
nformances
MNon –
Conforma
34
25
24
33
27
24
26
193
24
20
26
20
21
9
5
6
23
21
58
145
378
47
22
170
165
167
110
110
137
134
114
64
45
1285
42
116
101
77
65
106
65
2428
41
nce
TNM
OPRC WorlMonthly Pro
Ta
Sr.
1 Tota
2 Tota
3 Tota
Month:J
Month : JULY
MPM
MPM 1
MPM 2
MPM 3
MPM 4
MPM 5
MPM 6
Repeat MP
SL.
No.Con
re
Total Road
Month : JU
M TECHNOMANAG
ld Bank Project fogress Report No 22
Table
Table 4‐3: M
able 4‐4: Roa
alManagemen
alRoadDurab
alRoadUserS
JULY2016
Y 2016
Item Descrip
Quality Assurance
Contractor`s Prog
Contractor`s Repo
Traffic Manageme
Inventory DatabasManagement
Detailed Design &Constrcution Meth
PM Non-ConformancePrevious Month
Non‐
formance
lating to
Sectio
d Durability Non‐
ULY 2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
4‐2 : Summ
Management
ad Durability
ntPerformanc
bilityNon‐Con
Safety&Comf
ptionPerforma
MeasuComplia
e System
grams
orts
ent
e
& hodology
e from
on Code
Numb
No
Conform
Reco
Contr
0
Conformance Sc
a Bathinda Netwo
ary of Netw
t Performan
y Performan
ItemDescrip
ceNon‐Confor
nformanceSco
fortNon‐Confo
Summaryof
ance ure ance
Number Non-Conform
Acontract
ber of
on‐
mances
orded
ractor
No
Conform
Weigh
B
0 5
ore
ork in Punjab (Ind
ork Perform
nce Measure
ce Measures
ption
rmanceScore
ore(RDPM'S)
ormanceScor
NetworkPerf
TotalScore
ofmances
or
Non-Conformanc
WeightingB
2
1
2
4
2
4
4
Total Ma
n‐
mance
hting
B
Sub‐W
Months/
Record
Confo
5
dia)
mance submit
s (MPM`S) S
s (RDPM`S) –
(MPM'S)
e(RUS&CPM
formanceSyst
eofNon‐Conf
ce g
Sub-WeiDays/Weeks/
Recorded Non C
Each Week of De
Each day of Delay
Each day of non rdeadline
Each day of non rdeadline
Each Week of De
Each Week of De
Number of Monthsconfoermance firs
anagement PerformaScore
eighting
/Weeks of
ded Non
rmance
C
Tota
Confo
Sc
Ax
Cont
4
tted by Cont
Submitted by
– Submitted
Co
M'S)
tem
formance
ghting /Months ofConformance
N° Co
WeSu
elay
y
reciept after
reciept after
elay
elay
s since non-st identified.
ance Non-Conformae
al Non‐
ormance
core
xBxC
tractor
0
0
tractor
y Contractor
d by Contract
Scoresontractor
0
0
65
65
Non-on X
eigh x ubWC
Total Non-ConformancScore AxBx
Contractor
0
0
0
0
0
0
0
0ance
Comments
42
r
tor
Remarks
-ce xCr
Comments R
Pho
Refer
N
Photo Reference
No.
oto
rence
o.
TNM
OPRC WorlMonthly Pro
Table
M TECHNOMANAG
ld Bank Project fogress Report No 22
e 4‐5 : Road
S111
S112
S211
S212
S213
S214
S215
S216
S217
S218
S219
S220
S221
S222
S223
S224
S225
S226
S227
S228
S229
S230
S311
S411
S412
S413
S414
S415
S511
S512
S513
S514
S515
B811
B812
B813
B814
B815
Name of R
Name of R
Total Leng
Name of R
Total L
1
Name of R
Chowk) (S
Total Leng
Section
Total Leng
Total Co
Total Leng
Name of R
Total Leng
Name of R
(B8)
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
User Service
F
0
5
2
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
10
18
0
5
10
15
20
0
5
10
15
20
9
15
20
25
30
Road :‐ Man
Road :‐ Sang
gth of S1 Roa
kms
Road :‐ Bhaw
Length of S2
106.130 kms
Road :‐ Barn
3)
gth of S3 Ro
kms
n
gth of B8 Ro
kms
ontract Roa
gth of S4 Roa
kms
Road :‐ Dhan
gth of S5 Roa
kms
Road :‐ Bath
a Bathinda Netwo
e and Comfo
From
0.000
5.000
2.240
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
0.000
5.000
00.000
82.640
0.000
5.000
0.000
5.000
0.000
0.000
5.000
0.000
5.000
0.000
9.200
5.000
0.000
5.000
0.000
sa‐Talwand
Chaina
grur‐Sunam
ad: 11.300
wanigarh‐Su
2 Road:
s
ala‐Mansa (
oad: 7.290
ad: 28.650
ad Length: 2
CONFORM
ad: 24.970
nula‐Bhikhi
ad: 25.340
inda‐Kotsha
ork in Punjab (Ind
ort Performa
To
5.000
11.300
10.000
15.000
20.000
25.000
30.000
35.000
40.000
45.000
50.000
55.000
60.000
65.000
70.000
75.000
80.000
85.000
90.000
95.000
100.000
108.770
189.930
5.000
10.000
15.000
20.000
24.970
5.000
10.000
15.000
20.000
25.340
15.000
20.000
25.000
30.000
37.850
di Sabo upto
age
(S1)
Total Non‐C
unam‐Bhikh
Total Non‐C
(Mansa Kain
Total Non‐C
Total Non‐C
03.680 kms
ANCES
Total Non‐C
(S5)
Total Non‐C
amir‐Talwa
dia)
ance Measur
5.0
6.3
7.7
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
8.7
7.2
5.0
5.0
5.0
5.0
4.9
5.0
5.0
5.0
5.0
5.3
5.8
5.0
5.0
5.0
7.8
o Ramtirath
Conformanc
hi‐Kotsham
Conformanc
nchian to Ra
Conformanc
Audit L
in (K
Conformanc
‐ TOTAL NO
Conformanc
Conformanc
ndi Sabo up
es – Submitt
000
00
760
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
000
770
90
000
000
000
000
70
000
000
000
000
40
800
000
000
000
850
Jaga (S4)
ces S1
ir (S2)
ces S2
am Ditte W
ces S3
Length
Kms)
Aud
J
Ass
ces B8
ON‐
ces S4
ces S5
pto Ramtirat
ted by Contr
4
0
4
10
0
4
0
0
0
0
0
1
0
0
1
3
0
24
0
0
0
0
0
43
0
0
2
0
0
2
0
4
0
2
0
2
0
4
2
5
3
0
0
10
65
ala
dit Score of
July ‐16
sesment‐1
th Jaga
43
ractor
TNM
OPRC WorlMonthly Pro
4.2
4.2
Table 4‐contractadjusted
4.2
Sr.
1 TotalM
2 TotalR
3 TotalR
Month:JULY
M TECHNOMANAG
ld Bank Project fogress Report No 22
Summary
2.1 Analys
a) b) c)
AccMo
‐6 gives the t and compad by the MC
2.2 Manag
Acc(MPoutEmp
The
ManagementPerf
RoadDurabilityN
RoadUserSafety
Y2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
y&Compar
sisandCom
This sectionsubmitted Consultant
Network PeManagemenRoad DurabRoad User S
ording to nitoring Con
summary oarison of thefor the mont
Ta
gementPer
ording to thPM‘s) reflectputs, includiployer.
e non‐confor
ItemDe
formanceNon‐C
Non‐Conformanc
&ComfortNon‐
a Bathinda Netwo
risonofCon
mmentsofth
n provides aby the Co(MC) after in
erformance Innt Performanility PerformService and C
the Contracsultant (MC)
of the audit e NON‐CONFth of July 20
able 4‐6 : Sum
rformanceM
he Contract t the ability ing the qual
mance recor
escription
ConformanceSco
ceScore(RDPM
‐ConformanceSc
SummaryofNe
TotalSc
ork in Punjab (Ind
ntractor’sA
hePerform
a descriptionontractor annspecting the
nspection innce Measuremance MeasuComfort Perf
ct Specifica) perform th
for each typFORMANCES 016.
mmary Non‐
Measures(M
Agreementof the Contity and effic
rded under t
ore(MPM'S)
M'S)
core(RUS&CPM
etworkPerforma
coreofNon‐Con
dia)
Auditvs.Mo
manceAudit
n and analysnd reviewede audit sectio
cludes eaches (MPM’s) ures (RDPM’sormance Me
tions (Appee Audit Inspe
pe of Perforsubmitted b
‐Conformanc
MPM’s)
t, the Manatractor to suciency of his
his section is
SCon
M'S)
anceSystem
nformance
onitoringCo
tInspection
sis of the md/adjusted ons.
one of the b
s). easures (RUS
endix 8), tections as pe
rmance Meaby the Contr
ces
gement Peruccessfully mreporting o
s presented
Scoresntractor
Sc
0
0
65
65
onsultant’s
n
onthly auditby the Mo
below items:
S&CPM’s)
the Contracer the forma
asures set ouractor with t
rformance Mmanage the of informatio
below in Tab
coresMC
Rem
0
0
80
80
44
sAudit
t reports onitoring
:
ctor and t RM03.
ut in the the score
Measures contract
on to the
ble 4.7.
marks
M
TNM
OPRC WorlMonthly Pro
Month : JULY 2016
MPM Item
MPM 1 Quality As
MPM 2 Contracto
MPM 3 Contracto
MPM 4 Traffic Ma
MPM 5Inventory Managem
MPM 6Detailed DConstrcu
Repeat MPM Non-ConPrevious M
4.2
SL.
No.
No
Conform
relatin
1 RDPM
Total Road Du
Month : JULY
M TECHNOMANAG
ld Bank Project fogress Report No 22
m DescriptionPer
MCo
ssurance System
or`s Programs
or`s Reports
anagement
Database ment
Design & tion Methodology
nformance from onth
2.3 RoadD
As pthe futuCon
RDPEmpNonreco
Nowroug
Thekm the
n‐
mance
ng to
Section Code
M 4 S411
urability Non‐Conform
2016
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
rformance Measure ompliance
NumbNon-Confo
Acontra
Table 4‐7 :
DurabilityP
per the ContContractor’
ure generatintract.
PM’s are theployer’s assen‐conformanorded until a
w the Contrghness (IRI)
e rain cuts an0.000 to kmTable 4.8 be
Table 4‐8
Number of
Non‐
Conformances
Recorded
Contractor
Nu
Conf
Re
0
mance Score
a Bathinda Netwo
ber oformancesAactor
NumberNon-
ConformaA
MC
Manageme
Performanc
tract Agreems ability to sions and pr
e contractuaessment. Failnce for thata program of
ractor has odata. The IR
nd erosion obm 5.000 for welow.
8 : Road Dur
mber of
Non‐
formances
ecorded
MC
Non‐
Conforma
Weightin
B
1 5
ork in Punjab (Ind
r of-ances
Non-Conformance
WeightingB
2
1
2
4
2
4
4
Total Manag
nt Performa
ceMeasure
ment these asuccessful prrotect it fro
al requiremelure to delivet measure. Tf rectification
owned his owI data presen
bserved on twhich the no
rability Perfo
nce
ng
Sub‐Weighting
Months/Weeks
Recorded Non
Conformance
C
4
dia)
Sub-WeightingDays/Weeks/Month
Recorded Non Confo
Each Week of Delay
Each day of Delay
Each day of non recieptdeadline
Each day of non recieptdeadline
Each Week of Delay
Each Week of Delay
Number of Months sinceconfoermance first iden
gement Performance NScore
ance Measur
es(RDPM’S)
are a set of rotect the pom consump
ents, which mer the specifThis non‐con work has b
wn Profilomnted in Chap
he embankmon‐conforma
ormance Me
g
of
n
Total Non‐
Conformance
Score
AxBxC
Contractor
To
Con
A
0
0
g hs of
ormance
N° Non-Con X
Weigh x SubW
C
CS
t after
t after
e non-ntified.
Non-Conformance
res (MPM’s)
)
performanceavement anption over t
must be meied RDPM crnformance een agreed w
meter and stpter 3.
ment on S4 rance conside
easures (RDP
otal Non‐
nformance
Score
AxBxC
MC
20Between
(Cuts on E
20
Total Non-Conformance Score AxBxC
Contractor
Total NConformScore A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
e criteria thad surfacing the duration
et at the timriteria will rewill continuwith the Em
tarted to co
oad section ered as pres
PM’s)
Comments
n Km 0 to Km 1 R.H.S
Embankment Slopes)
45
Non-mance AxBxCC
Comments R
at reflect asset for n of the
me of the sults in a ue to be ployer.
ollect the
between sented in
Photo
Reference
No.
1 & 2
Photo Reference
No.
TNM
OPRC WorlMonthly Pro
4.2.
4.2.
4.2.
4.2.
4.2
M TECHNOMANAG
ld Bank Project fogress Report No 22
.3.1 Minim
As eContyear
TherAsse
The Nove
The 3.6 k
.3.2 Pavem
The provcontanalemppavewhicClauright
In acontcrite
As pusingmusE‐95time
Nowof thanal
The
.3.3 Pavem
AccodiffeClau
.3.4 Roadw Any
Emb
2.4 RoadU
• AccoPerf
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
mumAnnua
explained intractor's wors and is bind
refore so faet Preservatio
4th year worember 2015
4th year workms for reha
mentRough
roughness ivisions of Chtractor has tyse the dataployer, who ements and ch is the IRI se 8.2.2.2. At to carry out
accordance wtractor shall eria througho
per the contrg the methot be a Class 150. The Contes.
w the Contrache network ysed as per c
IRI data colle
mentDeflec
ording to therent road sese 8.2.3. The wayCutAn
non‐conformbankment Slo
UserServic
ording to tformance M
a Bathinda Netwo
alAssetPre
Sub‐chapteork annual pding on the C
r there are on Quantitie
rk program (.
rk programmbilitation.
hness(RDP
is a measurehapters 8 ato conduct ta as per the smust measuevery 6 mon(InternationAlso it is vert roughness
with the Clensure that
out the durat
ract agreemeod of Intern1 precision Ptractor shall
ctor has ownroads. The clause 8.2.2.
ected by the
ction(RDPM
e subsectioections was e detail is pre
dEmbankm
mance undeope.
eandComf
the Contraceasures (RU
ork in Punjab (Ind
eservationQ
er 3.1, this program thatContractor.
no NON‐COes.
(i.e. revised 3
me has been a
PM‐2)
e of comfortand 16 of Pthe roughnespecificationure the rounths thereafal Roughnesry importantmeasureme
ause 8.2.2 t the roughtion of the c
ent Clause 2ational RougProfile accordl own and m
ned his ownIRI will be c
e Contractor
M‐3)
n3.2.2 of threcorded anescribed in s
mentSlope
er the RDPM
fortPerform
ct AgreemeUS&CPM) ref
dia)
Quantities
measure pet was appro
ONFORMANC
3rd year) was
approved fo
t of road usPart 2A of ess survey ans mentionedghness withfter. The valss Index) shat to understants any time
of the specness of the ontract.
2.6.2.4, the Rghness Indeding to the smaintain the
Profilometecalculated fo
is presented
his report, tnd found witub section 3
s(RDPM‐4)
M‐4 was not
manceMea
nt, the Roflect the roa
–WorkPro
ertains to thoved by the
CES regardin
s submitted
r52.42 kms f
sers and in athe contracand measured in the conthin the first ues correspoall meet the and that thee during the e
cifications opaved surfa
Roughness sx (IRI). The pecificationse Roughness
er and starteor the entir
d the Chapter
he pavementhin the perm3.2.2.
)
recorded fo
asures‐RUS
ad User Sead user‘s ex
ogram
he fulfilmenemployer f
ng Minimum
by the Cont
for improvem
accordance ct specificatie the roughntract agreem06 months onding to parequiremene employer’sentire contra
of the contrace conform
hall be meaequipment s as defined s Profilomet
ed to collect e road netw
r 3.
nt deflectionmissible limi
or Roadway C
S&CPM
ervice and xpectation ab
46
nt in the for three
m Annual
tractor in
ment and
with the ons, the ness and ment. The on new
arameter nts of the s has the act.
ract, the ms to the
sured by required by ASTM ter at all
the data work and
n on the ts as per
Cuts and
Comfort bout the
TNM
OPRC WorlMonthly Pro
Month :
Refere
Bidd
Docum
Sectio
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
RUS&C
Any RUS
Any RUS
Any Roa
Haza
M TECHNOMANAG
ld Bank Project fogress Report No 22
day com
• The ServexpeCon
• Anycorr
• TheNONConThe
• The audMea
JULY 2016
nce to
ding
ment
on VI
CPM1 Pavem
CPM2 Unsea
CPM3 Draina
CPM4Routin
other S
CPM5Obstru
and Sh
CPM6Incide
Respo
CPM7 Vegeta
CPM8 Roadsi
CPM9 Raised
CPM10Pavem
Symbo
CPM11Traffic
Mainte
CPM12 Crash
CPM13Sight R
Barrier
CPM14Marke
Edge, C
S&CPMRepea
Consec
S&CPMAny un
identif
d Safety
ards
Any Im
Users I
OLOGY AND GEMENT LTD.
or Sangrur Mansa (July 2016)
to day servmply with the
objectives vice is mainectations actractor’s perway the firesponds to trefore, the fN‐CONFORMsultant are non‐conformcomparisonit scores byasures ‐ RUS&
Table 4‐9 : S
Item Desc
ment Maintenan
led Shoulder M
age Maintenanc
ne Maintenance
Structures
uctions on the P
houlders
nt and Emergen
nse
ation Control
ide Signs Maint
d Reflective Pave
ment Markings ‐
ols etc)
Island and Rou
enance
Barrier Mainten
Rails, Hand Rail
r Maintenance
er Posts (Guard S
Culvert, Distanc
ted Non‐Confor
cutive Months
n‐reported Non
fied by the Mon
mmediate Safety
Instructed for Re
Tota
RU
a Bathinda Netwo
viceability oe Contract Stof the Contntained, whicross the rarformance.nal score othat of the Mfinal monthl
MANCES rela80 against tmance recorn of the audity MC regard&CPM, is sho
Summary of
cription
nce
aintenence
ce
e of Bridge and
Pavement Surfac
ncy Works
enance
ement Markers
(Lines, Text,
undabout
nance
and Pedestrian
Stones, Boundry
ce Markers, Haz
rmance in
‐Conformance
nitoring Consult
y Hazard to Roa
epair
al Score
US FIELD
ork in Punjab (Ind
of the roadsandards spetract Standaich reflects nge of Cont
of the NONMonitoring Cly audit scorating to RUthe monthlyrded againstt scores submding to Roaown in the T
Non–Confor
Minimum
for Each
Non ‐ Co
5km (1km
5km (1km
1
5km (1km
ce 1
N
5
5
5km
5km
5
5
5
y,
ard)5
tant
d
dia)
s under the cified for eacards are to the road utract assets,
N‐CONFORMonsultant's Ares for the mUS&CPM asy scores 65 at MPM is 20.mitted by thad User SerTable4.9.
rmances of R
Audit Length
h Recorded
onformance
C
for cracking)
for cracking)
1km
for cracking)
1km
N/A
5km
5km
m/1km
m/1km
5km
5km
5km
5km
Contract. Tch RUS&CPMensure thatuser‘s day t and to per
MANCES incAudit Inspectmonth of Jus adjusted as submitted. e Contractorrvice and Co
RUS&CPM M
Total Non‐
Conformance
Score
AxBxC
Contractor
C
6
4
0
0
0
0
3
0
28
10
0
0
0
2
53
12
0
0
65
The ContractM. t a defined to day servrmit auditin
luded in thtion. ly 2016 incluby the Mod by the Con
r versus the omfort Perf
Measures
Total Non‐
Conformance
Score
AxBxC
MC
C
6
5
0
0
0
0
2
2
2
6
1
0
0
2
26
24
30
0
80
47
tor must
Level of iceability g of the
his MPR
udes the onitoring ntractor.
adjusted formance
Comments
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
4.3 Verific
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavemen
RUS&CPM2 Unsealed
RUS&CPM3 Drainage
RUS&CPM4 Routine
RUS&CPM5 Obstruct
RUS&CPM6 Incident
RUS&CPM7 Vegetati
RUS&CPM8 Roadside
RUS&CPM9 Raised R
RUS&CPM10 Pavemen
RUS&CPM11 Traffic Is
RUS&CPM12 Crash Ba
RUS&CPM13 Sight Ra
RUS&CPM14Marker P
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐r
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
cationofContra
Item Description
nt Maintenance
d Shoulder Maintenence
e Maintenance
Maintenance of Bridge and o
tions on the Pavement Surfac
and Emergency Works Resp
ion Control
e Signs Maintenance
Reflective Pavement Markers
nt Markings ‐ (Lines, Text, Sy
sland and Roundabout Maint
arrier Maintenance
ils, Hand Rail and Pedestrian
Posts (Guard Stones, Boundr
e Markers, Hazard,Road Delin
d Non‐Conformance in Conse
reported Non‐Conformance i
ing Consultant
mediate Safety Hazard to Roa
air
Bathinda Network in P
actor’sAuditR
Table 5.0 km
n
Minim
for
Non
5km (
o
e
5km
other Structures
ce and Shoulders
onse
ymbols etc)
tenance
Barrier Maintenance
ry, Edge, Culvert,
neators)
ecutive Months
dentified by the
ad Users Instructed
T
Punjab (India)
Report
4‐10 : Verificatiom Audit Length Start Location
mum Audit Length
Each Recorded
n ‐ Conformance
Number
Conform
Reco
Minimu
Leng
Contr
1km for ravelling
or cracking or
edgebreake)
0
(1km for Shape) 0
1km 0
5km 0
1km 0
N/A 0
5km 0
5km 0
5km/1km 1
5km/1km 0
5km 0
5km 0
5km 0
5km 1
0
0
0
Total Score
on of Audit – Secn S1 km 0 to km 5
r of Non‐
mances
orded
m Audit
gth A
ractor
Number of Non
Conformances
Recorded
Minimum Audi
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 1
0 0
0 0
0 0
1 1
0 0
0 1
0 0
48
ction S1 – Km 0.05
n‐
s
t
Non‐
Conformances
Weighting
B
Sub‐W
N
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
8
00 to Km 5.000
Weighting
No of
nsecutive
ks/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 2
0 0
1 0
0 0
4
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0During M
2Pavem
be
0
0
0
2 Km 3,
0
6
0
10
Comments
MC Audit the missing RPMs w
restored between km 0 to
ment Edge marking faded/dis
etween km 0+000 to 0+150 R
, improvement in writing is r
RUS&CPM ‐ 10
Photo
Reference No.
were found
1
sturbed
R.H.S3,4 & 5
equired 6
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unsealed
RUS&CPM3 Drainage
RUS&CPM4 Routine
RUS&CPM5 Obstruct
RUS&CPM6 Incident
RUS&CPM7 Vegetati
RUS&CPM8 Roadside
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic Is
RUS&CPM12 Crash Ba
RUS&CPM13 Sight Ra
RUS&CPM14Marker P
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐r
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Description
nt Maintenance
d Shoulder Maintenence
e Maintenance
Maintenance of Bridge and o
tions on the Pavement Surfa
and Emergency Works Resp
ion Control
e Signs Maintenance
Reflective Pavement Markers
nt Markings ‐ (Lines, Text, Sy
sland and Roundabout Maint
arrier Maintenance
ils, Hand Rail and Pedestrian
Posts (Guard Stones, Boundr
e Markers, Hazard,Road Delin
ed Non‐Conformance in Cons
reported Non‐Conformance i
ring Consultant
mediate Safety Hazard to Roa
air
Bathinda Network in P
Table 4
7.76 k
n
Minim
for
Non
5km (
o
e
5km
other Structures
ce and Shoulders
ponse
s
ymbols etc)
tenance
n Barrier Maintenance
ry, Edge, Culvert,
neators)
ecutive Months
identified by the
ad Users Instructed
T
Punjab (India)
4‐11 : Verificatio
km Audit Length Start Locatio
mum Audit Length
Each Recorded
n ‐ Conformance
Number
Confor
Reco
Minimu
Leng
Contr
(1km for ravelling
or cracking or
edgebreake)
1
(1km for Shape) 0
1km 0
5km 0
1km 0
N/A 0
5km 0
5km 0
5km/1km 4
5km/1km 0
5km 0
5km 0
5km 0
5km 0
0
0
0
Total Score
on of Audit – Sec
on S2 km 2.240 to
r of Non‐
mances
orded
um Audit
gth A
ractor
Number of Non
Conformances
Recorded
Minimum Aud
Length A
MC
1 1
0 1
0 0
0 0
0 0
0 0
0 0
0 0
4 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
49
ction S2 – Km 2.2
km 10
n‐
s
it
Non‐
Conformances
Weighting
B
Sub‐W
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
9
240 to Km 10.00
Weighting
No of
nsecutive
ks/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 2
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 8
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
10
Total Non‐
Conformance
Score
A*B*C
MC
2Rutting
1Rever
4+500
0
0
0
0
0
0
0
During
restored
0
0
0
0
0
0
6
0
9
Comments
observed at km 2+420 to Km
(28 to 30mm)
rse slope & Raincuts found b
0 to 4+600 R.H.S & 4+900 to
g MC Audit the missing RPMs
between km 2 to 4, Km 6 to
10
RUS&CPM ‐ 2
Photo
Reference N
m 2+460 R.H.S 7 & 8
etween km
5+000 L.H.S9 & 10
s were found
7 and km 9 to
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavemen
RUS&CPM2 Unsealed
RUS&CPM3 Drainage
RUS&CPM4 Routine M
RUS&CPM5 Obstructi
RUS&CPM6 Incident a
RUS&CPM7 Vegetatio
RUS&CPM8 Roadside
RUS&CPM9 Raised Re
RUS&CPM10 Pavemen
RUS&CPM11 Traffic Isl
RUS&CPM12 Crash Bar
RUS&CPM13 Sight Rail
RUS&CPM14Marker P
Distance
Any RUS&CPM Repeated
Any RUS&CPMAny un‐re
Monitorin
Any Road Safety
Hazards
Any Imm
for Repai
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Description
nt Maintenance
d Shoulder Maintenence
Maintenance
Maintenance of Bridge and ot
ions on the Pavement Surface
and Emergency Works Respon
on Control
e Signs Maintenance
eflective Pavement Markers
nt Markings ‐ (Lines, Text, Sym
and and Roundabout Mainten
rrier Maintenance
s, Hand Rail and Pedestrian B
osts (Guard Stones, Boundry,
Markers, Hazard)
d Non‐Conformance in Consec
eported Non‐Conformance ide
ng Consultant
ediate Safety Hazard to Road
r
Bathinda Network in P
Table
5 km Aud
Minimum
for Ea
Non ‐ C
5km (1k
or c
edg
5km (1k
her Structures
e and Shoulders
nse
5k
mbols etc) 5k
nance
Barrier Maintenance
, Edge, Culvert,
cutive Months
entified by the
Users Instructed
Tot
Punjab (India)
4‐12 : Verificatio
dit Length Start Location S
m Audit Length
ch Recorded
Conformance
Number of
Conforman
Recorde
Minimum A
Length A
Contract
m for ravelling
cracking or
gebreake)
1
km for Shape) 0
1km 0
5km 0
1km 0
N/A 0
5km 0
5km 0
km/1km 1
km/1km 0
5km 0
5km 0
5km 0
5km 0
0
0
0
al Score
on of Audit –Sect
2 km 15 to km 20
Non‐
nces
ed
Audit
A
or
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
MC
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
50
tion S2 – Km 15.
Non‐
Conformances
Weighting
B
Sub‐Weigh
No of
Consecut
Weeks/Mo
C
2 1
1 1
2 1
2 1
1 1
2 1
1 1
2 1
2 1
2 1
1 1
1 1
1 1
2 1
6 0
6 1
6 0
0
00 to Km 20.00
ting
ive
nths
Total Non‐
Conformance
Score
A*B*C
Contractor
To
Con
2
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
4
otal Non‐
nformance
Score
A*B*C
MC
2Km 17+000 to 18
0
0
0
0
0
0
0
0During MC Au
0
0
0
0
0
0
0
0
2
Comments
8+000 cracks found on pavem
udit the missing RPMs were fo
between km 16 to 17
Photo
Reference
ment surface
ound restored
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainage
RUS&CPM4 Routine
RUS&CPM5 Obstruct
RUS&CPM6 Incident
RUS&CPM7 Vegetati
RUS&CPM8 Roadsid
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic Is
RUS&CPM12 Crash Ba
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐r
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descriptio
nt Maintenance
d Shoulder Maintenence
e Maintenance
Maintenance of Bridge and
tions on the Pavement Surfa
t and Emergency Works Resp
ion Control
e Signs Maintenance
Reflective Pavement Markers
nt Markings ‐ (Lines, Text, Sy
sland and Roundabout Maint
arrier Maintenance
ils, Hand Rail and Pedestrian
Posts (Guard Stones, Boundr
e Markers, Hazard)
ed Non‐Conformance in Cons
reported Non‐Conformance
ring Consultant
mediate Safety Hazard to Roa
air
Bathinda Network in P
Table 4
5 km
n
Minim
for
Non
5km
o
5km
other Structures
ace and Shoulders
ponse
s
ymbols etc)
tenance
n Barrier Maintenance
ry, Edge, Culvert,
secutive Months
identified by the
ad Users Instructed
T
Punjab (India)
4‐13 : Verificatio
Audit Length Start Location
mum Audit Length
r Each Recorded
n ‐ Conformance
Numbe
Confor
Reco
Minimu
Len
Cont
(1km for ravelling
or cracking or
edgebreake)
(1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
S2 km 45 to km 50
er of Non‐
rmances
orded
um Audit
gth A
tractor
Number of No
Conformance
Recorded
Minimum Aud
Length A
MC
0 0
1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
51
ction S2 – Km 45.
on‐
es
dit
Non‐
Conformances
Weighting
B
Sub‐W
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
1
.00 to Km 50.00
Weighting
No of
nsecutive
ks/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 0
1 1
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
1
Total Non‐
Conformance
Score
A*B*C
MC
0
1Low sho
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
Comments
oulder found between Km 45
locations
Photo
Reference N
5 to 50 at few 11 & 12
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainag
RUS&CPM4 Routine
RUS&CPM5 Obstruc
RUS&CPM6 Inciden
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised
RUS&CPM10 Paveme
RUS&CPM11 Traffic I
RUS&CPM12 Crash B
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distanc
Any RUS&CPM Repeat
Any RUS&CPMAny un‐
Monito
Any Road Safety
Hazards
Any Im
for Rep
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descripti
ent Maintenance
ed Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
ctions on the Pavement Sur
t and Emergency Works Res
tion Control
de Signs Maintenance
Reflective Pavement Marke
ent Markings ‐ (Lines, Text,
Island and Roundabout Mai
Barrier Maintenance
ails, Hand Rail and Pedestria
r Posts (Guard Stones, Boun
ce Markers, Hazard)
ed Non‐Conformance in Con
‐reported Non‐Conformance
oring Consultant
mediate Safety Hazard to R
pair
Bathinda Network in P
Table 4
5 k
ion
Min
f
N
5k
5k
d other Structures
rface and Shoulders
sponse
ers
Symbols etc)
intenance
an Barrier Maintenance
dry, Edge, Culvert,
nsecutive Months
e identified by the
oad Users Instructed
Punjab (India)
4‐14 : Verificatio
m Audit Length Start Locati
nimum Audit Length
for Each Recorded
Non ‐ Conformance
Num
Con
R
Mini
L
Co
m (1km for ravelling
or cracking or
edgebreake)
km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
on S2 km 60 to km
mber of Non‐
nformances
Recorded
imum Audit
Length A
ontractor
Number of N
Conforman
Recorded
Minimum A
Length A
MC
0 0
1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
52
ction S2 – Km 60.
m 65
Non‐
nces
d
Audit
A
Non‐
Conformances
Weighting
B
Su
C
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
2
.00 to Km 65.00
ub‐Weighting
No of
Consecutive
eeks/Months
C
Total Non
Conforman
Score
A*B*C
Contracto
1 0
1 1
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
1
n‐
nce
or
Total Non‐
Conformance
Score
A*B*C
MC
0
1Sh
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
Comments
houlder eroded & rain cuts f
between Km 62 to 63
Photo
Reference No
found
o.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavem
RUS&CPM2 Unsea
RUS&CPM3 Draina
RUS&CPM4 Routin
RUS&CPM5 Obstru
RUS&CPM6 Incide
RUS&CPM7 Vegeta
RUS&CPM8 Roads
RUS&CPM9 Raised
RUS&CPM10 Pavem
RUS&CPM11 Traffic
RUS&CPM12 Crash
RUS&CPM13 Sight R
RUS&CPM14Marke
Distan
Any RUS&CPM Repea
Any RUS&CPMAny un
Monit
Any Road Safety
Hazards
Any Im
for Re
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descript
ment Maintenance
aled Shoulder Maintenence
age Maintenance
ne Maintenance of Bridge an
uctions on the Pavement Sur
nt and Emergency Works Re
ation Control
side Signs Maintenance
d Reflective Pavement Marke
ment Markings ‐ (Lines, Text,
c Island and Roundabout Ma
Barrier Maintenance
Rails, Hand Rail and Pedestri
er Posts (Guard Stones, Boun
nce Markers, Hazard,Road De
ated Non‐Conformance in Co
n‐reported Non‐Conformanc
oring Consultant
mmediate Safety Hazard to R
pair
Bathinda Network in P
Table 4
ion
Min
f
N
5km
5k
d other Structures
rface and Shoulders
esponse
ers
Symbols etc)
intenance
an Barrier Maintenance
ndry, Edge, Culvert,
elineators)
nsecutive Months
ce identified by the
Road Users Instructed
Roa
Punjab (India)
4‐15 : Verificatio
nimum Audit Length
for Each Recorded
on ‐ Conformance
Numb
Conf
Re
Minim
Le
Co
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
ad Section: S2; Length of Aud
on of Audit – Sec
ber of Non‐
formances
ecorded
mum Audit
ength A
ntractor
Number of N
Conformanc
Recorded
Minimum Au
Length A
MC
0 0
1 1
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
dit Section: 5 km; Location f
53
ction S2 – Km 65.
Non‐
ces
d
udit
Non‐
Conformances
Weighting
B
Su
C
We
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
rom km 65 to km 70
3
.00 to Km 70.00
b‐Weighting
No of
Consecutive
eeks/Months
C
Total Non‐
Conformanc
Score
A*B*C
Contractor
1 0
1 1
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
3
ce
Total Non‐
Conformance
Score
A*B*C
MC
0
1Low s
0
0
0
0
0
0
0Durin
0
0
0
0
0
0
0
0
1
Comments
shoulder and rain cuts obser
km 69 to 70 at few locai
ng MC Audit the missing RPM
restored between km 68
Photo
Reference N
rved between
ions
Ms were found
to 69
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavem
RUS&CPM2 Unse
RUS&CPM3 Drain
RUS&CPM4 Routi
RUS&CPM5 Obstr
RUS&CPM6 Incide
RUS&CPM7 Veget
RUS&CPM8 Road
RUS&CPM9 Raise
RUS&CPM10 Pavem
RUS&CPM11 Traffi
RUS&CPM12 Crash
RUS&CPM13 Sight
RUS&CPM14Mark
Dista
Any RUS&CPM Repe
Any RUS&CPMAny u
Moni
Any Road Safety
Hazards
Any I
for Re
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descrip
ment Maintenance
aled Shoulder Maintenence
nage Maintenance
ine Maintenance of Bridge a
ructions on the Pavement Su
ent and Emergency Works R
tation Control
side Signs Maintenance
ed Reflective Pavement Mark
ment Markings ‐ (Lines, Text
c Island and Roundabout M
h Barrier Maintenance
Rails, Hand Rail and Pedest
ker Posts (Guard Stones, Bou
nce Markers, Hazard)
ated Non‐Conformance in C
un‐reported Non‐Conforman
toring Consultant
mmediate Safety Hazard to
epair
Bathinda Network in P
Table 4
5
ption
M
5
5
and other Structures
urface and Shoulders
Response
kers
t, Symbols etc)
aintenance
trian Barrier Maintenance
undry, Edge, Culvert,
Consecutive Months
nce identified by the
Road Users Instructed
Punjab (India)
4‐16 : Verificatio
km Audit Length Start Loca
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
Num
Co
Min
C
5km (1km for ravelling
or cracking or
edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
ation S2 km 75 to k
mber of Non‐
onformances
Recorded
nimum Audit
Length A
Contractor
Number of
Conforma
Record
Minimum
Length
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
5 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
54
ction S2 – Km 75.
km 80
f Non‐
ances
ed
Audit
A
Non‐
Conformances
Weighting
BW
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
4
.00 to Km 80.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Total No
Conforma
Score
A*B*C
Contract
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 10
1 0
1 0
1 0
1 0
2 12
1 0
0 0
24
on‐
ance
e
C
tor
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0D
fou
0Durin
0
0
0
0
0 Pav
0
0
0
Comments
uring MC Audit the missing
und restored between km 7
ng MC Audit the Pavement m
ok between km 75 to
RUS&CPM ‐ 10 (During MC
vement marking found ok be
to 80)
Photo
Reference
RPMs were
6+230 B.H.S
marking found
o 80
Audit the
etween km 75
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainage
RUS&CPM4 Routine
RUS&CPM5 Obstruct
RUS&CPM6 Incident
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic Is
RUS&CPM12 Crash Ba
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐r
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descriptio
nt Maintenance
d Shoulder Maintenence
e Maintenance
Maintenance of Bridge and
tions on the Pavement Surfa
t and Emergency Works Res
ion Control
e Signs Maintenance
Reflective Pavement Marker
nt Markings ‐ (Lines, Text, S
sland and Roundabout Main
arrier Maintenance
ils, Hand Rail and Pedestria
Posts (Guard Stones, Bound
e Markers, Hazard)
ed Non‐Conformance in Con
reported Non‐Conformance
ring Consultant
mediate Safety Hazard to Ro
air
Bathinda Network in P
Table
5 km
on
Mini
fo
No
5km
5km
other Structures
ace and Shoulders
ponse
rs
Symbols etc)
ntenance
n Barrier Maintenance
dry, Edge, Culvert,
secutive Months
identified by the
oad Users Instructed
T
Punjab (India)
e 4‐17: Verificati
m Audit Length Start Location
imum Audit Length
or Each Recorded
on ‐ Conformance
Numbe
Confo
Rec
Minim
Len
Con
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
ion of Audit – Se
n S4 km 0 to km 5
er of Non‐
ormances
corded
mum Audit
ngth A
ntractor
Number of Non
Conformances
Recorded
Minimum Aud
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
55
ction S4 – Km 0.
n‐
s
it
Non‐
Conformances
Weighting
B
Sub‐
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
5
00 to Km 5.00
Weighting
No of
nsecutive
ks/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
2
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0During M
res
0
0
0
0
0
0
0
0
0
Comments
MC Audit the missing RPMs
tored between km 2+800 to
Photo
Reference N
were found
o 3+000
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavem
RUS&CPM2 Unsea
RUS&CPM3 Drain
RUS&CPM4 Routi
RUS&CPM5 Obstr
RUS&CPM6 Incide
RUS&CPM7 Veget
RUS&CPM8 Roads
RUS&CPM9 Raise
RUS&CPM10 Pavem
RUS&CPM11 Traffic
RUS&CPM12 Crash
RUS&CPM13 Sight
RUS&CPM14Marke
Distan
Any RUS&CPM Repea
Any RUS&CPMAny u
Monit
Any Road Safety
Hazards
Any Im
for Re
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descrip
ment Maintenance
aled Shoulder Maintenence
age Maintenance
ne Maintenance of Bridge a
ructions on the Pavement Su
ent and Emergency Works R
tation Control
side Signs Maintenance
d Reflective Pavement Mark
ment Markings ‐ (Lines, Text
c Island and Roundabout M
h Barrier Maintenance
Rails, Hand Rail and Pedest
er Posts (Guard Stones, Bou
nce Markers, Hazard,Road D
ated Non‐Conformance in C
un‐reported Non‐Conforman
toring Consultant
mmediate Safety Hazard to
epair
Bathinda Network in P
Table
ption
M
5
and other Structures
urface and Shoulders
Response
kers
t, Symbols etc)
Maintenance
trian Barrier Maintenance
undry, Edge, Culvert,
Delineators)
Consecutive Months
nce identified by the
Road Users Instructed
R
Punjab (India)
e 4‐18: Verificatio
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
Nu
C
M
5km (1km for ravelling
or cracking or
edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
Road Section: S4; Length of
on of Audit – Sec
umber of Non‐
Conformances
Recorded
inimum Audit
Length A
Contractor
Number
Conform
Reco
Minimum
Leng
M
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Audit Section: 5 km; Locati
56
ction S4 – Km 5.0
of Non‐
mances
rded
m Audit
gth A
MC
Non‐
Conformances
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
0 1
0 2
0 2
0 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
ion from km 5 to km 10
6
00 to Km 10.00
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
Tota
Confo
Sc
A*
Cont
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
l Non‐
rmance
core
B*C
ractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Comments
Photo
Reference N
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unsealed
RUS&CPM3 Drainage
RUS&CPM4 Routine
RUS&CPM5 Obstruct
RUS&CPM6 Incident
RUS&CPM7 Vegetati
RUS&CPM8 Roadside
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic Is
RUS&CPM12 Crash Ba
RUS&CPM13 Sight Ra
RUS&CPM14Marker P
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐r
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Description
nt Maintenance
d Shoulder Maintenence
e Maintenance
Maintenance of Bridge and o
tions on the Pavement Surfa
and Emergency Works Resp
ion Control
e Signs Maintenance
Reflective Pavement Markers
nt Markings ‐ (Lines, Text, Sy
sland and Roundabout Maint
arrier Maintenance
ils, Hand Rail and Pedestrian
Posts (Guard Stones, Boundr
e Markers, Hazard,Road Delin
ed Non‐Conformance in Cons
reported Non‐Conformance i
ring Consultant
mediate Safety Hazard to Roa
air
Bathinda Network in P
Table 4
5 km A
n
Minim
for
Non
5km (
o
e
5km
other Structures
ce and Shoulders
ponse
s
ymbols etc)
tenance
n Barrier Maintenance
ry, Edge, Culvert,
neators)
ecutive Months
identified by the
ad Users Instructed
T
Punjab (India)
4‐19 : Verificatio
Audit Length Start Location
mum Audit Length
Each Recorded
n ‐ Conformance
Number
Confor
Reco
Minimu
Leng
Contr
(1km for ravelling
or cracking or
edgebreake)
0
(1km for Shape) 0
1km 0
5km 0
1km 0
N/A 0
5km 0
5km 0
5km/1km
5km/1km 0
5km 0
5km 0
5km 0
5km 0
0
0
0
Total Score
on of Audit – Sec
S4 km 15 to km 20
r of Non‐
mances
orded
um Audit
gth A
ractor
Number of Non
Conformances
Recorded
Minimum Aud
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
57
ction S4 – Km 15.
n‐
s
it
Non‐
Conformances
Weighting
B
Sub‐W
Con
Week
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
7
.00 to Km 20.00
Weighting
No of
nsecutive
ks/Months
C
Total Non‐
Conformance
Score
A*B*C
Contractor
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
2
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0During
res
0
0
0
0
0
0
0
0
0
Comments
g MC Audit the missing RPMs
stored between km 17+650to
Photo
Reference N
s were found
o 17+700
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pavem
RUS&CPM2 Unseal
RUS&CPM3 Draina
RUS&CPM4 Routin
RUS&CPM5 Obstru
RUS&CPM6 Inciden
RUS&CPM7 Vegeta
RUS&CPM8 Roadsi
RUS&CPM9 Raised
RUS&CPM10 Pavem
RUS&CPM11 Traffic
RUS&CPM12 Crash B
RUS&CPM13 Sight R
RUS&CPM14Marke
Distan
Any RUS&CPM Repeat
Any RUS&CPMAny un
Monito
Any Road Safety
Hazards
Any Im
for Rep
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descripti
ment Maintenance
led Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
uctions on the Pavement Surf
nt and Emergency Works Res
ation Control
ide Signs Maintenance
Reflective Pavement Marke
ment Markings ‐ (Lines, Text, S
Island and Roundabout Mai
Barrier Maintenance
Rails, Hand Rail and Pedestria
r Posts (Guard Stones, Boun
ce Markers, Hazard,Road De
ted Non‐Conformance in Con
n‐reported Non‐Conformance
oring Consultant
mmediate Safety Hazard to Ro
pair
Bathinda Network in P
Table
on
Min
fo
N
5km
5km
d other Structures
face and Shoulders
sponse
ers
Symbols etc)
ntenance
an Barrier Maintenance
dry, Edge, Culvert,
elineators)
nsecutive Months
e identified by the
oad Users Instructed
Roa
Punjab (India)
4‐20 : Verificatio
nimum Audit Length
or Each Recorded
on ‐ Conformance
Numb
Conf
Re
Minim
Le
Co
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
d Section: S5; Length of Aud
on of Audit – Sec
ber of Non‐
formances
ecorded
mum Audit
ength A
ntractor
Number of N
Conformanc
Recorded
Minimum Au
Length A
MC
0 0
1 1
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
dit Section: 5 km; Location f
58
ction S5 – Km 5.0
Non‐
ces
d
udit
A
Non‐
Conformances
Weighting
B
Su
C
We
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
from km 5 to km 10
8
00 to Km 10.00
ub‐Weighting
No of
Consecutive
eeks/Months
C
Total Non‐
Conformanc
Score
A*B*C
Contractor
1 0
1 1
1 0
1 0
1 0
1 0
1 1
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
2
‐
ce
r
Total Non‐
Conformance
Score
A*B*C
MC
0
1Low s
0
0
0
0
0Du
0
0
0
0
0
0
0
0
0
0
1
Comments
shoulder, reverse slope obse
km 5+000 to 10+000
ring MC Audit no Vegetation
between km 5 to 10
Photo
Reference N
erved between
0
n was found
0
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainag
RUS&CPM4 Routine
RUS&CPM5 Obstruc
RUS&CPM6 Incident
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic I
RUS&CPM12 Crash B
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distanc
Any RUS&CPM Repeate
Any RUS&CPMAny un‐
Monito
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descriptio
ent Maintenance
ed Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
ctions on the Pavement Surf
t and Emergency Works Res
tion Control
de Signs Maintenance
Reflective Pavement Marker
ent Markings ‐ (Lines, Text, S
sland and Roundabout Main
arrier Maintenance
ails, Hand Rail and Pedestria
Posts (Guard Stones, Bound
e Markers, Hazard,Road De
ed Non‐Conformance in Con
‐reported Non‐Conformance
ring Consultant
mediate Safety Hazard to Ro
air
Bathinda Network in P
Table 4
5 km
on
Min
fo
No
5km
5km
d other Structures
face and Shoulders
sponse
rs
Symbols etc)
ntenance
an Barrier Maintenance
dry, Edge, Culvert,
lineators)
nsecutive Months
e identified by the
oad Users Instructed
Punjab (India)
4‐21 : Verificatio
m Audit Length Start Locatio
imum Audit Length
or Each Recorded
on ‐ Conformance
Numb
Conf
Re
Minim
Le
Co
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
n S5 km 15 to km 20
ber of Non‐
formances
ecorded
mum Audit
ength A
ontractor
Number of N
Conforman
Recorde
Minimum A
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
59
ction S5 – Km 15.
0
Non‐
nces
d
Audit
A
Non‐
Conformances
Weighting
B
S
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
9
.00 to Km 20.00
ub‐Weighting
No of
Consecutive
Weeks/Months
C
Total No
Conforma
Score
A*B*C
Contract
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 2
1 0
1 0
1 0
1 0
1 0
2 0
1 0
0 0
2
n‐
nce
or
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0D
0
0
0
0
0
0
0
0
0
Comments
During MC Audit the missing
found restored between km
Photo
Reference N
g RPMs were
m 16 to 17
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainag
RUS&CPM4 Routine
RUS&CPM5 Obstruc
RUS&CPM6 Incident
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic Is
RUS&CPM12 Crash B
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distance
Any RUS&CPM Repeate
Any RUS&CPMAny un‐
Monitor
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descriptio
ent Maintenance
ed Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
ctions on the Pavement Surf
t and Emergency Works Res
tion Control
de Signs Maintenance
Reflective Pavement Marker
ent Markings ‐ (Lines, Text, S
sland and Roundabout Main
arrier Maintenance
ails, Hand Rail and Pedestria
Posts (Guard Stones, Bound
e Markers, Hazard,Road Del
ed Non‐Conformance in Con
‐reported Non‐Conformance
ring Consultant
mediate Safety Hazard to Ro
air
Bathinda Network in P
Table 4
5.34
on
Mini
fo
No
5km
5km
d other Structures
ace and Shoulders
ponse
rs
Symbols etc)
ntenance
n Barrier Maintenance
dry, Edge, Culvert,
lineators)
secutive Months
e identified by the
oad Users Instructed
Punjab (India)
4‐22 : Verificatio
4 km Audit Length Start Loca
imum Audit Length
or Each Recorded
on ‐ Conformance
Numb
Conf
Re
Minim
Le
Con
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
n of Audit – Sect
tion S5 km 20 to km
ber of Non‐
formances
ecorded
mum Audit
ength A
ntractor
Number of N
Conforman
Recorded
Minimum A
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 1
0 0
0 0
60
tion S5 – Km 20.0
m 25.340
Non‐
ces
d
udit
A
Non‐
Conformances
Weighting
B
Su
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
0
00 to Km 25.340
ub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non
Conforman
Score
A*B*C
Contracto
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
4 0
1 0
0 0
0
n‐
nce
or
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
0
0
0
2Cent
0
0
0
0
24RUS&
0
0
26
Comments
terline Pavement marking fa
between km 24 to 25+
&CPM‐ 10 ( 4 months From
July 2016)
Photo
Reference N
aded/missing
+340 13 & 14
April 2016 to
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainag
RUS&CPM4 Routine
RUS&CPM5 Obstruc
RUS&CPM6 Incident
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised R
RUS&CPM10 Paveme
RUS&CPM11 Traffic I
RUS&CPM12 Crash B
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distanc
Any RUS&CPM Repeate
Any RUS&CPMAny un‐
Monito
Any Road Safety
Hazards
Any Imm
for Repa
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descripti
ent Maintenance
ed Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
ctions on the Pavement Surf
t and Emergency Works Res
tion Control
de Signs Maintenance
Reflective Pavement Marke
ent Markings ‐ (Lines, Text,
sland and Roundabout Mai
arrier Maintenance
ails, Hand Rail and Pedestria
Posts (Guard Stones, Boun
e Markers, Hazard)
ed Non‐Conformance in Con
‐reported Non‐Conformance
ring Consultant
mediate Safety Hazard to R
air
Bathinda Network in P
Table 4
5.8
on
Mi
N
5k
5k
d other Structures
face and Shoulders
sponse
ers
Symbols etc)
ntenance
an Barrier Maintenance
dry, Edge, Culvert,
nsecutive Months
e identified by the
oad Users Instructed
Punjab (India)
4‐23 : Verificatio
80 km Audit Length Start Loc
nimum Audit Length
for Each Recorded
Non ‐ Conformance
Num
Con
R
Min
L
Co
km (1km for ravelling
or cracking or
edgebreake)
km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
cation B8 Km 9.2
mber of Non‐
nformances
Recorded
imum Audit
Length A
ontractor
Number of N
Conforman
Recorded
Minimum A
Length A
MC
1 1
0 0
0 0
0 0
0 0
0 0
0 0
0 1
0 0
0 0
0 1
0 0
0 0
0 0
0 0
0 2
0 0
61
tion B8 – Km 9.2
to Km 15
Non‐
nces
d
Audit
A
Non‐
Conformances
Weighting
B
Su
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
1
200 to Km 15.00
ub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non
Conforman
Score
A*B*C
Contracto
1 2
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
3 0
1 0
0 0
2
n‐
nce
or
Total Non‐
Conformance
Score
A*B*C
MC
2 Pav
0
0
0
0
0
0
2R
0
0
1Cent
p
0
0
0
0
12
0
17
Comments
vement shoves are observed
Km 13+395 to 13+40
oadside signs were damage
maintained between km 9.
tral Verge kerbs maintenanc
ainting faded between km 9
RUS & CPM ‐ 8 & 11
Photo
Reference N
d between
0
15 & 16
ed & not
2 to 12
17, 18 ,19 & 2
21
ce poor and
9.2 to 1022, 23 & 24
o.
20 ,
4
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Paveme
RUS&CPM2 Unseale
RUS&CPM3 Drainag
RUS&CPM4 Routine
RUS&CPM5 Obstruc
RUS&CPM6 Inciden
RUS&CPM7 Vegetat
RUS&CPM8 Roadsid
RUS&CPM9 Raised
RUS&CPM10 Paveme
RUS&CPM11 Traffic I
RUS&CPM12 Crash B
RUS&CPM13 Sight Ra
RUS&CPM14Marker
Distanc
Any RUS&CPM Repeat
Any RUS&CPMAny un‐
Monito
Any Road Safety
Hazards
Any Im
for Rep
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Descriptio
ent Maintenance
ed Shoulder Maintenence
ge Maintenance
e Maintenance of Bridge and
ctions on the Pavement Surf
t and Emergency Works Res
tion Control
de Signs Maintenance
Reflective Pavement Marke
ent Markings ‐ (Lines, Text, S
Island and Roundabout Mai
Barrier Maintenance
ails, Hand Rail and Pedestria
r Posts (Guard Stones, Bound
ce Markers, Hazard)
ed Non‐Conformance in Con
‐reported Non‐Conformance
oring Consultant
mediate Safety Hazard to Ro
air
Bathinda Network in P
Table 4
5 km
onfo
N
5km
5km
d other Structures
face and Shoulders
sponse
rs
Symbols etc)
ntenance
an Barrier Maintenance
dry, Edge, Culvert,
nsecutive Months
e identified by the
oad Users Instructed
Punjab (India)
4‐24 : Verificatio
m Audit Length Start Locatio
Minimum Audit
Length
or Each Recorded
on ‐ Conformance
Numb
Conf
Re
Minim
Le
Co
m (1km for ravelling
or cracking or
edgebreake)
m (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
5km
5km
Total Score
on of Audit – Sec
n B8 Km 15 to
ber of Non‐
formances
ecorded
mum Audit
ength A
ntractor
Number of N
Conforman
Recorded
Minimum Au
Length A
MC
0 0
0 0
0 0
0 0
0 0
0 0
1 1
0 0
2 0
0 1
0 0
0 0
0 0
0 0
0 0
0 1
0 0
62
tion B8 – Km 15.
Km 20
Non‐
ces
d
udit
A
Non‐
Conformances
Weighting
B
Su
W
2
1
2
2
1
2
1
2
2
2
1
1
1
2
6
6
6
2
.00 to Km 20.00
ub‐Weighting
No of
Consecutive
Weeks/Months
C
Total Non
Conforman
Score
A*B*C
Contracto
1 0
1 0
1 0
1 0
1 0
1 0
1 1
1 0
1 4
1 0
1 0
1 0
1 0
1 0
0 0
1 0
0 0
5
n‐
nce
or
Total Non‐
Conformance
Score
A*B*C
MC
0
0
0
0
0
0
1
0
0During
2Cent
0
0
0
0
0
6
0
9
Comments
Vegetation found on sho
g MC Audit the missing RPM
restored between km 15
terline Pavement marking fa
between km 15 to 16
RUS&CPM ‐ 10
Photo
Reference N
ulder
Ms were found
to 17
ded/missing
625 & 26
No.
OM
TNM TECMAN
OPRC World Bank ProjMonthly Progress Report N
Month : JULY 2016
Non‐Conformance
Relating To
RUS&CPM1 Pave
RUS&CPM2 Uns
RUS&CPM3 Drai
RUS&CPM4 Rou
RUS&CPM5 Obs
RUS&CPM6 Incid
RUS&CPM7 Veg
RUS&CPM8 Roa
RUS&CPM9 Rais
RUS&CPM10 Pave
RUS&CPM11 Traf
RUS&CPM12 Cras
RUS&CPM13 Sigh
RUS&CPM14Mar
Dist
Any RUS&CPM Rep
Any RUS&CPMAny
Mon
Any Road Safety
Hazards
Any
for R
HNOLOGY AND NAGEMENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Item Desc
ement Maintenance
ealed Shoulder Maintenen
inage Maintenance
tine Maintenance of Bridge
tructions on the Pavement
dent and Emergency Works
etation Control
dside Signs Maintenance
sed Reflective Pavement M
ement Markings ‐ (Lines, Te
ffic Island and Roundabout
sh Barrier Maintenance
ht Rails, Hand Rail and Pede
rker Posts (Guard Stones, B
tance Markers, Hazard)
eated Non‐Conformance in
un‐reported Non‐Conform
nitoring Consultant
Immediate Safety Hazard
Repair
Bathinda Network in P
Table 4
cription
ce
e and other Structures
t Surface and Shoulders
s Response
arkers
ext, Symbols etc)
Maintenance
estrian Barrier Maintenanc
Boundry, Edge, Culvert,
n Consecutive Months
mance identified by the
to Road Users Instructed
Punjab (India)
4‐25 : Verificatio
5 km Audit Length Start
Minimum Audit Length
for Each Recorded
Non ‐ Conformance
5km (1km for ravelling
or cracking or
edgebreake)
5km (1km for Shape)
1km
5km
1km
N/A
5km
5km
5km/1km
5km/1km
5km
5km
ce 5km
5km
Total Score
on of Audit – Sec
Location B8 Km 2
Number of Non‐
Conformances
Recorded
Minimum Audit
Length A
Contractor
Numb
Confo
Re
Minim
Le
0
0
0
0
0
0
1
0
1
0
0
0
0
0
0
0
0
63
tion B8 – Km 20.
20 to km 25
ber of Non‐
ormances
ecorded
mum Audit
ength A
MC
Non‐
Conformance
Weighting
B
0 2
0 1
0 2
0 2
0 1
0 2
1 1
0 2
1 2
0 2
0 1
0 1
0 1
0 2
0 6
0 6
0 6
3
.00 to Km 25.00
es
Sub‐Weighting
No of
Consecutive
Weeks/Months
C
T
Co
C
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
0
otal Non‐
nformance
Score
A*B*C
ontractor
Total Non‐
Conformance
Score
A*B*C
MC
0 0
0 0
0 0
0 0
0 0
0 0
1 1
0 0
2 2
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
3 3
e
Comments
Vegetation found on
Cat eyes missing betw
to 24
Photo
Reference N
shoulder
ween Km 23
No.
TNM
OPRC World Monthly Progre
4.4
[
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
Audit Inspect
[Photograph N
Photo R
Photo R
Photo R
OGY AND MENT LTD.
angrur Mansa Batly 2016)
tion’s Photog
Numbers As R
eference No.
eference No.
eference No.
thinda Network in
graphic Recor
Referred in Ab
1
3
5
Punjab (India)
rd of Non‐Co
bove Tables (
nformances
(From Table 4
Photo
Photo
Photo
4.10 To Table
o Reference N
o Reference N
o Reference N
64
4.25)]
No. 2
No. 4
No. 6
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
Photo R
Photo R
Photo Re
OGY AND MENT LTD.
angrur Mansa Batly 2016)
eference No.
eference No.
eference No.
thinda Network in
7
9
11
Punjab (India)
Photo
Photo
Photo
o Reference N
Reference N
Reference N
65
No. 8
o. 10
o. 12
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
Photo Re
Photo Re
Photo Re
OGY AND MENT LTD.
angrur Mansa Batly 2016)
eference No.
eference No.
eference No.
thinda Network in
13
15
17
Punjab (India)
Photo
Photo
Photo
Reference N
Reference N
Reference N
66
o. 14
o. 16
o. 18
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
Photo Re
Photo Re
Photo Re
OGY AND MENT LTD.
angrur Mansa Batly 2016)
eference No.
eference No.
eference No.
thinda Network in
19
21
23
Punjab (India)
Photo
Photo
Photo
Reference N
Reference N
Reference N
67
o. 20
o. 22
o. 24
TNM
OPRC World Monthly Progre
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
Photo Re
OGY AND MENT LTD.
angrur Mansa Batly 2016)
eference No.
thinda Network in
25
Punjab (India)
Photo
Reference N
68
o. 26
TNM
OPRC World Monthly Progre
5 ENV
5.1
5.2
SI.
No.
De
1 RO
wit
day
any
of
2 Bo
Ma
3 Co
and
fac
ma
4 Co(bonowama
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
VIRONME
Environmen
This part ofmanagementIssues relatedstaff at site, management
Complianceguidelines
Table 5‐
escription Act
OW Encroachm
thin five work
ys of observin
y encroachme
ROW.
rrow Area
anagement
nstruction pla
d Contractor‘
cilities
anagement
nstruction waoth hazardoun‐hazardous aste) anagement.
OGY AND MENT LTD.
angrur Mansa Batly 2016)
ENTAL&S
ntalManage
f the report t conducted dd to functionaair pollution
t were discus
e as per En
‐1: Complianc
tivity
Co
ment
king
ng
ent
N
ants
‘s com
impl
aste s and
Sr
thinda Network in
OCIALMA
ement
highlights tduring the moality of equipn control actsed. Observa
nvironment
ce as per Env World
Status as Pe
ontractor’s M
Nil
Not applicabl
All regulatormpliance obtaand adequatementation ospecific EMP
Stored, reuserecycled & so
regularly.
Punjab (India)
ANAGEME
the activitiesonth of July 2ment’s, healttivities, dust tions and key
tal Perform
ironmental PBank guideli
r
MPR M
Regu
requ
e. Reco
of b
be
main
y ained e of site P.
Facilplanmainwithraise
d, old
Solid
Was
Man
as p
Act.
Spill
othe
shou
oil c
othe
store
wast
ENT
s related to 2016. th and safetyemission coy issues have
mance Indic
Performancenes
Action Requ
Measures to b
ular observ
uired.
ords of reha
borrow area
closed
ntained at sit
lities for lant site shntained in ach the obsed by the MC
d and H
ste
nagement to
per Provision
age of bitu
er hazard
uld be contr
ontaminated
er waste sh
ed under h
te facility.
the Environ
y of labour anontrol, water been explain
cators as p
Indicators as
ired /
be taken
vation is
abilitation
closed/to
shall be
e.
Bo
abor and ould be ccordance servations C
R2
Hazardous
Material
be done
ns of the
men and
material
rolled and
d sand and
hould be
hazardous
OcnpaoPac
69
nment and
d other contrand waste w
ned in the rep
per World
s per
Remar
Borrow area old Camp Site
Refer MPR o2016.
Organic composting unot maintainplastic wastalso dumpedorganic wasProper segand disposacarried out.
social
ractor water port.
Bank
ks
near the e
of June,
Waste unit was ned and te was d in the ste pit. gregation l to be
TNM
OPRC World Monthly Progre
5 Am
(AA
con
str
6 AmLevconstr
7 Reg
com
8 EnvMaPro
9 OpMaProlabduma
10 Machaarcremexccon
11 Precomdisto inccom
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
mbient Air Qu
AQ) in
nstruction
etches.
mbient Noise vels (ANL) in nstruction etches.
gulatory
mpliance.
vironmental anagement ocess.
perational anagement ocesses includbour deploymring routine aaintenance w
anagement ofance discoverchaeological mains at any scavated undentract.
evention of mmunicable seases spreadnew areas ducreased mmunication
OGY AND MENT LTD.
angrur Mansa Batly 2016)
ality Mittakthe
sprindu
Mittake
mo
mo
Dorelic
conup
Envi
malink beeap
ding ment and ork.
As
ma
f any ry of
site er the
ding ue to
s.
HIVcamothe
o
thinda Network in
tigation measken for enhane AAQ by regnkling of watust suppressi
tigation measen for reducinnoise level &nitoring has bcarried as penitoring sche
cumentationecord keepingcenses/ permsents & renewpdated regula
EnvironmentScreening,
ironmental ImAssessment &Environmentnagement Plaspecific roaden submittedproved by cli
s per scheduleroutine and
aintenance w
Not found.
V‐AIDS awarep is conducteer measures tn regular bas
Punjab (India)
sures ncing ular er for on.
Dust
barr
both
impr
basis
sures ng the & been er dule.
Impr
help
Nois
gene
and g of its/ wed/ arly.
To b
al
mpact & al an of ds has and ent.
To b
the
cont
notif
and
ame
e of d work.
Impr
prov
(Per
Equi
for
main
worl
If f
arch
the
docu
ness ed and taken ses.
Awa
be
cont
cam
shou
they
t suppres
riers and Plan
h the camp s
roved on
s.
roved planta
p to attenu
se
eration.
be complied r
be maintaine
clauses s
tract agreem
fication of M
its su
endments.
rovement req
vision of
rsonal P
ipment) to t
routine
ntenance wo
ld bank norm
found, any
haeological re
project site
umented.
areness camp
organized
tract agreem
p site Condo
uld be filled a
y are empty.
ssion /
ntations in
sites to be
priority
DncpiBd
ation will
uate the
pollution
Gdb
egularly.
ed as per
setup in
ent & EIA
MoEF 2006
ubsequent
Spowdwir
quired for
PPEs
Protective
he labour
and
ork as per
ms.
SSapwp
such an
emains in
shall be
ps should
as per
ment. At
om Boxes
as soon as
70
Dust barriernot found camp site. A vplants were in the name oBelt. Requiredone immedi
Green Belt developed onbasis.
Sewage trplant wasoperational. water was dumped in opwithin site. immediate mrequired.
Safety Safety shoes,and Goggleperson workwelding) tprovided.
rs were in the very few planted of Green e to be ately.
to be n priority
reatment s not
Waste directly
pen area
measures
helmets, , Jackets es (for ing with to be
TNM
OPRC World Monthly Progre
5.3
SI. No.
1 Sw
2 S
3 C
4 ADH
5 CC
6 Ap
7 F
5.4
SI. No.
1 Soma
2 Sane
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
StatusofGe
Ta
Facilities
Separate Driwater facility
Security
Creche Facilit
Availability Doctor / MeHelp
Cooking faciCanteen
Awareness posters
First Aid Facil
StatusofPh
T
Indicators
olid waste anagement
nitation etwork
OGY AND MENT LTD.
angrur Mansa Batly 2016)
eneralfacilit
able 5‐2 : Sta
s
nking Providrinkby co
Provicamp
ty Not R
of edical
Detafacilitavaila
lities/ Proviin Caother
Awarrelatecampposte
ity First both first store
hysicalEnvir
Table 5‐3 : St
Stat
Not Mainta
Provide
thinda Network in
tiesatContr
atus of Gener
Stat
ided. Treatmking water haontractor at p
ided. Gated p sites is prov
Required.
ils of nties/ local able.
ided. Meal faamp site for r camp reside
reness posteed to occupp site. Road sers need to be
Aid boxes camp sites. aid room wae room.
ronmentalA
tatus of Physi
tus Re
ained Cont
ed Cont
Punjab (India)
ractorCamp
al facilities at
tus
ment facility as been provproject site.
entry for vided.
earby Meddoctors
acility is provproject staff ents.
ers are instapation safetysafety awaree provided.
are providedAt old campas being use
AspectsonS
ical Environm
sponsibility
tractor
tractor
pSite
t Contractor
for vided
Regulasystem
both Providpoint regula
The operafacilitylabou
dical are
Agreehospitof thmedic
vided and
‐
alled y at eness
More installof the
d at p site ed as
First APlacembox mshall used f
Site
mental Aspect
A
Segregatiomaintainepit was usUrgent att
‐
Camp Site
Action
ar Maintenam to be done
ding a Securiof the Campar basis.
camp site tors and drivy is not requr is employed
ement may betal or medicae Emergenccal requireme
number of aled and on see project road
Aid box to ment and acmay be improbe maintainefor any other
ts on Site
Action requir
on yard ed. Organic sed as dump atention is req
71
n / Remarks
nce of filter.
ity Guard at p to be main
has the favers only, thuired. Otherd.
e done with tal authority focy services aents.
wareness poselected junctd.
be managedccessibility ooved. Dispened and shoupurposes.
red
was not composting area. quired.
rs and RO
the entry ntained on
acility for hus Creche rwise local
he nearest or facilities and other
sters to be tion points
d properly. f First aid sary room uld not be
Remarks
‐
‐
TNM
OPRC World Monthly Progre
3 Wtre
4 StoPla
1.
2.
3.
4.
5.
5 Du1. 2. 3.
6 Sa
7 Oi
8 PPLa
9 DGSta
10 Plaanca
M TECHNOLOMANAGEM
Bank Project for Sess Report No 22 (Ju
aste water eatment facil
ockyard anning
Solid Platfor
Segregation Materials
Layout of Ya
Ground Leveling
Covering vehicles fine parttransportati
ust SuppressioHaul Road Stock Yard Open Area Camp Site
fety Equipme
l & Grease Tr
PEs provided tbour
G sets adequaack
antation insidnd around themp site
OGY AND MENT LTD.
angrur Mansa Batly 2016)
ity Providebut notfunctio
rms ProvideDG setother installain camp s
of ‐
ard Approvlayout is awfrom cl
Mainta
of for
ticle on
‐
on
in
Not mainta
ent Partiallmainta
rap Provide
to Partiallmainta
ate Provide
de e
Not provide
thinda Network in
ed t onal.
Cont
ed for ts and
ations both
sites.
Cont
Cont
ved plan
waited lient.
Cont
ained Cont
Cont
ained Cont
ly ained.
Cont
ed. Cont
ly ained.
Cont
ed Cont
ed. Cont
Punjab (India)
tractor
tractor
tractor
tractor
tractor
tractor
tractor
tractor
tractor
tractor
tractor
tractor
To be mfunctionalwaste waprimary should bePPCB requ
To be Mai
‐
Should be
‐
Dust barripriority. water spridone on re
General sabe improv
To be clregularly.
ImprovemRequire program fbeen prov
‐
New Saplhealthy / available be re‐planpossible, a
made operal. Proper trater to be water teste placed onuirements.
intained regu
e maintained
iers shall be in
inkling shouldegular interva
afety measurved.
leaned and
ment requiredTraining & for use of PPvided to labou
lings to be pgrowing / mfrom nearbynted in new cas immediate
72
ational and reatment of done and
ting facility nsite as per
ularly.
regularly.
nstalled on
d also be als.
es needs to
maintained
d. Awareness
PE which has urs.
planted and mature trees y areas may camp site, if e measure.
‐
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
5.5 Status
Activities
Camp Layout Plan
Consent to Establishment (CTE) for Hot Mix Plant (Apollo)
Consent to Operation (CTO)
for Hot Mix Plant (Apollo)
NOC for change of Land Use
Permission for Withdrawal of Ground Water for Construction
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
ofStatuaryCle
StatutoryAuthority
PWD, Sang
Punjab StaPollution Con
Board
) Punjab StaPollution
Control Boa
District TowPlanner, Bath
Central GroWater Boa
Bathinda Network in P
earancesApplic
Table 5‐4
y y
WheRequi
rur Befo
Constru
ate ntrol
BefoConstru
ate n ard
BefoConstru
wn hinda
BefoConstru
und ard
BefoExtrac
Punjab (India)
cableforproje
4 : Status of Statu
en ired
Camp‐1: Khia
ore uction
Appliedcamp seweraletter PIPL/OPdated 3
ore uction
AppliedPIPL/OP14/010 09.2013
ore uction
AppliedPIPL/OP14/ 24.10.2
ore uction
Applied16.04.2
ore ction
AppliedOPRC/P14/007 No.908Mansa.
ctandCampsi
uary Clearances A
Applied
ala Khurd Camp a
d with reviselayout plan witge system vid
nPRC/186/ 20131.07.2013
d vide letter nPRC/PWD/ 201
dated 23
d vide letter nPRC/ PWD /201
027 date2013
d dated 2013
d vide PIPPWD/201/2013‐
Receivin3 at DC offic
73
te
Applicable for pr
Status
Obtain
at Km. 64+050; 3
ed th de o. 13
‐
o. 3‐23.
Obtained ZO/BTI/201304.10.2013
o. 3‐ed
Obtained ZO/BTI/WPCdated 19.1/APC/2013/19.12.2013
Obtained 997DTP(B)/517.04.2013
L/
ng ce
In process (letter no2015) has office Man16341) date
3
roject and Camp
ed / Approved
3KM LHS
vide NOC 3/ NOC ‐110 da
vide NOC C/ 2013 /F‐112.2013 & ZO// F‐ 148 da
vide letter 55 da
Gentle remin. PIPL/OPRC/6been given to nsa (receiving ed on 30.07.2015
p site
Expiry Da
NA
No. ted
03.10.20
No. 164 /BTI ted
30.06.20
no. ted NA
der 18/ DC no.
5
NA
ate Rem
14 Renewrequired abeen es
16 Not in udemo
Extractiofrom localbore wellpaymen
marks
wal is not as plant has tablished
use; to be obilized
n of water lly available l owner on nt mode.
TN
OM
C
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Installation of Generators
Explosive License for
Storing Fuel Oil, Lubricants,
Diesel, etc. at Construction
Camp
Camp‐2: Khiala K
Camp Layout Plan
Consent to Establishment
(CTE) for Hot Mix
Plant (Linhoff)
Consent to Operation (CTO)
for Hot Mix Plant (Linhoff)
Storage Handling and Transport of Hazardous Materials
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Punjab ElectricityBoard
Chief Cont.Explosive
Kalan Camp at K
PWD, Sang
Punjab StaPollution Con
Board
) Punjab Sta
Pollution ConBoard
Punjab StaPollution Con
Board
Bathinda Network in P
y Befo
Installa
. of es
BefoInstalla
M. 61+600; 0.3K
rur Befo
Constru
ate ntrol
BefoConstru
ate ntrol
BefoConstru
ate ntrol
BefoConstru
Punjab (India)
ore ation
Applied2014 ‐ 123.04.2
ore ation
Applied2014‐ 122.04.2
KM RHS
ore uction
Appliedlayout seweraletter n/2014 d
ore uction
Applied10830929.03.1
ore uction
Applied130825dated 1
ore uction
AppliedID no. 111.06.2
d PIPL/ADMIN15/078 dated 2015
d PIPL/ADMIN15/018 dated 2015
d revised camplan wit
ge system vidno. PIPL/OPRC/40dated 09.09.2014
d ID Nos. 96 dated 1014
d ID Nos. 53 and 130818816.05.1014
d application 1421038 dated 2014
74
N/ Obtained vdated 27.04
N/ Obtained P/NC/PB/14dated 22.04
mp th de 08 4
‐
Obtained vidZO/BTI/2014dated 17.04
Obtained vidZO/BTI/WPCZO/BTI/APC21.05.2014
Obtained HWM/MMSdated 28.08
4
ide memo 00074.2015
vide 4/4153 (P31704.2015
de NOC No. 4/ NOC ‐123 4.2014
de NOC No. C/ 2014/F‐180 /2014 /F‐163 da
vide letter S‐2014/16826448.2014
760 10.04.20
no. 010) 31.12.20
NA
16.04.20
& ted
30.06.20
no. 27.08.20
17
17
15 Renew
required abeen es
19 Indus
R14MNS
15 Applied fo
(Applic3467
wal is not as plant has tablished
stry ID S1083075
or renewal cation ID 7370)
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Installation of Generators
Permission for Withdrawal of Ground Water for Construction
Registration of Vehicles & RoadEquipments
PUC of all Vehicles/ Machinery
Labour license
Labour License
Sand Mining
Quarry for Aggregates
Debris Disposal Sites
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Punjab ElectricityBoard
Central GroWater Boa
Motor VehiDepartme
Motor VehiDepartme
Labour Commission
Sangrur
Labour Commission
Bathinda
Dept. of Geo.Mining
Dept. of Geo.Mining
Gram Panch
Bathinda Network in P
y Befo
installa
und ard
BefoExtrac
icle nt
Befoconstru
icle nt
Befooperat
ner ‐
ner, a
‐
. And Befooperat
. And Befooperat
ayat Befo
Operat
Punjab (India)
ore ation
Applied2014‐1523.04.2
ore ction
AppliedOPRC/P14/007 No.908Mansa.
ore uction
Applied
ore ional
Applied
Appliedletter PIPL/AD15/39 d
Appliedvide PIPL/AD15/40 d
ore ional
‐
ore ional
‐
ore tional
AppliedPIPL/OPdated 0
d PIPL/ADMIN5/078 date2015
d vide PIPPWD/201/2013‐
Receivin4 at DC offic
Other Clear
d various date
d various date
d for renewal vidn
DMIN/2014‐ dated 15.12.2014
d for renewed letter n
DMIN/2014‐ dated 15.12. 201
d vide letter nPRC/ 101/20102.05.2015
75
N/ ed
Obtained vid000761 date
L/
ng ce
In process (letter no2015) has office Man16341) date
rances
Obtained
Various date
de o.
4
Obtained v563 dated labours
o.
4
Obtained vi20/2013 da50 labours
‐
‐
o. 13
5
de memo ed 27.04.2015
Gentle remin. PIPL/OPRC/6been given to nsa (receiving ed on 30.07.2015
es
ide License no.‐19.02.2013 for 1
ide License no. ‐ted 06.05.2013
10.04.20
der 18/ DC no.
5
NA
Various da
Various da
‐ L‐100 31.12.20
‐ L‐for
NA
NA
NA
17
Extractiofrom localbore wellpaymen
ates Engaged
pro
ates Engaged
pro
16 Applied fo
Not Appprocur
existing sa
Not Appprocur
existing sa
Ch. 6+300road. Not debris be
n of water lly available l owner on nt mode.
d for OPRC oject
d for OPRC oject
or renewal.
‐
plicable as red from and quarry
plicable as red from and quarry
0 R/S on S‐2 required as ing reused.
TN
OM
T
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Canal Water Permission
Forest Clearance
5.6 Future
Following key iss
1. Air pollu
2. Air pollu
3. Waste ha
4. Safety pr
These are the ke
issues may be re
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
IrrigationDepartme
e Forest
Departme
ekeyissuesas
sues may arise du
tion from Hot M
tion from road c
andling and man
ractices during ro
ey potential issue
solved and mana
Bathinda Network in P
n nt
‐
nt Befo
Operat
reviewedfrom
uring future cons
ix Plant operatio
onstruction work
nagement during
oad construction
es that may arise
aged if good envi
Punjab (India)
Applieddated 0
ore tional
Various
mtheworkspro
struction work as
on.
k.
road constructio
n.
during further ro
ironmental pract
d for renewal 06.10.2015
s dates for differe
ogrammeandw
s there may be ch
on.
oad construction
tices and environ
76
Renewed vreceipt no01.10.2015
ent Sections
workmethod
hange in scenario
n work and chang
nmental managem
6
vide serial no. o. 110485 da
o in the working
ge in working me
ment plan to be
Z, ted 31.03.20
NA
method and wor
ethod and workin
implemented.
16 Applied fo
Applicatioclearances
by PSan
rking program.
ng program. How
or renewal
on for forest s submitted PWD, ngrur
wever, these
TN
OM
6
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6 ROADSA
6.1 Introd
This se
Safe an
practic
The Sec
by the
6.2 Crash
Crash a
Contra
The pr
Month
Table 6
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
AFETYAND
duction
ction presents th
nd efficient netw
es in accordance
ction also contai
World Bank Team
Records
analysis is presen
ctor. The fatal cr
incipal data sour
ly Progress Repo
6‐1 gives the sna
Bathinda Network in P
TRAFFICMA
he road safety pe
work are the prim
e with the provisi
ns recommendat
m Leader.
nted by using cra
rashes are verifie
rce for this repo
orts (MPRs). The d
pshot of total cra
Punjab (India)
ANAGEMEN
erformance of th
me aims of the O
ions of the contra
tions based on c
ash records from
ed with the police
ort was the Road
data format is pr
ashes on the OPR
T
e network in term
OPRC project. MC
act ‐ to ensure th
ontinuous road s
m the years 2013
e records for auth
d Crash database
rogressively bein
RC network year
77
ms of crash recor
C is making all ef
hat the Contracto
safety assessmen
3 to present (July
henticity.
e maintained by
g improved to pr
wise.
7
rds and findings
fforts with the he
or builds and ope
nt being carried o
y 2016). The info
M/s PIPL and su
rovide meaningfu
of the road safet
elp standards, sp
erates safer road
out by the Monit
ormation is extra
ubmitted to Mon
ul details.
ty audit.
pecifications, gui
s.
toring Consultant
acted from the M
nitoring Consulta
delines and
t as desired
MPRs of the
ant through
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
Table 6
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Sr. No. Road
1
2
3
4
5
6
Total
6‐2 gives the sna
Sr. No. Road
1
2
3
4
5
6
Total
Bathinda Network in P
d Name MaN
S1
S2
S3
S4
S5
B8
pshot of total fat
d Name MaN
S1
S2
S3
S4
S5
B8
Punjab (India)
Table 6‐1: OPRC
ar. 2013 to Nov. 2013
5
59
3
2
6
6
81
talities on the OP
Table 6‐2: OPR
Tota
ar. 2013 to ov. 2013
2
13
0
0
3
5
23
C Network Crash
Dec. 2013 to Nov.2014
0
78
3
3
1
1
86
PRC network yea
RC Network Fatal
al Fatalities
Dec. 2013 to Nov.2014
0
9
0
1
0
5
15
78
h Details (Up To J
Dec. 2014 toNov. 2015
7
71
9
4
1
6
98
r wise.
lities Details (Up
on Network
Dec. 2014 toNov. 2015
1
7
0
0
0
0
8
8
July 2016)
o Dec. 201Nov. 20
7
50
2
1
2
2
64
p to July 2016)
k
o Dec. 201Nov. 20
0
15
1
0
2
0
18
15 to 016
Total
2
3
15 to 016
To
4
Crashes
19
258
17
10
10
15
329
otal
3
44
1
1
5
10
64
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6.3 Crash
The aim of
first report
history, the
There w
There w
S2 sect
65% of
Figure
11.
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Analysis
this crash analys
ted by the contra
e identification o
were 329 crashes
were 64 fatalities
tion accounted fo
f crashes were at
6‐1 to Figure 6‐1
3
106.13
3
44
S1 S2
Length
Section Le
Bathinda Network in P
sis is to examine
actor. There are
f any trend will a
s reported from
s from March 20
or most crashes (
tributed to spee
11 depict various
Figure 6‐1: O
7.29 24.971
S3 S4
h v Fataliti
ength (L) Fataliti
Punjab (India)
the crash history
many factors w
assist in developi
March 2013 to Ju
13 to July 2016.
(258) and most fa
ding and overtak
attributes of cra
OPRC Network –
25.34 281 5
S5
ies
es (F)
y and trends in th
hich contribute t
ng strategies to d
uly 2016.
atalities (44).
king. 35% of cras
ash statistics.
– Section Length
8.65 10
B8
79
he occurrence of
to the occurrenc
decrease the num
hes were single v
v Number of Fat
0.08
S1
9
f these crashes si
ce of road crashe
mber of road cra
vehicle – leaving
talities & Fatality
0.12
0.04
S2 S3
Fatality
Fatality Ra
nce April 2013 w
es. Although it’s a
shes.
the carriageway
y Rates
0.01
0.06
S4 S5
y Rates
ate/Year (F)
when the crash re
a very short peri
y.
0.100.09
B8 AVERAG
ecords were
iod of crash
E
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
19 1
S1
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
258
111.3
106.13
1 S2
Length
Total Crashes (C)
Bathinda Network in P
Figure 6‐2
17 107.29 24.97
S3 S4
v Crashes
) Section Lengt
Punjab (India)
: OPRC Network
10 1525.34 28.6
S5 B8
h (L)
k – Section Lengt
65
80
h v Number of C
0.49
0.7
S1 S
0
Crashes & Crash R
710.68
2 S3
Crash R
Crash Rate
Rates
0.12 0.12
S4 S5
Rates
e/year(R)
0.15
0.47
B8 AVERA
7
AGE
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6.4 Trend
Total 8
There w
Total n
The tot
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
inCrashes
8 crashes were re
were 2 fatal cras
umber of fataliti
tal number of cra
Bathinda Network in P
Figure
eported on the ne
hes, resulting in
es in the 4th Year
ashes this year (6
T
Punjab (India)
6‐3: OPRC Netw
etwork for report
2 fatalities (S2 Ro
r stands at 18 wh
64) is down by 10
329
2
TOTAL SPE
Speedi
work – Speeding &
ting month of Ju
oad).
hich is more than
0, compared to th
213
6
EDING PERC
ng & Align
81
& Alignment as F
ly 2016 (All on S2
n twice compared
he number of cra
5
115
CENT RUN‐O
nment as F
1
Factors in Crashe
2 Road)
d to total fatalitie
ashes same time
5
35
OFF PERCEN
Factors
es
es last year (8).
previous year (7
NT
74).
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
23
1ST YEAR
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
15
2ND YEA
Toatl Fata
Bathinda Network in P
F
8
R 3RD YE
alities ‐ Yea
135
1
Punjab (India)
Figure 6‐4: OPRC
Figure 6
1
EAR 4TH
ar Wise
23
3950
11
2332
2 3 4
Total Cra
C Network – OPR
6‐5 : OPRC Netw
18
YEAR
059 63
6
240
495
5 6
shes This Y
Third Year
82
RC Network – Fat
work – Crash Tren
13
1
S2 Se
6874
81
5664
7 8 9
Year v Last
Fourth Year
2
tality Trend
nd
9
2
ection Fat
8793
98
10 11 12
t Year
7
3
alities ‐ Ye
15
4
ear Wise
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6.5 RoadS
Road s
treatm
work‐s
Safety
6.6 RoadS
Head o
establis
The ma
(mobile
The mo
and un
the inte
The gre
While t
urgent
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Cras
Fata
SafetyAudit
afety audit is a p
ent approaches
ites, is carried o
Audits, IRC Code
SafetyAuditFin
on crashes, crash
sh possible trend
ain behavioural f
e phone use whil
ost significant ris
nsafe (helmet) dr
ersections, inade
eatest risks are fo
the total numbe
speed managem
Bathinda Network in P
Dec Jan
shes 5 6
lities 0 0
powerful tool for
such as black sp
ut by MC along
es and in accorda
ndings
hing into slow m
ds in road user be
factor continues
le driving), drivin
sks relate to unsa
rivers/passengers
equate clear zone
or pedestrians, c
er of crashes hav
ment measures.
Punjab (India)
Table 6‐3: OP
Crashes
n Feb Mar
12 9
10 1
r improving the s
pot treatments w
with monthly ne
nce with the prin
moving vehicle an
ehaviours and de
to be excessive
ng while intoxicat
afe overtaking op
s, stray animals,
es, hazards in cle
yclists and vehic
ve come down, t
PRC Network – S
s 4th Year (Dec. 2
Apr May Jun
8 9 7
2 3 0
safety of the roa
which is also part
etwork performa
nciples of ‘Safe Sy
nd vehicle leavin
eficiencies in road
speed with resp
ted or under the
pportunities, illeg
poor road work
ear zones, inadeq
les involved in ov
he number of fa
83
Summary of Cras
2015 to Nov. 201
ne July Aug
8
2
ad network in a p
of this contract
ance audit in acc
ystem Approach
ng the carriagew
d safety.
pect to prevailing
influence of drug
gal parking, un‐ro
k practices, poor
quate delineation
vertaking manoe
atalities on OPRC
3
sh Statistics
16)
Sep Oct
proactive manne
. Road Safety Au
cordance with Au
’.
ay are predomin
g conditions, lack
gs.
oadworthy and o
facilities for vuln
n and signposting
euvres
C Network have r
Nov
64
18
er. It complemen
udit which also in
ustralia’s Guide t
nantly reflected
k of driver conce
overloaded vehic
nerable road use
g.
risen sharply fro
ts more tradition
ncludes road safe
to Road Safety P
in crashes. MC h
entration, driver
les, unrestrained
ers, lack of traffic
m 8 to 18, callin
nal reactive
ety audit of
Part 6: Road
has tried to
inattention
d (seat belt)
c control at
ng for some
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6.7 RoadS
The mo
Withou
Police t
Preven
Speed
Improv
Improv
To sup
Contra
continu
Employ
Institut
Safety
6.8 WayF
MC has
MC has
Keepin
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
SafetyStrategie
ost important st
ut this it will be d
to help educate d
nt driving under t
Zoning and Traff
vement of junctio
vement of curve
port the safe roa
ctors to ensure c
uously improve im
y Smart Technolo
tional arrangeme
Engineers.
orward
s conducted train
s introduced stric
g in view the fac
Bathinda Network in P
es
trategy to reduce
difficult to lower
drivers to comply
he influence of a
fic Calming Meas
ons and intersect
delineation with
ad system concep
compliance to IR
mplementation.
ogy – VMS, Speed
ents for technica
ning sessions for
ct compliance of
tors and issues id
Punjab (India)
e crashes on OP
crash rates as th
y with the rules,
alcohol and enfor
ures on roads pa
tion delineation a
enhanced signag
pt, a strategic app
RC SP ‐55, quality
d Camera, Social
l skills developm
the contractor o
traffic control an
dentified in Secti
PRC network is t
e majority of the
as well as enforc
rcement of seatb
assing through to
and signposting.
ge and crash bar
proach is needed
y of implementat
Media to achiev
ment by holding w
on ‘Safe System A
nd TMP at work s
ion 6.7, MC will a
84
owards speed co
e crashes are due
cement.
belt and helmet u
owns and villages
riers.
d to make roadsid
tion in and aroun
ve sustainable ch
workshops, traini
Approach’, ‘Speed
sites and use of p
assist the client in
4
ontrol through e
e to excessive spe
use.
s.
de environment
nd road worksite
ange in road safe
ing courses for st
d Zoning Guidelin
personal protect
n developing the
enforcement and
eed.
more forgiving.
es by training the
ety.
takeholders ‐ Co
nes ‘and ‘Enhance
ion equipment (P
eir road safety str
d/or engineering
eir road safety e
ntractor, Counci
ed Curve Delinea
PPE) for workers
rategies in Punjab
g measures.
ngineers to
ls and Road
ation’.
.
b.
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
6.9 Distrib
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
butionoffatalc
Bathinda Network in P
crashesintheO
Punjab (India)
OPRCnetwork
Figure 6‐6
6 : Fatal Crash Lo
85
cations at Sectio
5
on S1
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figure 6‐7
7 : Fatal Crash Lo
86
cations at Sectio
6
on S2
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figure 6‐8
8 : Fatal Crash Lo
87
cations at Sectio
7
on S3
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figure 6‐9
9 : Fatal Crash Lo
88
cations at Sectio
8
on S4
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figure 6‐10
0 : Fatal Crash Lo
89
ocations at Sectio
9
on S5
TN
OM
NM TECHNOLMANAGEM
OPRC World Bank ProjMonthly Progress Report N
LOGY AND MENT LTD.
ect for Sangrur Mansa No 22 (July 2016)
Bathinda Network in PPunjab (India)
Figure 6‐11
1 : Fatal Crash Lo
90
ocations at Sectio
0
on B8
TNM TM
OPRC WorlMonthly Pro
7 CO
7.1
7.1
SI. No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
7.1
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
ONTRACT
Contract’s
1.1 KeySta
Table 7
Road Mana
Road AssetManager
Senior Site
Site Engine
Site Engine
ConformanUnit
Material En
Contract Fi
Plant & Equ
1.2 KeySta
SI. No.
1. D(H
2. MSy
3. BrEn
4. RoMCo
5. EnSp
6. So
Y AND NT LTD.
or Sangrur Mansa (July 2016)
TOR’SSTA
sStaffaspe
affofLead
‐1: Contract
Position
ager
t Manager/R
Engineer
eer (Construc
eer (Mainten
nce Managem
ngineer
nancial Man
uipment Eng
affPresent
Table 7‐2
Position
esign EngineHighways)
Management ystem/IT Ma
ridge ngineer/Con
oad Safety Management/onsultant
nvironment pecialist
ocial Speciali
a Bathinda Netwo
AFFAND
erContract
Contractor
or’s Key Staf
N
isk
ction)
ance)
ment
nager
gineer
tatSiteinJu
2: Key Staff o
n E
eer
nager
sultant
/Design
ist
ork in Punjab (Ind
DCONSTR
tAgreemen
rPresentat
ff as per Con
Numbers
1 M
1 Ja
1 Pu
2 YoPa
Ch
2 Pa
Ra
1 Se
1 Sa
1 Pr
1 R
uly2016
of Profession
New Profengineering C
Staf
Ziauddin A
Gopal K
Rashid N
Dhanraj N
Manoj K
Minati S
dia)
RUCTION
nt
tSiteinthe
ntract Agree
Name of Pe
Mukesh Kuma
askarn Singh
ushpraj Singh
ogender Natandey
hinu Singla
ankaj Kumar
akesh Kumar
ewak Singh S
anjay Pandey
raveen Kaha
K Singh
nal Engineer
essional Consultant ff
A Khan
hatri
Najfi
Nagdev
umar
Sinha
EQUIPM
emonthofJ
ment and Pr
erson M
ar
A
h
h
r
r
Sidhu
y
r
ing Consulta
MonitoriR
The MonitConsultantthe Contrapresence oaddress vasafety and vide TNM LTNM/OPRCdated 25 Juof the PEC have met tdiscuss the
MENTS
July2016
resent at Site
Monitoring CRema
Full T
Acting as Billials
Full T
Full T
Full T
Full T
Full T
Full T
Full T
Full T
Full T
ant
ing Consultaemarks
oring t has notifiedactor to ensuof PEC team trious road other issuesLetter numbC/505/2016 uly 2016. Mateam membthe MC to e issues.
91
e
Consultant arks
Time
ng Engineer o
Time
Time
Time
Time
Time
Time
Time
Time
Time
ant
d ure to
s er
any bers
SN
TNM TM
OPRC WorlMonthly Pro
7.2
Sl. No.
Eq
1 Hot M
2 WMM
3 Paver with se(Bitum
4 Hydrau
5 Backho
6 Motor
7 Loader
8 Paver for WM
9 Contrarespon
10 ContraInspecand Di
11 Vibrato
12 Pneum
13 Tipper
14 Water
15 Pavem
16 Bitume
17 Power
18 Falling(Pavemtesting
19 CalibraProfilo
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
Contracto
Table 7
quipment TyCharacteris
ix Plant (Bat
Mixing Plan
Finisher Hydensor controminous Work
ulic Excavato
oes
r Grader
r
Finisher MecMM Work
actor’s patronse vehicles
actor’s generction Vehicleisplacement
ory Rollers
matic Tyre Ro
r/Trucks
r Tanker
ment Marking
en Pressure
r Broom
g Weight Defment deflectg)
ated Roughnometer
Y AND NT LTD.
or Sangrur Mansa (July 2016)
or’sConstru
7‐3: Construc
ype and stics
ch type)
nt
drostatic ol s)
ors
chanical
l and
ral s (with GPS meters)
oller
g Plant
Distributor
flectometer ion
ness
a Bathinda Netwo
uctionEqui
ction Equipm
As PeAg
MinimumCapacity
100 TPH
60 TPH
100 TPH
1.0 m³ bucket
0.5 m³ bucket
150 kw
1.0 m³ bucket
100 TPH
8‐10 T
8‐10 T
5.5 m³
6 m³
ork in Punjab (Ind
ipment’sJu
ment as per C
er Contract reement
m y
MinimNumb
H 1
1
H 2
2
2
1
2
H 1
2
3
3
2
15
3
1
1
2
1
1
dia)
uly2016
Contract Agr
Pr
mum bers
Capa
128 T& 20TP
250 T
600 T
0.9‐1m
0.5 mbuck
120 m
1.61.7&
m
250T
8‐10
15M
5 14‐24
1200
reement/ Pr
resent at Site
city Numb
TPH00 H
1 ea
TPH 1
TPH 2
1.0 3
3
m³ ket
3
m3/h 3
6‐&2.4 3
5
TPH 1
2
2
0 T 4
MT 1
4 m3 33
00L 4
1
3
2
1
1
resent at Site
e
bers
ach
3
Submarkma
a
92
e
Remarks
let the pavemking work anade the in‐hoarrangement
ment d also ouse ts
TNM TM
OPRC WorlMonthly Pro
7.3
SI No.
1
2
3
5
6
7
8
9
10
11
7.4
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
Contracto
P
Road Mana
CMU, Team
Field Engin
HR& Adm.
Road Asset
Plant & Eq
Contract Fi
Road Safet
Billing/QS
Quality Con
Reviewof
Monitoringthe Contrareplaced ssubmitted credentialsnot in accobservatio
In Contracworking asIt is very Manager aConsultant
Y AND NT LTD.
or Sangrur Mansa (July 2016)
or’sStaffPr
Table 7‐4
Position
ager
m Leader
neer
t Manager
uipment Eng
inancial Man
ty officer
ntrol In‐char
fContracto
g Consultantact Agreemeome of its eto the Mons and has foucordance wons were sub
ctor’s staff ts Asset Manacritical for as per the Ct of this requ
a Bathinda Netwo
resent–July
4 : Contact N
Muk
S.S.
Pank
Parv
Jask
gineer R.K.S
nager Parv
Ram
Jask
rge Sanj
or’sStaff
t has undertnt and actuaengineers fronitoring Consund that the
with the critbmitted to th
there is no ager and Billsuccess of tontract Agreuirement vid
ork in Punjab (Ind
y2016
No. of Contra
Name of Pe
kesh Kumar
Sidhu
kaj Kumar
veen Kahar
karan Singh
Singh
veen Kahar
mesh Patil
karan Singh
jay Pandey
taken a revieal present at om the site. sultant for r qualificationteria, contaihe Employer.
permanent ing Engineerthis project eement. Thee letter TNM
dia)
actor’s Staff
rson
ew of the Cthe site in thThe CVs of
review. Monns and experned in the
Asset Manar which affecthat the co
e ContractorM/OPRC/505/
Present at S
Contact
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
8288032
ontractor’s he month of the newly anitoring Conrience of thecontract.
ager, one enct the progreontractor aphas been no/2016 dated
ite
No.
760
757
763
780
796
782
780
778
796
753
Key Staff reJuly 2016. C
appointed ennsultant has e replaced enMonitoring
ngineer has ess of Asset Mppoints a fuotified by th 25 July 2016
93
Remarks
quired as peContractor hangineers werreviewed thngineers werConsultant
dual chargeManagemenull time Assehe Monitorin6.
er as re he re ’s
es nt. et ng
TNM TM
OPRC WorlMonthly Pro
8 PA
Thi
the
cur
Con
As
Pav
rec
Con
8.1 D
8.1
8.2 Su
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
AYMENTS
s Chapter de
e Contractor'
rrent descrip
ntractor’s Pa
per the Gen
vement Roug
ommends to
ntractor:
i.
ii.
Disputesand
1.1 Claim
There is a
PIPL), aris
detailed i
hearings s
and 16 Ju
ummaryM
The Summ
during the
Y AND NT LTD.
or Sangrur Mansa (July 2016)
S&DISPU
escribes the
's next paym
tion of the C
ayment – Mo
neral Condit
ghness and P
o the Emplo
Provisional
CONFORMA
Contractor h
to process t
the absence
Monitoring
requirement
has failed t
software av
withheld.
dClaims
an Arbitratio
sing out price
n PCC of the
so far. . The
ly 2016. The
an‐Hourso
mary of the
e Month of J
a Bathinda Netwo
UTES
recommend
ment corresp
Claims submi
onth of July,
tions of the
Pavement De
oyer to con
payment fo
ANCES.
has procured
he collected
e of the req
Consultant
ts. Despite
o the softw
vailable at th
on Case betw
e adjustmen
e contract. T
Arbitral Trib
next hearing
ofMonitorin
inputs of t
uly 2016 is g
ork in Punjab (Ind
dation of the
onding to th
itted by the C
2016
Contract A
eflections ha
sider any of
or the mon
d the profilo
d roughness d
quired softw
and therefo
Monitoring
ware availabl
he OPRC site
ween Claima
t formula, co
The case is w
bunal heard
g is schedule
ngConsulta
the Monitor
given in Table
dia)
Monitoring
he Month of
Contractor t
Agreement a
ave yet to be
f the follow
nth of July
ometer at th
data has not
ware, the IR
ore cannot b
Consultant
e at the pro
e, it is recom
ant (Chief En
ontained in t
with the Arbi
the argumen
ed to be held
antTeam
ing Consulta
e 8.1 and 8.2
Consultant
July 2016. T
o the Client.
nd consider
e collected, t
wing alternat
2016 corre
e OPRC proj
t been arran
I data could
be accepted
repeated re
oject site. U
mmended th
ngineer, PW
the clause 4
itration Tribu
nts of the re
d in August 2
ant’s team i
2.
regarding th
This Chapter
ring that the
he Monitorin
tives for pay
esponding t
ject site but
ged at the p
d not be ve
d to fulfil th
eminders, th
Until the tim
hat some am
WD) and Resp
48.1 of GCC a
unal. There
spondent’s c
2016.
n terms of
94
he approval o
also include
e data of th
ng Consultan
yment to th
to 100 NON
the softwar
project site. I
erified by th
e contractu
he Contracto
e, makes th
mount may b
pondent (M/
and as furthe
have been 1
counsel on 1
man – hou
of
es
he
nt
he
N‐
re
In
he
al
or
he
be
/s
er
14
15
rs
TNM TM
OPRC WorlMonthly Pro
Sl. No.
1
2
3
4
5
6
Sl. No.
1
2
3
4
5
6
7
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
Employee N
Yogendra B
‐
Harpreet Si
Dr. Sohan S
Dr. Vinay M
Dr. Asha Sh
Ta
Employee N
Deepak Kum
Varinder Si
Happy Sing
Neeru Bala
Rohit Jinda
Gadi Moshe
Emilia De L
Note: Only
Y AND NT LTD.
or Sangrur Mansa (July 2016)
Table 8‐1 : M
Name
Bhatnagar
ngh
Singh Seehra
Maitri
arma
ble 8‐2 : Ma
Name D
mar P
ngh CS
gla AA
S
l H
el S
a Ossa HE
actual work
a Bathinda Netwo
Man Hours (f
De
Project MTeam Lea
OPRC OpSpecialist
Principal
PavemenSpecialist
Data Ana
Environm
an Hours (for
Designation
Project Engin
CAD Expert/LSurveyor
AM‐Accounts/Ad
Secretary/As
Head Clerk
Senior Engin
Hydraulic/DrExpert
king days are
ork in Punjab (Ind
for the mont
esignation
Manager cumader
perational t/Asset Man
Auditor
nt Design t
alyst/Statistic
mental Specia
Tota
r the month
neer
Land
dministrator
ssistant
eer
rainage
TOTAL (B
e included in
dia)
th of July 20
Man HourHom
m 1
ager
1
cian
alist
al (A)
of July 2016
Man HoIn Hom
4
16
19
20
3
B) 6
man hours,
016) – Key Ex
rs/Days In me Office
144/18
‐
152/19
‐
‐
16/2
312
6) – Non Key
ours/Days me Office
40/5
68/21
92/24
00/25
32/4
‐
‐
632
Holidays ar
xperts
Man Hours/DaysOn Field
64/8
‐
56/7
‐
40/5
‐
160
Experts
Man Hours/DaOn Field
160/20
40/5
8/1
‐
‐
‐
‐
208
re not consid
95
s Total MaHours
208
‐
208
‐
40
16
472
ys d
TotalMan Hours
200
208
200
200
32
‐
‐
840
dered
an
l
s
TNM TM
OPRC WorlMonthly Pro
9 AP
9.1
9.1
9.1
9.2
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
PPENDIX
Minuteso
1.1 Minute
The
in t
Arbi
out
argu
1.2 Minute
No d
of Ju
MECMeet
Y AND NT LTD.
or Sangrur Mansa (July 2016)
ofMeeting
esofArbitr
Arbitral Trib
he conferen
itration betw
price adjust
uments of th
esofDisput
dispute was
uly 2016
tingAgenda
a Bathinda Netwo
ralTribuna
bunal held its
nce room o
ween Claima
ment formu
e responden
teResoluti
raised and f
a
ork in Punjab (Ind
alMeeting
s 13th & 14t
f the Institu
nt (Chief En
ula, containe
nt’s counsel.
onBoard(D
forwarded to
dia)
th Meeting o
ution of eng
gineer, PWD
d in the con
DRB)Meet
o DRB so DR
on 15 & 16th
gineers, to
D) and Respo
tract. The A
ing
B Meeting w
h July, 2016 i
deliberate o
ondent (M/s
rbitral Tribu
was not held
96
in Chandigar
on matter o
PIPL), arisin
nal heard th
in the mont
rh
of
ng
he
th
TNM TM
OPRC WorlMonthly Pro
9.3
Sl. No.
Di
1 2
2 4
3 5
4 5
5 5
6 5/
7 5
8 5
9 8
10 10
11 12
12 12
13 12
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
Correspon
spatched Date
2/7/2016
4/7/2016
5/7/2016
5/7/2016
5/7/2016
/7 /2016
5/7/2016
5/7/2016
8/7/2016
0/7/2016
2/7/2016
2/7/2016
2/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
ndenceby
Letter
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
a Bathinda Netwo
Monitoring
Table 9‐
r No.
/474/2016
/475/2016
/476/2016
/477/2016
/478/2016
/479/2016
/480/2016
/481/2016
/482/2016
/483/2016
/484/2016
/485/2016
/486/2016
ork in Punjab (Ind
gConsultan
‐1 : Correspo
Subject
Reported CCompany S
Expenses Fand SweepProject Off
Unauthoriz
UnauthorizDumping OShoulder O
Status of MIncompletePost ConstrResult
Regarding CFor CulvertWork On S2
Crack InvesReport Of S
ImplementSide Furnit
Reported CCamp Site
Adjusted MResults Forof June 201
TMP For FuS1 Road at + 315
Road SafetyDamaged G
IPC ‐ 26
dia)
nt
ondence Sen
Crash Near Site
or Office Boyer at TNM ice
zed Activities
zed ActivitiesOf Debris On Of S1 Road
Minor e Works andruction Test
Canal Closer t Widening 2 Road
stigation S2 Road
ation of Roaure
Crash Near
Monthly Audir The Month 16
ull Closure of2 + 165 to 2
y Hazard ‐Guard Fence
nt
Sent
Team Le
y Team Le
s Team Le
s Team Le
d Team Le
Team Le
Team Le
d Team Le
Team Le
t Team Le
f
Team Le
Team Le
Team Le
By
eader
eader
eader
eader
eader
eader
eader
eader
eader
eader
eader
eader
eader
97
Sent To
Patel infra. Pvt. Ltd
Executive Engineer
Executive Engineer
Executive Engineer
Patel infra. Pvt. Ltd
Executive Engineer
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
TNM TM
OPRC WorlMonthly Pro
14 12
15 12
16 13
17 13
18 13
19 20
20 20
21 20
22 20
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
2/7/2016
2/7/2016
3/7/2016
3/7/2016
3/7/2016
0/7/2016
0/7/2016
0/7/2016
0/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
a Bathinda Netwo
/487/2016
/488/2016
/489/2016
/490/2016
/491/2016
/492/2016
/493/2016
/494/2016
/495/2016
ork in Punjab (Ind
IRI Data
MPR Obserthe Month Compliance
CV of Key P
Traffic Divefor Sangru(S1) Road aCrossing Be+ 365 to Ch
Pavement ESeehra’s Re
Variation Ofor WideninBridge at R( 5 Span 9.5Clear Span Drain CrossBhawanigaBhikhi – Ko( S2 )
Variation Ofor WideninBridge 2 SpClear & 3.6over KotlaBat RD 54 + 0250 DegreeBhawaniga–Bhikhi – K( S2 ) road
Variation Ofor WideninBridge at R6 Span 8. 7Clear ) overCrossing BaKothamir –Sabo Road
Variation Ofor WideninBridge 3 SpClear & 3.6over Kotla
dia)
rvations for April 2016 –e Report
Personnel
ersion Plan r –Sunam at Bypass etween Ch 2 h 2 + 550
Expert Dr. eport
Order No. 1 ng of ExistingD 100 + 700 50 m each ) Over Lisarasing rh – Sunam –otshamir Roa
Order No. 2 ng of Existingpan 3.50 m 60 m each c/cBeanch Cana040 (Skew ine ) rh – Sunam
Kotshamir
Order No. 3 ng of ExistingRD 20 + 600 (0 m each r Lisara Drainathinda – – Talwandi (B8 )
Order No. 4 ng of Existingpan 3.00 m 60 m each C/Branch Cana
Team Le
– Team Le
Team Le
Team Le
Team Le
g
a
–d
Team Le
g
c l n
Team Le
g (
n
Team Le
g
C al
Team Le
eader
eader Pr
eader
eader
eader
eader
eader
eader
eader
98
Patel infra. Pvt. Ltd
oject Directo( PRBDB )
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
or
TNM TM
OPRC WorlMonthly Pro
23 20
24 20
25 20
26 20
27 20
28 21
29 21
30 21
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
0/7/2016
0/7/2016
0/7/2016
0/7/2016
0/7/2016
1/7/2016
1/7/2016
1/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
TNM/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
a Bathinda Netwo
/496/2016
/497/2016
/498/2016
/499/2016
/500/2016
/501/2016
/502/2016
/503/2016
ork in Punjab (Ind
Crossing BSunam – BhKotshamir RD 73 + 450250 )
Variation ofor 4 LanninBhawanigaBhikhi – Ko( S2 ) in Bhifrom Ch 5455 + 700
Variation ofor 4 LanninBhawanigaBhikhi – Ko( S2 ) in Chefrom Ch 3940 +700
Variation ofor 4 LanninBhawanigaBhikhi ‐ Kot( S2 ) in Mafrom Ch 8486 + 060
SubmissionM/S PATEL InfrastructuFor the mo2016
Network inData Analy
Hindrance Wires of Eleat Ch 91 + 691 + 820 RHBhawanigaBhikhi – KoRoad
Canal CloseWidening WBhawanigaBhikhi – Ko( S2 ) at Ch
Submission21 for the mJune 2016
dia)
hawanigarh hikhi – Road ( S2 ) a0 ( Stew in
rder No. 5 ng Road of rh – Sunam –otshamir Roaikhi Town 4 + 030 to Ch
rder No. 6 ng Road of rh – Sunam –otshamir Roaeema Town 9 + 300 to Ch
rder No. 7 ng of rh – Sunam –tshamir Roaaur Town 4 + 030 to Ch
n of MPR of
ure Pvt. Ltd. nth of June
formation &sis.
due to Stay ectric Poles 620 and Ch HS on rh – Sunam –otshamir (S2
er for CulvertWork on rh – Sunam –otshamir Roa36 + 130
n of MPR No.month of
–
at
– d
Team Le
– d
Team Le
– ad
Team Le
Team Le
& Team Le
– )
Team Le
t
– d
Team Le
. Team Le
eader
eader
eader
eader
eader
eader
eader
eader
99
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
Executive Engineer
Patel infra. Pvt. Ltd
Executive Engineer
Executive Engineer
Executive Engineer
TNM TM
OPRC WorlMonthly Pro
31 22
32 25
33 25
34 27
35 27
36 29
37 29
38 29
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
2/7/2016
5/7/2016
5/7/2016
7/7/2016
7/7/2016
9/7/2016
9/7/2016
9/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
a Bathinda Netwo
/504/2016
/505/2016
/506/2016
/507/2016
/508/2016
/509/2016
/510/2016
/511/2016
ork in Punjab (Ind
Issue RegarPersonnel o
Various CritIssues and of MEC Me
Report SouProject DireVarious Issu
Audit Resumonth of Ju
Official Corprotocol
Invoice no.& 0042 for :1st June 20June 2016.
UnauthorizExcavation By Contractof NH 64
Cost EstimaVariation APainting of on S2 RoadCh 26 + 410over Bridgeapprox. )
dia)
rding Key of M/S PIPL
tical Pendingnotification eeting
ught By ector on ues
lts for the uly 2016
rrespondenc
TNM/0041 the period 016 to 30th
zed Activity on S2 Road ting Agency
ate for Approval for Sunam ROB
d section b/w0 ( Less Rail e 400 m
Team Le
g Team Le
Team Le
Team Le
e Team Le
Team Le
Team Le
w
Team Le
eader
eader
eader Pr
eader
eader
eader Pr
eader
eader
100
Executive Engineer
Patel infra. Pvt. Ltd
oject Directo
Patel infra. Pvt. Ltd
Patel infra. Pvt. Ltd
oject Directo
Executive Engineer
Executive Engineer
or
or
TNM TM
OPRC WorlMonthly Pro
9.4
Sl. No.
D
1 1
2 1
3 4
4 4
5 4
6 4
7 7
8 8
9 9
10 11
11 8
12 12
13 14
14 12
15 18
16 18
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
Correspon
Date On Letter
/7/2016
/7/2016
/7/2016
/7/2016
/7/2016
/7/2016
/7/2016
/7/2016
/7/2016
1/7/2016
/7/2016
2/7/2016
4/7/2016
2/7/2016
8/7/2016
8/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
ndenceRec
Letter
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
Endst. n
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
a Bathinda Netwo
ceived
Table 9‐2
r No.
/922/2016
/923/2016
/925/2016
/926/2016
/927/2016
/928/2016
/930/2016
/931/2016
/932/2016
/935/2016
o. 1103
/936/2016
/938/2016
/937/2016
/939/2016
/940/2016
ork in Punjab (Ind
: Correspond
IPC‐26
Complianc19 for the
Canal Clos
SubmissioDrawing S36+130
Site observ2016 RoadManagem
Submissioperformanreport of J
Submissiofor variatiopainting o
Reported dkm 9‐10 R
Submissiokey person
Reported c
Withheld aincomplet
Status of mworks andTest result
Regardingfor the mo
TMP for furoad at ch
Adjusted mresults for2016
Canal Clos
dia)
dence Receiv
Subject
ce of Mc’s Mmonth of Ap
ser
n of construlab Culvert a
vation 29th Jd safety and ent
n of networknce InspectioJune 2016
n of cost eston approval f ROB Sunam
damage to MHS S1 road
n of qualificanal
crash near c
amount for me balance st
minor incomd post constrts.
submission onth of June
ull Road closu. 2+165 to 2+
monthly Audr the month o
ser
ved
PR no. pril 2016
ction at ch
une Traffic
k on
timation for m
MBCB
ation of
amp site
minor atus plete uction
of MPR 2016
ure of S2 +315 dit of June
Received Date
1/7/2016
4/7/2016
4/7/2016
4/7/2016
4/7/2016
5/7/2016
8/7/2016
8/7/2016
11/7/2016
11/7/2016
12/7/2016
14/7/2016
14/7/2016
14/7/2016
19/7/2016
19/7/2016
101
Rema
Recei
Recei
Recei
Recei
Recei
Recei
Recei
Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
arks
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
ved
TNM TM
OPRC WorlMonthly Pro
17 18
18 18
19 18
20 25
21 25
22 25
23 25
24 27
25 29
TECHNOLOGYMANAGEMEN
ld Bank Project fogress Report No 22
8/7/2016
8/7/2016
8/7/2016
5/7/2016
5/7/2016
5/7/2016
5/7/2016
7/7/2016
9/7/2016
Y AND NT LTD.
or Sangrur Mansa (July 2016)
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
PIPL/OPRC/
No. 1
a Bathinda Netwo
/941/2016
/942/2016
/943/2016
/945/2016
/946/2016
/947/2016
/948/2016
/949/2016
1335
ork in Punjab (Ind
Hindrance28+400 to
Hindrancech. 91+620RHS on S2
Submissiofor Improvjunction o
Submissiofor 4th yea
Submissiofor 4th yea
Traffic MaC/D worksat ch 26+1
Submissiodrawing sl26+150
UnauthoriExcavationcontractin
Regardingculvert on34.680
dia)
e due to utilit 45+200 on S
e due to stay 0 LHS and 91 road
n of typical dvement of mn OPRC Netw
n of plan andr work progr
n of plan andr work progr
nagement Ps in Sunam fo150
n of construab culvert at
zed activity:n on S2 road ng Agency of
900m dia ne S2 road at R
ties Ch. S2 road
wire at 1+820
drawings minor work
d profile ramme
d profile ramme
lan of our lane
ction t ch.
by NH 64
ew RD
19/7/2016
19/7/2016
19/7/2016
28/7/2016
28/7/2016
28/7/2016
28/7/2016
28/7/2016
30/7/2016
102
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
6 Recei
ved
ved
ved
ved
ved
ved
ved
ved
ved
top related