PRESERVATION FOR

MACHINERY

OUTLINE SCOPE OF WORK PRESERVATION ACTIVITY ORGANIZATION CHART OF

PRESERVATION SCHEDULE PRESERVATION REPORT OF PRESERVATION

SCOPE OF WORK

PRESERVATION FOR STATIC/VESSEL PRESERVATION FOR ROTATING/MACHINERY PRESERVATION FOR MOTOR

PRESERVATION ACTIVITY PRESERVATION FOR STATIC

STATIC EQUIPMENTS WILL BE PRESERVED BY USING VAPOUR PHASE INHIBITORS (VPI) OR NITROGENT PRESSURE .

NITROGENT PRESERVATION SHALL BE APPLIED UNTIL COMPLETION OF PIPE CONNECTION.

PRESERVATION ACTIVITY PRESERVATION FOR ROTATING

1. PUMP AND DRIVE SHAFTS SHALL BE HAND ROTATED ONCE A MONTH USING CORRECT TOOLS SUCH AS STREP WRENCH .

2. LUBE OIL SHALL BE CHANGED BEFORE MECHANICAL RUNNING TEST

3. GREASE SHALL BE ADDED AND DRAIN OUT DURING MECHANICAL RUNNING TEST

PRESERVATION FOR MOTOR INSULATION RESISTANCE VALUES OF

EACH WINDING FOR ALL MOTORS SHALL BE MEASURED AND RECORD AT LEAST PRIOR TO INSTALLATION AND PRIOR TO SOLO RUN/MRT . THE MEASUREMENT SHALL BE RECORDED ONCE A MONTH.

MOTOR SHAFT SHALL BE HAND TURNING ONCE A MONTH

SPACE HEATER FOR MOTOR SHALL BE TURNED ON ALL THE TIME TO WARM THE MOTOR AND AVOID INCREASING HUMIDITY INSIDE THE TERMINAL BLOCK

ORGANIZATION CHART

SCHEDULE AND REPORT FOR PRESERVATION

SCHEDULE FOR PRESERVATION REPORT OF PRESERVATION

- REPORT OF PRESERVATION WILL SUBMITTED ONCE A MONTH

- PRESERVATION WILL BE RECORDED BY QC TEAM