project plan tasktask ownerdeadline project plansabina ma4/14/09 market questionsdaud zoss4/14/09...
Post on 06-Jan-2018
216 Views
Preview:
DESCRIPTION
VendorDescription Estimated Cost Period Ending DtActual Cost Period Ending Dt AmazonBlocks /19/ /19/2009 AmazonPlay-doh! Clay /19/ /19/2009 Office Depot Office Depot® Poster Boards, 22" x 28", White, Pack Of /3/2009 TargetWhite Rolling Die 1.005/3/2009 Home DepotTape Measure 1.005/3/2009 Office Depot Oxford Color-Coded recycled Index Cards 4" X 6" Assorted Colors Pack of /3/2009 Total Planned vs. Actual Cost
TRANSCRIPT
Project Plan
Work Breakdown Structure – High Level
Project Plan
Vendor DescriptionEstimated
CostPeriod
Ending Dt Actual CostPeriod
Ending DtAmazon Blocks 20.99 4/19/2009 20.99 4/19/2009Amazon Play-doh! Clay 12.44 4/19/2009 12.44 4/19/2009
Office Depot
Office Depot® Poster Boards, 22" x 28", White, Pack Of 10 4.59 5/3/2009
Target White Rolling Die 1.00 5/3/2009 Home Depot Tape Measure 1.00 5/3/2009
Office Depot
Oxford Color-Coded recycled Index Cards 4"
X 6" Assorted Colors Pack of 100 1.99 5/3/2009
Total 42.01 33.43
Planned vs. Actual Cost
top related