proposed external works car park i 8918 / p 106 · fgl 2.30 fgl 2.150 e2x3.27 ne pe g. total : 72...

Post on 16-Jul-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Old LibraryAlbion Street, Lewes, East Sussex BN7 2ND

DRAWING NUMBER:

CA

D F

ILE

NA

ME

:

DATE DESCRIPTION

email. info@mackellarschwerdt.co.uktel. 01273 480608

REVISION

STATUS:

CLIENT:

/Vol

umes

/Cur

rent

Pro

ject

s/C

urre

nt P

roje

cts

Mas

ter-J

ob F

iles/

8900

/891

8 W

illin

gdon

Com

Sch

Spo

rt H

all/D

raw

ings

/Arc

hica

d /8

918

Will

ingd

on R

IBA

2-22

.pln

LOCATION: Broad Road, Willingdon

DRAWN BY:CHECKED BY:

AT

PROJECT NAME:

NOTES

This drawing is Copyright and shall not be produced nor used for any other purposewithout the written permission of the Architects.

Do not scale this drawing.

The Contractor is responsible for checking all dimensions on site.Report any discrepancies, errors or omissions to the Architects immediately.

The Contractor shall ensure that all goods, materials and workmanship conform withcurrent British Agrément Certificates, British Standards and Building Regulations,and ensure that all works are executed in full compliance with all current Codes ofPractice and Regulations in respect of Health & Safety.

FOR PLANNING

Willingdon Community School

East Sussex County Council

8918 / P 106

SCALE: 1:100

DRAWING TITLE: Proposed External works -Car Park 2

SK

DRAWINGS:

This office is licensed to reproduce Ordnance Survey maps onto drawings butanyone doing so must ensure that this use is acknowledged by displaying thefollowing on all copies of all paper maps:© Crown copyright. All rights reserved. Licence number AR 100006739

SHEET SIZE: A1

1:1000 5m 10m

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

New PermeableTarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Bank Raised to New Levels

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Coventry Gullwing Cycle Shelter

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

New Soft Landscaping

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

New PermeableTarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Bank Raised to New Levels

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Coventry Gullwing Cycle Shelter

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improvevisability

New linear Drain

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.86

22.65

22.57

Tarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

Gas BoxMeter Box

Existing Path

Existing Road

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

New Railings to road

New Railings to road

New Railings to road

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

23.35

23.09

23.08

22.40

22.56

22.21

22.01

21.95

23.33

22.85

22.76

23.36

Ex23.05

New22.83

New23.26

New23.05

23.28

23.26

New23.36

New22.93

1,500

6,000

2,500

1,500

6,000

5,000

1,925

300

5,000

2,500

1,20

0

4,1004,100

3,600

3,600

R 6.000R 6.000

New boundary fenceeach side of newgate.

Existing hedgeremoved to improve

visability

New 1.8m weldmesh fence.

New linear Drain

New linear Drain

Existing BoundaryFence Line

New linear Drain

Knee high fencepost and rail.

51

52

53

54

55

56

57

58

59

60

61

62

63

64

22.82

22.60

22.49

21.99

22.13

22.65

22.57

New SoftLandscaping

Tarmac Surface

NewGulley

New SoftLandscaping

Maintenance Access toPlaying Field

New Gulley

Fall 1 : 60

1 : 40Dropped Kerb

New SoftLandscaping

Existing Entrance Adjusted For NewVehicular Access

Gas BoxMeter Box

Existing Path

Existing Road

Existing TarmacFall 1

: 60

IC

IC

ICIC

BUS STOP

New Tarmacsurfacing to busstop areas

New Tarmacsurfacing to busstop areas

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing tree tobe removed

Existing trees tobe kept andprotected duringworks.

BUS STOPBUS STOP

BUS STOP

New Tarmacsurfacing to busstop areas

Existing Gate

Cycle Access

New Railings to road

New Railings to road

New Railings to road

New SoftLandscaping

FGL 22.750

FGL 22.450

FGL 22.30

FGL 22.150

22.92

22.78

Ex23.27

New22.99

New22.57

New23.26

Ex 22.97New 23.09

Step

Step

New Permeable paving.

Total : 72 Cycles

New Linear Drain

New Seating

16 Nº

16 Nº

20 Nº20 Nº

New Kerb Line

New SoftLandscaping

400x400 Tactile paving

Dropped Kerb

Kerb

Dropped Kerb

400x400 Tactile pavingKerb

N

Site Location : 50°48' 41.7816"N 0°14' 28.3499"E

PROPOSED EXTERNAL WORKS CAR PARK ISCALE 1:100

R

RR

R

R

R

RR

R

R

R

R

R

R

R

New Vehicular Gate

Area for Future Cycle Parking

top related