High Rise Building: – 6 Floors or more Dedicated Underground Area: – Automatic Transfer – Pad mount equipment at grade – Two Service Voltages Overhead / Underground Area: – Pad mount equipment at grade – Two Service Voltages

TRANSCRIPT

Providing Service toHigh-rise Condominiums

PresenterCharles L. Kahanek

SWEDE ConferenceHorseshoe Bay, TexasMay 2008

Houston High-rise Condominiums

Standard Service

• High Rise Building:– 6 Floors or more

• Dedicated Underground Area:– Automatic Transfer– Pad mount equipment at grade– Two Service Voltages

• Overhead / Underground Area:– Pad mount equipment at grade– Two Service Voltages

Modular Metering

• General Requirements:– Single Phase Meters Only– 2, 3, 4 or 5 high meter centers, 6 high approval based on overall height– All openings must have meter installed – no blanks– 120/240 or 120/208– Ring Type Enclosures– No Bypass Switches– Must be UL Approved

Providing Service toHigh-rise Condominiums

Continues to Change

MULTI-USE FACILITIES

• CONDOMINIUMS– Penthouses– Spa/Gym– Pool

• HOTEL– Banquet/Meeting Rooms– Food Service

• RETAIL• PARKING GARAGE