PROVING GROUND FOR VOLKSWAGEN,SOUTH CURVE

Facts Project DescriptionDesign and execution of parabolic south curve of high speed test track. Demolition ofexisting south curve. Construction and stabilisation of embankment. Construction of entryand exit roads. Renewal of an underpass.

PROJECT DATA:Parabolic curve south SBA 1,810 mWidth of bituminous pavement 10.5 - 13 mMaximum inclination of curves 49°Max. design speed 237 km/h

City/Country

Ehra Lessien / Germany

Client

Volkswagen AG Deutschland

Contract Value

€ 8,90 Mio.

Construction Period

1/2007 - 10/2007 (9 months)

.