QUANZHOU SEASUNSTAR CRAFT CO.,LTD.

Fountain Process( Material: Polyresin)

Drawing Design:

Carving:

The new sculptures are generally based on the drawing designs.

Material: Black mud, Gesso

Carving:Sometimes ,our engineers finish the new sculpture according to some material, things such as bark , wood ,stone ,animal etc.

←↙

The board and bucket are made of gesso.

The pipe is real, not sculptural.

↑The base and shoes are made of black mud. It makes the sculpture more natural than using gesso.

Opening Mold:

The mold sample

→ →

Pour the slurry of Silica gel and brush.

←←

Paste the fiberglass on the mold sample.

Material: Polyfoam, The slurry of silica gel ,The slurry of polyresin , Yellow mud ,Fiberglass.

Opening Mold:Pour, brush and paste again.

→ →

Then brush the slurry of polyresin.

Remove the partial polyfoam. Repeat the above steps.

Opening Mold:

The mold is OK.

Shaping:

One mold consists of two parts.

Join the two parts of the mold.

Material: Slurry of Poly resin

Check the mold and make sure the mold is good for production

Fix two parts tight with screws.

Pour the slurry of poly resin into the mold

Roll the mold to make the slurry cover the whole silica mold.

Shaping:

After rolling, need 15 minutes for the slurry to solidify.

Open the mold and remove the silica mold from the shaped product

→→

Shaped product

Grinding ,Drilling and Trimming:

Washing and Steeping :

Mending:

Makes the mold line smooth and natural after trimming.

Mending:Before Mending After Mending

Painting:Spraying

Painting:Brushing

Testing:(1) Water leakage test (2) Function testing

Testing:

\□Use paper to test the splash. If splash is too much, test fail, then product needs to be re-worked.

( Dry paper )

(Testing time: 24 hours)Water flow testing

Testing:

The good testing.

□←

Water flow testing

Packaging:

□□

Pump/Transformer Instruction manualPlace the Pump , Transformer ,Product Instruction in related space.

→ →