REGIONAL WATER AUTHORITYFREEPORT

Freeport Regional Water Project

Freeport Pipeline Project

REGIONAL WATER AUTHORITYFREEPORT

Project BackgroundThe Freeport Regional Water Authority’s – Freeport Pipeline Project is the main artery of the Freeport Regional Water Project. The FRWA pipeline project conveys water drawn from the Sacramento River at an intake facility and pumping plant located in Sacramento, upstream of the town of Freeport, and transports the water east through Sacramento County by new large diameter pipelines to both the future Vineyard Surface Water Treatment Plant and the Folsom South Canal.

When operational in 2010, the FRWA Pipeline will provide SCWA with up to 85 million gallons of water per day. SCWA will supply this water to its customers in central Sacramento County to supplement groundwater use in the central part of the county.

EBMUD will use up to 100 million gallons per day of water during dry years only, estimated to be three out of every 10 years, as a supplemental water source to complement existing conservation programs.

REGIONAL WATER AUTHORITYFREEPORT

Pipeline Alignment Overview

REGIONAL WATER AUTHORITYFREEPORT

General Information• The FRWA pipeline will span approximately 17-miles across Sacramento

County between the Sacramento River and the Folsom South Canal

• The FRWA Pipeline project is divided into four contracts: Segment 1, Segment 2, Segment 3, and Segment 4

• Typical trench depth will be 15-ft with pipe cover of 7-ft to 5-ft. Typical trench width is approximately 11-ft to allow clearance on either side of pipe.

• Sloped back open cut trench is allowed in open county and vertically shored trench is required in urban areas

• Pipe bedding and pipe zone backfill will be CLSM 1-ft above top of pipe

• Pipe will be welded steel pipe with concrete mortar lining and tape wrapped coating.

REGIONAL WATER AUTHORITYFREEPORT

Segment 1

Segment 1 is located between I-5 and Highway 99. The pipeline traverses through open country and urban areas

REGIONAL WATER AUTHORITYFREEPORT

Segment 1 - Key Features

• Approximately 5.1-miles of 84-inch CML steel pipe with tape wrapped coating. This segment will have double structural welded joints (Typical).

• Major appurtenances include a large drain facility into Meadow View Creek near I-5, and localized blowoffs at other identified stations (Typical)

• 18-inch storm drain relocation (~3/4 mile) along Cosumnes River Blvd

• Extensive traffic control including a bypass road along Cosumnes River Blvd

• Five tunnels: Morrison Creek and Union Pacific RR (~1000-ft),

Franklin Blvd (~350-ft), Center Parkway (~550-ft); Strawberry Creek (~500-ft), and Hwy 99 (~450-ft)

REGIONAL WATER AUTHORITYFREEPORT

Segment 2

Segment 2 is located between Highway 99 and Vineyard Road. The pipeline traverses through urban areas.

REGIONAL WATER AUTHORITYFREEPORT

Segment 2 – Key Features

• Approximately 6.7-miles of 84-inch CML steel pipe with tape wrapped coating. This segment will have double structural welded joints (Typical).

• 8-inch SS relocation (~600-ft) along Auberry Drive

• 15-inch SS relocation (~500-ft) along Elsie Avenue

• 10-inch water pipe relocation (~1900-ft) along Wilbur Way

• Major appurtenances include a large drain facility at Union House Creek near Elsie Avenue, and localized blowoffs at other identified stations (Typical)

• Three Tunnels: Elsie Avenue (~80-ft), Union Pacific RR and French Road (~700-ft), and Elk Grove-Florin Road (~450-ft)

• Roadway improvements including landscaped medians, traffic signals, and road striping along section of Power Inn Road, Elsie Avenue, and Gerber Road

REGIONAL WATER AUTHORITYFREEPORT

Segment 3

Segment 3 is located between Vineyard Road and the Folsom South Canal. The pipeline traverses through urban areas from Vineyard Road to Excelsior Road and open country from Excelsior Road to the Folsom South Canal.

REGIONAL WATER AUTHORITYFREEPORT

Segment 3 – Key Features

• Approximately 3.9-miles of 72-inch CML steel pipe with tape wrapped coating. This segment will have a single structural welded joints (Typical).

• The Terminal Weir at the Folsom South Canal– Temporary coffer dam will be required for the construction

– Install a bike path detour (~4700-ft) on the east side of the Folsom South Canal

• Major appurtenances include drain facilities at identified stations along the alignment

• One Tunnel: Gerber Road (~340-ft)

REGIONAL WATER AUTHORITYFREEPORT

Segment 4

Segment 4 is located between the Vineyard Road and Gerber Road Intersection to just north of Florin Road. The pipeline traverses through open country

REGIONAL WATER AUTHORITYFREEPORT

Segment 4 – Key Features

• Approximately 1.2-miles of 66-inch CML Steel pipe with tape wrapped coating. This segment will have double structural welded joints (Typical).

• The Flow Control Structure (FCS) within the Vineyard Surface Water Treatment Plant (VSWTP) site at the north end of Segment 4. The key FCS features include:– A CMU Flow Control Structure – Two flow trains each consisting of a 48-inch butterfly valve housed in a

vault separate from the CMU structure; a 48-inch steel CML&C pipe; a 48-inch magnetic flow meter; a 36-inch sleeve valve, and a 36-inch to 60-inch pipe concentric increaser.

– A PLC control room within the CMU structure– Two hoist and monorail systems

• Install a 66-inch motorized isolation valve at the southern end of Segment 4

• The Surge Tank Site approximately 1200-ft east of Vineyard Road. The key Surge Tank Site features include: – 72-inch motorized isolation valve and 72-inch magnetic flow meter – A 3000-cu.ft. surge tank (approx) and air compressor– Back-up generator– CMU control building– Water quality instrumentation

REGIONAL WATER AUTHORITYFREEPORT

Construction Schedule

REGIONAL WATER AUTHORITYFREEPORT

Rough Order of Magnitude Construction

Cost By Segment Segment 1 $55 to $70 Million

Segment 2 $75 to $90 Million

Segment 3 $20 to $25 Million

Segment 4 $10 to $15 Million

REGIONAL WATER AUTHORITYFREEPORT

Contact Information

Brian Lee, Pipeline Project Manager (916) 643-1738Tom Dugan, Pipeline Project Engineer (916) 643-

1745Freeport Regional Water Authority2710 Gateway Oaks Drive, Ste. 320-SouthSacramento, CA 95833Phone: (916) 643-1717

www.freeportproject.org

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Del SareAntelope Equipment, Inc.1701 Rimpau Avenue, #102Corona, CA 92881(951) 737-1481

Jeff CarlsonApollo, Inc.1133 W. Columbia DriveKennewick, WA 99336(509) 586-1104

Les Ours, EstimatorARB, Inc.5116 West Highway 12Lodi, CA 95242(209) 365-0137lours@arbinc.com

Steve LanghalsArgonaut ConstructorsP.O. Box 639Santa Rosa, CA 95402(707) 542-4862

Dan HertelBarnard Construction Co., Inc.P.O. Box 99Bozeman, MT 59771-0099(406) 586-1995Dan.hertel@barnard-inc.com

Chris KnottBT Construction, Inc.9885 Emporia StreetHenderson, CO 80640(303) 469-0199

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Don DavisContri ConstructionP.O. Box 97739Las Vegas, NV 89193(702) 458-6004ddavis@contrinv.com

Chris YoungDW Young CompanyP.O. Box 130Alamo, CA 94507-0130(925) 743-1536dwy@dwyoung.com

Jim EbertEbert, J.W. Corp.1620 S. SeventhSan Jose, CA 95112(408) 297-1031jimebert@ebertcorp.com

Evan LundinGateway Pacific Contractors, Inc.8055 Freeport BoulevardSacramento, CA 95832(916) 665-4100lundin@gatewaypacific.com

Howard P. Klein, Chief EstimatorGranite Construction Company202 Cousteau Place, Suite 105Davis, CA 95616-7761(530) 297-3108Howard.klein@gcinc.com

RicardoHenkels & McCoy, Inc.155 N. Eucla AvenueSan Dimas, CA 91773-2587(909) 592-7733gtisdale@henkels.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Terrell MaroneyJ. Fletcher Creamer & Son, Inc.12874 San Fernando RoadSylmar, CA 91342(818) 367-9748tmaroney@jfcfon.com

Mike JardinJardin Pipeline, Inc.P.O. Box 20817Castro Valley, CA 94546(510) 782-5335caltrenchless@aol.com

Dennis PoultonJF Shea Construction655 Brea Canyon RoadWalnut, CA 91789(909) 594-9500Dennis.poulton@jfshea.com

Mark JacobsonJMB Construction, Inc.132 South Maple AvenueSouth San Francisco, CA 94080(650) 267-5300mark@jmbconstruction.com

Lance RegularKiewit Pacific Co.5000 Marsh DriveConcord, CA 94520(925) 686-3030Lance.regular@norcal.kiewit.com

Jim BriggsL.H. Woods & Son, Inc.2115 La Mirada DriveVista, CA 92081(760) 599-5500jbriggs@lhwoods.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Bill Wellman, Underground Div. Mgr.Las Vegas Paving Corporation4420 South Decatur BoulevardLas Vegas, NV 89103-5803(702) 251-5800undrgrd@aol.com

Paul LukianovLyles, W.M. Company/Willbros Group Inc.P.O. Box 4377Fresno, CA 93744-4377(559) 661-3000plukianov@wmlylesco.com

Steve BacichMaggiora & Ghilotti, Inc.555 DuBois StreetSan Rafael, CA 94901-3965(415) 459-8640maggiorchilotti@spcglobal.net

Ms. Mabel CaterMcGuire and Hester9009 Railroad AvenueOakland, CA 94603(510) 632-7676estimating@mandhcorp.com

Dave Phelps, Administrative Manager

Michaels Pipeline Construction1715 16th Street S.E.Salem, OR 97302-1434(503) 364-1199dphelps@michels.us

Jackie MinyardMinyard Excavating, Inc.4131 Industrial WayTracy, CA 95304(209) 833-4400

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Kathleen Streblow, Bus. Dev. Mgr.Mitchell Engineering250 Executive Park BoulevardSan Francisco, CA 94134(415) 227-1040kstreblow@mitchell-engineering.com

Tim RobertsMonterey Mechanical Company8275 San Leandro StreetOakland, CA 94621(510) 632-3177 x 171t.roberts@montmech.com

Ron BredehoftMountain Cascade, Inc.P.O. Box 5050Livermore, CA 94551(925) 373-8370ronb@mountaincascade.com

Pat Stratton, Business ManagerObasyashi Corporation5000 Shoreline Court, Suite 201South San Francisco, CA 94080(650) 952-4910 x 22pats@obasyashi-usa.com

John IllefPacific BoringP.O. Box 727Caruthers, CA 93609(559) 864-9444pacificboring@pacificboring.com

Dave Hicks, EstimatorRanger Pipelines1790 Yosemite AvenueSan Francisco, CA 94124(209) 835-0300; (415) 822-3700hicks@rangerpipeines.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Diane BakerRWB ConstructionP.O. Box 958Winters, CA 95694(530) 795-3125

Duane WilleS.J. Burkhardt, Inc.115 West La CadenaRiverside, CA 92501(951) 369-8800

Jim LoulamesSE Pipeline Construction11832 BloomfieldSanta Fe Springs, CA 90670(714) 994-5881

Mike KinneyShimmick Construction, Inc.24200 Clawiter RoadHayward, CA 94545(510) 293-1100mkenney@shimmick.com

Ms. Tracy JohnsonSlayden Construction Group, Inc.P.O. Box 247Stayton, OR 97383(503) 769-1969

Scott SeitrichSpiniello Company13241 Lakeland RoadSanta Fe Springs, CA 90670(562) 903-8888scottseitrich@hotmail.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Paul LoukianoffStacey & Witbeck, Inc.1320 Harbor Bay Parkway, Suite 240Alameda, CA 94502-6580(510) 748-1870ploukianoff@staceywitbeck.com

John SchillerSteve Bubalo Construction, Inc.P.O. Box 1048Monrovia, CA 91017(626) 574-7570jcssbcc@aol.com

Jeff PeelSteve P. Rados, Inc.2934 Gold Pan Court, No. 6Rancho Cordova, CA 95670-6136(916) 852-0509spr@radoscompanies.com

Dee FedrickSundt Construction, Inc.P.O. Box 688Novato, CA 94948(415) 892-0848djfedrick@sundt.com

Spencer Frederiksen, Undrgrnd. Div. Mgr.Syblon Reid ConstructionP.O. Box 100Folsom, CA 95763(916) 351-0457srco@srco.com

T.L. PavlichT.L. Pavlich Construction, Inc.7256 Weaver StreetHighland, CA 92346-6263(909) 425-8680tlpavlich@aol.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Wee Chu Teichert Construction, Inc.8589 Thys CourtSacramento, CA 95828(916) 386-5967wchu@teichert.com

Philip ToelkesTidelands Construction Co.P.O. Box 607Brentwood, CA 94513(925) 516-4600toelkestidelands@aol.com

Dave ShiveTotal-Western, Inc.8049 Somerset BoulevardParamount, CA 90723(562) 220-1450

Matt CookUnderground Construction5145 Industrial WayBenicia, CA 94510(707) 746-8800matt@undergrnd.com

Dan SchiteaVadnais Corporation9812 Old Winery Place, Unit #6Sacramento, CA 95827-1732(916) 363-9924rvaladez@vadnaiscorp.com

Michael Debenededto, PresidentWalter C. Smith Company, Inc.P.O. Box 1047Clovis, CA 93613(559) 299-9727miked@smithboring.com

REGIONAL WATER AUTHORITYFREEPORT

Interested Contractors To-Date

Mike Cadie, Vice PresidentWest Valley Construction1455 Nichols DriveRocklin, CA 95765(916) 626-3004danh@wv-inc.com

Phil Lee, Estimator Ford Construction Company, Inc. 639 E. Lockeford Street Lodi, CA 95240 (209) 333-1116 est@ford-construction.com