retrospective activity speed car abyss

Post on 01-Dec-2014

3.649 Views

Category:

Technology

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Agile team retrospective activity; retrospective, futurospective. A forward facing activity with an eye on the past.

TRANSCRIPT

04/09/23

Speed Car - Abyssretrospective exercise

2

Speed Car Abyss Activity

– This is a forward thinking exercise, with an eye on the past.

– A mix of retrospective and futurospective.

– Please consider using 4 colour of notes• Technical or technology

• People or team

• Process and organization

• others

Activity instructios: total 40 minutes

– Looking at the figure (drawn on the whiteboard—next slide), please write notes on the following order: Engine, Parachute, Abysm, Bridge (10 minutes total)

– Read and group notes per zone (5 minutes)

– Discussion and action planning for each zone. Recommended: • Engine, and Parachute 10 minutes; • Abysm, and Bridge, 15 minutes

04/09/23

Looking Back

Engine

What have been pushing us forward? Making us move fast?

Parachute

What have been slowing us down?

04/09/23

Looking Ahead

Abyss

What are the danger ahead? What could take us down the role?

Bridge

What could we build to overcome such challenges? What shall we do to overcome the abysm?

Next Steps

– Read and group notes per zone (5 minutes)

– Discussion and action planning for each zone. Recommended: • Engine, and Parachute 10 minutes; • Abysm, and Bridge, 15 minutes

04/09/23

Close

04/09/23

Thank you

top related