robert sullivan drafting team chair wecc-0108 wecc-0108 int-021 update wecc isas april 2015 salt...

Post on 03-Jan-2016

213 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Robert SullivanDrafting Team Chair WECC-0108

WECC-0108 INT-021 Update WECC ISASApril 2015

Salt Lake City, UT

2

• Updateo At the April 9th meeting two comments were received

from Posting 3 and discussed by the team.o BPA was the only respondent to comment to Posting 3.o The Drafting Team agreed with BPA that the language

in Requirement WR2, Section 2 regarding timing should be clarified. Section 2 was changed to read: After the operating hour.

Drafting Team WECC-0108 INT-021

3

o The DT did not agree with the second proposed change that clarification was needed to Requirement WR2, Section 1 to address Dynamic Transfers.

o As a result no change was made to this requirement as the information is already addressed in INT-008-WECC-CRT-2.1, Dynamic Transfer, Requirement WR5.

Update Continued

4

• May 18th, 2015 2 p.m. to 4 p.m. MDT Webinaro Comment period is from April 13th through May 13th,

2015 for Posting 4.

o Review the comments received during Version 4 30-day posting.

o If no comments are received forward to the WSC with a request for ballot at their May 19th meeting.

Next Meeting

5

• If comments are received:

o Hold a future webinar to discuss proposals for Posting 4 after the 30 day comment period closes.

Next steps

Questions?

Robert Sullivan– California ISO (rsullivan@caiso.com)

top related