Robert SullivanDrafting Team Chair WECC-0108
WECC-0108 INT-021 Update WECC ISASApril 2015
Salt Lake City, UT
2
• Updateo At the April 9th meeting two comments were received
from Posting 3 and discussed by the team.o BPA was the only respondent to comment to Posting 3.o The Drafting Team agreed with BPA that the language
in Requirement WR2, Section 2 regarding timing should be clarified. Section 2 was changed to read: After the operating hour.
Drafting Team WECC-0108 INT-021
3
o The DT did not agree with the second proposed change that clarification was needed to Requirement WR2, Section 1 to address Dynamic Transfers.
o As a result no change was made to this requirement as the information is already addressed in INT-008-WECC-CRT-2.1, Dynamic Transfer, Requirement WR5.
Update Continued
4
• May 18th, 2015 2 p.m. to 4 p.m. MDT Webinaro Comment period is from April 13th through May 13th,
2015 for Posting 4.
o Review the comments received during Version 4 30-day posting.
o If no comments are received forward to the WSC with a request for ballot at their May 19th meeting.
Next Meeting
5
• If comments are received:
o Hold a future webinar to discuss proposals for Posting 4 after the 30 day comment period closes.
Next steps