![Page 1: Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT](https://reader035.vdocument.in/reader035/viewer/2022080917/56649ef25503460f94c04585/html5/thumbnails/1.jpg)
Robert SullivanDrafting Team Chair WECC-0108
WECC-0108 INT-021 Update WECC ISASApril 2015
Salt Lake City, UT
![Page 2: Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT](https://reader035.vdocument.in/reader035/viewer/2022080917/56649ef25503460f94c04585/html5/thumbnails/2.jpg)
2
• Updateo At the April 9th meeting two comments were received
from Posting 3 and discussed by the team.o BPA was the only respondent to comment to Posting 3.o The Drafting Team agreed with BPA that the language
in Requirement WR2, Section 2 regarding timing should be clarified. Section 2 was changed to read: After the operating hour.
Drafting Team WECC-0108 INT-021
![Page 3: Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT](https://reader035.vdocument.in/reader035/viewer/2022080917/56649ef25503460f94c04585/html5/thumbnails/3.jpg)
3
o The DT did not agree with the second proposed change that clarification was needed to Requirement WR2, Section 1 to address Dynamic Transfers.
o As a result no change was made to this requirement as the information is already addressed in INT-008-WECC-CRT-2.1, Dynamic Transfer, Requirement WR5.
Update Continued
![Page 4: Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT](https://reader035.vdocument.in/reader035/viewer/2022080917/56649ef25503460f94c04585/html5/thumbnails/4.jpg)
4
• May 18th, 2015 2 p.m. to 4 p.m. MDT Webinaro Comment period is from April 13th through May 13th,
2015 for Posting 4.
o Review the comments received during Version 4 30-day posting.
o If no comments are received forward to the WSC with a request for ballot at their May 19th meeting.
Next Meeting
![Page 5: Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT](https://reader035.vdocument.in/reader035/viewer/2022080917/56649ef25503460f94c04585/html5/thumbnails/5.jpg)
5
• If comments are received:
o Hold a future webinar to discuss proposals for Posting 4 after the 30 day comment period closes.
Next steps