Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill MagnetProject Summary:Benjamin E. Mays challenges students to think critically on a global scale. As an International Baccalaureate (IB) school, we challenge students to understand the world around them and how to take action within it. The IB program strives to help students develop an international perspective through class projects that examine real-life situations around the world.
Capitol Hill Gifted and Talented Magnet challenges all students by building on their strengths, interests and passions. Students can participate in music programs including band, choir, orchestra and Suzuki strings. Other activities like Model UN, History Day, Science fair, geography bee, debate, Word Masters and more take place during the day or after school. Capitol Hill’s classes bring science, visual arts, drama, physical education and music to life.
These schools are part of the Rondo Educational Complex which was originally constructed in 1978. Extensive renovations were completed in 1991. The building contains 339,177 square feet.
Issues Identified By School Community in 2015Benjamin E Mays:1. Updated fully functioning smart boards in every Instructional Space2. Hydration station (get rid of the current fountains)3. Regulation of heating system4. Building safety - cameras, monitors, one-way atrium windows5. Maintain current BEM space6. Parent room - furniture technology, a place for them7. Retractable blinds/shades for atrium8. Retractable bleachers in gym9. Remodel boys/girls restrooms - water pressure10. Entryway identity - banner on building - parking entrance
Capitol Hill:1. Lighting in hallway2. Upgraded science labs3. Retractable blinds for Atria4. Enhancing lunch room to meet capacity - windows and lights 5. Smaller assembly space - break out space6. Front office space7. Auditorium which will seat 700 8. Indoor playground9. Better bus pathways for drop off and pick up - handicap access indoor tutor10. Clear outside sign with CH
Grade Levels: K-5Grade Levels: 1-8SY 2014/15 Enrollment: XXXXX XXXXXDesign Enrollment: XXXXX XXXXX
1
560 Concordia Avenue
General Notes:Existing utilization shown is for School Year 2014-2015
The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress.
The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. “Work Scope A” is not necessarily the most critical work to be done).
The plans in this document are not comprehensive of the entire building’s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process.
Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured.
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill MagnetSite Concept
Legend:S1. New site signage
S2. New sidewalk and crossing
S3. Enhanced entry identification
AlterationsNew Landscape ConstructionNew Building Construction
Service Entry
Property Line
Secondary EntryMain Entry
2
MAT
CHLI
NE
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill MagnetExisting Utilization
3.1
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
LOWER LEVEL
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill MagnetExisting Utilization
3.2
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
UPPER LEVEL
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill MagnetLegend:C1. Renovate Offices for more prominent identification (2,050 SF)
C2. Cafeteria expansion (1,108 SF)
C3. Reconfigure Capitol Hill Cafeteria with adjacent expansion (2,618 SF)
C4. Renovate Exhibit Hall (3,532 SF)
C5. Relocate Capitol Hill Band Room (1,822 SF)
C6. Relocate Capitol Hill Choir (1,822 SF)
C7. Upgrade Restrooms (1,858 SF)
C8. Capitol Hill Administration Offices (5,168 SF)
C9. Capitol Hill Conference Room and Counseling (2,470 SF)
C10. Instructional Space (8,193 SF)
C11. Capitol Hill Student Assembly/Commons/ Identity (1,732 SF)
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
4.1
Service Entry
Property Line
Secondary EntryMain Entry
ECFE/Discovery
ECFEEntry
CHEntry
Atrium
Atrium
ECFE
Discovery
Community Ed
New / Existing
Demolition / Removal
Conceptual Utilization Plan
Atrium
Atrium
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill Magnet
General LearningSciencePerforming ArtsCareer & Tech EducationMedia CenterDiningAthleticsCirculation
AdministrationArt
Facilities Support
Service Entry
Property Line
Secondary EntryMain Entry
Legend:
C7. Upgrade Restrooms (1,844 SF)
C12. Upgrade Ben Mays/Capitol Hill Entry and School Identity (3,370 SF)
C13. Media Center expansion (1,111 SF)
C14. Renovate Media Center (6,358 SF)
C15. Renovate Ben Mays Cafeteria (3,300 SF)
C16. Create 700 seat Assembly Space (7,190 SF)
C17. Upgrade Capitol Hill Entry and School Identity (1,192 SF)
C18. Upgrade Science Labs (4,834 SF)
4.2
New / Existing
Demolition / Removal
Conceptual Utilization Plan
Atrium Atrium
Atrium Atrium
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill Magnet
5.1
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A 8,440 SF 3,681 SF 3,532 SF
B 16,513 SF 3,801 SF 4,130 SF 8,272 SF
TOTAL 24,953 SF 7,482 SF 7,662 SF 8,272 SF
Line Items Unit Lump SumSignage and WayfindingTechnology in Instructional SpacesBuilding SecurityAtrium Window ShadesHallway Lighting, Ceilings & Walls
New / Existing
Demolition / Removal
Atrium Atrium
Atrium Atrium
Add Bleachers
ECFE CH
Conceptual Construction Plan
Rondo: Benjamin E Mays International Magnet
31713172
Capitol Hill Magnet
5.2
New ConstructionHeavy Remodel
Light RemodelFinishes Only
Medium Remodel
No Work
Scope Package
New Con-struction
Heavy Re-model
Medium Re-model Light Remodel Finishes Only
A 9,034 SF 7,538 SF 3,300 SF
B 4,832 SF 3,301 SF 5,888 SF
TOTAL 13,866 SF 10,839 SF 9,188 SF
Line Items Unit Lump SumSignage and WayfindingTechnology in Instructional SpacesBuilding SecurityAtrium Window ShadesHallway Lighting, Ceilings & Walls
New / Existing
Demolition / Removal
Atrium Atrium
Atrium Atrium
Conceptual Construction Plan
Remove roof to increase height to 24’ volume, tiered floor