A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

Scotts Run Tributary at Windy Hill Road

Stream Stabilization Project

May 2016

2Stormwater Planning Division

Agenda

Project ScopeBackgroundGoals and ObjectivesExisting ConditionsProject ConceptNext StepsContact Information

3Stormwater Planning Division

Stormwater Program Regulatory Drivers

• National Pollutant Discharge Elimination System (NPDES)

• Virginia Stormwater Management Program (VSMP)– Municipal Separate Storm Sewer Permit (MS4)– Discharge from approximately 7,000 storm drain outfalls– Includes watershed planning and project implementation

• Total Maximum Daily Loads (TMDLs)– Chesapeake Bay– Local Streams– Establishes pollutant loading budget for a given impaired water

body to meet water quality standards

4

Scotts Run Watershed• 3,860 acres in Fairfax County• 30% impervious of mostly low

density residential land use• Drains significant commercial

and medium-density resident areas located near Tysons Corner

• Scotts Run discharges into the Potomac River

• Watershed Management Plan identifies frequent flooding at Scotts Run Road

http://www.fairfaxcounty.gov/dpwes/watersheds/middlepotomac.htm

Stormwater Planning Division

5Stormwater Planning Division

Project Objectives

Restore up to 650 linear feet of stream from Windy Hill Road to Box Elder Court:

Stabilize streambed and banks Reduce sediment and nutrient inputs into stream system

Improve habitat Maintain close coordination with stakeholders

6Stormwater Planning Division

Social Goals1. Maintain open dialog and share information.2. Coordinate with all the stakeholders and the community.3. Design Team:

o Rinker Design Associates, P.C.o Utilities Design and Construction Divisiono Stormwater Management

o Stormwater Planning Divisiono Maintenance and Stormwater Management Division

o Urban Forestry

7Stormwater Planning Division

Environmental Benefits

Improve watershed conditions and reduce downstream impacts through….

Controlling quantityMitigate flooding where possible

Controlling velocityReduce erosionProtect infrastructure

8Stormwater Planning Division

Project Location

Windy Hill Road

Box Elder Court

Scotts Run RoadProject Limits

Lewinsville Road

495

9Stormwater Planning Division

Drainage Area

10Stormwater Planning Division

Existing Conditions

11Stormwater Planning Division

Existing Conditions

12Stormwater Planning Division

Existing Conditions

13Stormwater Planning Division

Existing Conditions

14Stormwater Planning Division

Existing Conditions

15Stormwater Planning Division

Existing Conditions

16Stormwater Planning Division

Existing Conditions

17Stormwater Planning Division

Existing Conditions

18Stormwater Planning Division

Existing Conditions

19Stormwater Planning Division

Typical Structures Used – Plunge Pool

20Stormwater Planning Division

Typical Structures Used – Cross Vanes

21Stormwater Planning Division

Typical Structures Used – Rock Weirs

22Stormwater Planning Division

Typical Structures Used – Boulder Toe

23

Vegetation

• Coordinate tree preservation and removal with Urban Forestry

• Native trees, shrubs, and plugs will be planted

• Native seed mix

Stormwater Planning Division

24Stormwater Planning Division

Tentative Construction Access

Windy Hill RoadScotts Run Road

25Stormwater Planning Division

Before and After Stream Restoration

26Stormwater Planning Division

Construction Access

• Timber matting along the length of the access route

• Safety fencing around the site

27Stormwater Planning Division

Construction Example

28Stormwater Planning Division

Construction Example

29Stormwater Planning Division

Construction Example

30Stormwater Planning Division

Growing Season Following Construction Completion

31Stormwater Planning Division

One Year After Construction Completion

32Stormwater Planning Division

Three Years After Construction Completion

33Stormwater Planning Division

Before and After Examples

Flatlick Confluence

January 2011 September 2015

34Stormwater Planning Division

Before and After Examples

Big Rocky Run II

April 2011 September 2015

35Stormwater Planning Division

2011

2013 2015

Before

Before and After Examples

Bridle Path

36Stormwater Planning Division

Next Steps – Schedule

• Complete Preliminary Design- July 2016

• Complete 95% Design- September 2016

• Community Meeting- September 2016

• Complete Final Design- Late Fall 2016

• Construction:

• Start- Spring 2017

• Length- 3 to 4 months (constructed in phases)

• Planting may take place in the fall

37Stormwater Planning Division

Online ResourcesStormwater Planning Division Websitehttp://www.fairfaxcounty.gov/dpwes/stormwater/

Fairfax County Watershed Planninghttp://www.fairfaxcounty.gov/nvswcd/newsletter/planning.htm

Scotts Run Watershed Planhttp://www.fairfaxcounty.gov/dpwes/watersheds/middlepotomac.htm

EPA Water Quality Laws & Regulationshttp://www.epa.gov/water/laws.html

Please sign in and provide your contact information to be included in project progress updates

38Stormwater Planning Division

Contact InformationContact Information

DesignCatie Torgersen– Project Manager

703-324-5189Catherine.Torgersen@fairfaxcounty.gov

Fairfax County Stormwater Planning Division703-324-5500 TTY 711

12000 Government Center ParkwaySuite 449

Fairfax, Virginia 22035www.fairfaxcounty.gov/dpwes/stormwater

To request this information in an alternate format call 703-324-5500, TTY 711

top related