sepetiba dredging and reclamation works ceda dredging days oct 200811 session 5: dredging in...

Post on 02-Apr-2015

216 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CEDA dredging days Oct 2008 1

Sepetiba dredging and reclamation works

1

Session 5: Dredging in sensitve areas

Date: 2 Oct 2008Time: 10:50 – 11:10Author: Jeroen Gheysens

CEDA dredging days – October 2008

CEDA dredging days Oct 2008 2

Sepetiba dredging and reclamation works

2

Overview• Main project information

• Dredging in sensitive areas

• Environmental monitoring

• Dredging of contaminated materials

• Reclamation area layout

CEDA dredging days Oct 2008 3

Sepetiba dredging and reclamation works

3

BRAZIL

SEPETIBA BAYReclamation Area

Dredging Area

Geographical Location

SÃO PAULO

RIO DE JANEIRO

CEDA dredging days Oct 2008 4

Sepetiba dredging and reclamation works

4

General Info on Project

• CLIENT: ThyssenKrupp CSA Companhia Siderúrgica

• CONTRACTOR: Consorcium Dredging International nv – Boskalis International bv

• EXECUTION PERIOD

September 2006 – April 2008

CEDA dredging days Oct 2008 5

Sepetiba dredging and reclamation works

5

DREDGING AREA

RECLAMATION

AREA

• Access Channel– Length 4,3km– Bottom width 128m– Dredging depth -14,5m CD– Volume 6.600.000 m³

• Harbour Basin– Turning circle 250m– Dredging depth -14,5m CD– Volume 4.500.000 m³

CEDA dredging days Oct 2008 6

Sepetiba dredging and reclamation works

6

• Large Cutter Suction Dredger (CSD)– Vlaanderen XIX: 8.358 kW

• Boosters– Cosel: 5.500 kW– DI 509: 4.475 kW– Nieuwe Merwede: 2.984 kW

CEDA dredging days Oct 2008 7

Sepetiba dredging and reclamation works

7

• Confined Disposal Facilities– CDF 1 135.000 m³– CDF 2 141.000 m³

• Contaminated Material– Volume 131.000 m³

• Capping Material– Volume 54.000 m³

Contaminated Areas

Capping Areas

CEDA dredging days Oct 2008 8

Sepetiba dredging and reclamation works

8

• Environmental CSD Beaver St. Lawrence– Cutter Power: 171 kW– Pump Power: 839 kW

CEDA dredging days Oct 2008 9

Sepetiba dredging and reclamation works

9

Overview• Main project information

• Dredging in sensitive areas

• Environmental monitoring

• Dredging of contaminated materials

• Reclamation area layout

CEDA dredging days Oct 2008 10

Sepetiba dredging and reclamation works

10

Dredging in sensitive areas

• Sepetiba Bay: historical contamination, mainly heavy metals – Mangroves - Fishery

• Environmental effects– Spreading and settlement of resuspended solids– Impact on soil organisms during operation– Alteration of bathymetry– Changing shoreline configuration

MINIMISE THE ENVIRONMENTAL EFFECTS!

CEDA dredging days Oct 2008 11

Sepetiba dredging and reclamation works

11

Dredging in sensitive areas

• Minimise the environmental effects– Understand the environmental situation and identify

the most sensitive areas– Selection of dredging equipment– Identification of environmental impacts– Selecting the most appropriate working method– Well trained, experienced and environmental aware

crew– Environmental management and monitoring plan

CEDA dredging days Oct 2008 12

Sepetiba dredging and reclamation works

12

Overview• Main project information

• Dredging in sensitive areas

• Environmental monitoring

• Dredging of contaminated materials

• Reclamation area layout

CEDA dredging days Oct 2008 13

Sepetiba dredging and reclamation works

13

Environmental Monitoring

• Water quality monitoring– Suspended solids dewatering < 500mg/l

• Capping of CDF’s– Capping layer of 1m with ‘no contamination’

• Noise level monitoring– < 65dB (background level)

CEDA dredging days Oct 2008 14

Sepetiba dredging and reclamation works

14

Environmental Monitoring

• Baseline monitoring– Identification of the situation before the start of the

works– Relationship turbidity – suspended solids

• Background monitoring– Weekly basis (background locations)– Identify turbidity from other sources

• River discharges• Heavy rainfall• Seasonal fluctuations

CEDA dredging days Oct 2008 15

Sepetiba dredging and reclamation works

15

Environmental Monitoring

• Water quality monitoring– Daily measurements at fixed locations

• Turbidity (~ Suspended Solids)• Water temperature• Salinity• Instrument Depth

DREDGING AREA

RECLAMATION AREA

CEDA dredging days Oct 2008 16

Sepetiba dredging and reclamation works

16

• Fixed points in the river São Francisco• TSS (mg/l) = 1,14 NTU

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days

turb

idity

(N

TU

)

0

20

40

60

80

100

120

140

160

180

200

prec

ipita

tion

(mm

)

Santa Cruz Piraí C10 C18 CONAMA Limit for Freshwater Baseline from S. Fransisco Rv

CEDA dredging days Oct 2008 17

Sepetiba dredging and reclamation works

17

0

5

10

15

20

25

30

35

40

45

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days

turb

idity

(N

TU

)

0

20

40

60

80

100

120

140

160

180

200

prec

ipita

tion

(mm

)

precipitation C20 C30 C40 C50 Baseline from Sepetiba Bay

• Fixed points in the Sepetiba Bay• TSS (mg/l) = 2,74 NTU

CEDA dredging days Oct 2008 18

Sepetiba dredging and reclamation works

18

• Points around the dredger• TSS (mg/l) = 2,74 NTU

0

5

10

15

20

25

30

35

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days

turb

idity

(N

TU

)

0

20

40

60

80

100

120

140

160

180

200

prec

ipita

tion

(mm

)

precipitation D2N D2S D2W D2E D3N D3S D3W D3E

CEDA dredging days Oct 2008 19

Sepetiba dredging and reclamation works

19

Overview• Main project information

• Dredging in sensitive areas

• Environmental monitoring

• Dredging of contaminated materials

• Reclamation area layout

CEDA dredging days Oct 2008 20

Sepetiba dredging and reclamation works

20

• Confined Disposal Facilities– CDF 1 135.000 m³– CDF 2 141.000 m³

• Contaminated Material– Volume 131.000 m³

• Capping Material– Volume 54.000 m³

Contaminated Areas

Capping Areas

CEDA dredging days Oct 2008 21

Sepetiba dredging and reclamation works

21

Dredging of contaminated materials

• Minimise spillage, turbidity and turbulence• Minimise storage by high concentration dredging• Minimise noise and unpleasant smells• Optimise precision for accurate and selective thin

layer dredging

CEDA dredging days Oct 2008 22

Sepetiba dredging and reclamation works

22

Dredging of contaminated materials

Environmental Sweep Dredger vs Environmental Disc Cutter

CEDA dredging days Oct 2008 23

Sepetiba dredging and reclamation works

23

Overview• Main project information

• Dredging in sensitive areas

• Environmental monitoring

• Dredging of contaminated materials

• Reclamation area layout

CEDA dredging days Oct 2008 24

Sepetiba dredging and reclamation works

24

Reclamation area layout

• Mangroves (high environmental sensitive area)– Protect from salt water of the dredging process– Risk of bund wall failures (Monitoring!)

• Reduce suspended solids dewatering– Maximise travel distance of water on the area– Weir boxes (managing water levels on the area)– Monitoring!

CEDA dredging days Oct 2008 25

Sepetiba dredging and reclamation works

25

top related