Sepetiba dredging and reclamation works
1
Session 5: Dredging in sensitve areas
Date: 2 Oct 2008Time: 10:50 – 11:10Author: Jeroen Gheysens
CEDA dredging days – October 2008
CEDA dredging days Oct 2008 2
Sepetiba dredging and reclamation works
2
Overview• Main project information
• Dredging in sensitive areas
• Environmental monitoring
• Dredging of contaminated materials
• Reclamation area layout
CEDA dredging days Oct 2008 3
Sepetiba dredging and reclamation works
3
BRAZIL
SEPETIBA BAYReclamation Area
Dredging Area
Geographical Location
SÃO PAULO
RIO DE JANEIRO
CEDA dredging days Oct 2008 4
Sepetiba dredging and reclamation works
4
General Info on Project
• CLIENT: ThyssenKrupp CSA Companhia Siderúrgica
• CONTRACTOR: Consorcium Dredging International nv – Boskalis International bv
• EXECUTION PERIOD
September 2006 – April 2008
CEDA dredging days Oct 2008 5
Sepetiba dredging and reclamation works
5
DREDGING AREA
RECLAMATION
AREA
• Access Channel– Length 4,3km– Bottom width 128m– Dredging depth -14,5m CD– Volume 6.600.000 m³
• Harbour Basin– Turning circle 250m– Dredging depth -14,5m CD– Volume 4.500.000 m³
CEDA dredging days Oct 2008 6
Sepetiba dredging and reclamation works
6
• Large Cutter Suction Dredger (CSD)– Vlaanderen XIX: 8.358 kW
• Boosters– Cosel: 5.500 kW– DI 509: 4.475 kW– Nieuwe Merwede: 2.984 kW
CEDA dredging days Oct 2008 7
Sepetiba dredging and reclamation works
7
• Confined Disposal Facilities– CDF 1 135.000 m³– CDF 2 141.000 m³
• Contaminated Material– Volume 131.000 m³
• Capping Material– Volume 54.000 m³
Contaminated Areas
Capping Areas
CEDA dredging days Oct 2008 8
Sepetiba dredging and reclamation works
8
• Environmental CSD Beaver St. Lawrence– Cutter Power: 171 kW– Pump Power: 839 kW
CEDA dredging days Oct 2008 9
Sepetiba dredging and reclamation works
9
Overview• Main project information
• Dredging in sensitive areas
• Environmental monitoring
• Dredging of contaminated materials
• Reclamation area layout
CEDA dredging days Oct 2008 10
Sepetiba dredging and reclamation works
10
Dredging in sensitive areas
• Sepetiba Bay: historical contamination, mainly heavy metals – Mangroves - Fishery
• Environmental effects– Spreading and settlement of resuspended solids– Impact on soil organisms during operation– Alteration of bathymetry– Changing shoreline configuration
MINIMISE THE ENVIRONMENTAL EFFECTS!
CEDA dredging days Oct 2008 11
Sepetiba dredging and reclamation works
11
Dredging in sensitive areas
• Minimise the environmental effects– Understand the environmental situation and identify
the most sensitive areas– Selection of dredging equipment– Identification of environmental impacts– Selecting the most appropriate working method– Well trained, experienced and environmental aware
crew– Environmental management and monitoring plan
CEDA dredging days Oct 2008 12
Sepetiba dredging and reclamation works
12
Overview• Main project information
• Dredging in sensitive areas
• Environmental monitoring
• Dredging of contaminated materials
• Reclamation area layout
CEDA dredging days Oct 2008 13
Sepetiba dredging and reclamation works
13
Environmental Monitoring
• Water quality monitoring– Suspended solids dewatering < 500mg/l
• Capping of CDF’s– Capping layer of 1m with ‘no contamination’
• Noise level monitoring– < 65dB (background level)
CEDA dredging days Oct 2008 14
Sepetiba dredging and reclamation works
14
Environmental Monitoring
• Baseline monitoring– Identification of the situation before the start of the
works– Relationship turbidity – suspended solids
• Background monitoring– Weekly basis (background locations)– Identify turbidity from other sources
• River discharges• Heavy rainfall• Seasonal fluctuations
CEDA dredging days Oct 2008 15
Sepetiba dredging and reclamation works
15
Environmental Monitoring
• Water quality monitoring– Daily measurements at fixed locations
• Turbidity (~ Suspended Solids)• Water temperature• Salinity• Instrument Depth
DREDGING AREA
RECLAMATION AREA
CEDA dredging days Oct 2008 16
Sepetiba dredging and reclamation works
16
• Fixed points in the river São Francisco• TSS (mg/l) = 1,14 NTU
0
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days
turb
idity
(N
TU
)
0
20
40
60
80
100
120
140
160
180
200
prec
ipita
tion
(mm
)
Santa Cruz Piraí C10 C18 CONAMA Limit for Freshwater Baseline from S. Fransisco Rv
CEDA dredging days Oct 2008 17
Sepetiba dredging and reclamation works
17
0
5
10
15
20
25
30
35
40
45
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days
turb
idity
(N
TU
)
0
20
40
60
80
100
120
140
160
180
200
prec
ipita
tion
(mm
)
precipitation C20 C30 C40 C50 Baseline from Sepetiba Bay
• Fixed points in the Sepetiba Bay• TSS (mg/l) = 2,74 NTU
CEDA dredging days Oct 2008 18
Sepetiba dredging and reclamation works
18
• Points around the dredger• TSS (mg/l) = 2,74 NTU
0
5
10
15
20
25
30
35
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31days
turb
idity
(N
TU
)
0
20
40
60
80
100
120
140
160
180
200
prec
ipita
tion
(mm
)
precipitation D2N D2S D2W D2E D3N D3S D3W D3E
CEDA dredging days Oct 2008 19
Sepetiba dredging and reclamation works
19
Overview• Main project information
• Dredging in sensitive areas
• Environmental monitoring
• Dredging of contaminated materials
• Reclamation area layout
CEDA dredging days Oct 2008 20
Sepetiba dredging and reclamation works
20
• Confined Disposal Facilities– CDF 1 135.000 m³– CDF 2 141.000 m³
• Contaminated Material– Volume 131.000 m³
• Capping Material– Volume 54.000 m³
Contaminated Areas
Capping Areas
CEDA dredging days Oct 2008 21
Sepetiba dredging and reclamation works
21
Dredging of contaminated materials
• Minimise spillage, turbidity and turbulence• Minimise storage by high concentration dredging• Minimise noise and unpleasant smells• Optimise precision for accurate and selective thin
layer dredging
CEDA dredging days Oct 2008 22
Sepetiba dredging and reclamation works
22
Dredging of contaminated materials
Environmental Sweep Dredger vs Environmental Disc Cutter
CEDA dredging days Oct 2008 23
Sepetiba dredging and reclamation works
23
Overview• Main project information
• Dredging in sensitive areas
• Environmental monitoring
• Dredging of contaminated materials
• Reclamation area layout
CEDA dredging days Oct 2008 24
Sepetiba dredging and reclamation works
24
Reclamation area layout
• Mangroves (high environmental sensitive area)– Protect from salt water of the dredging process– Risk of bund wall failures (Monitoring!)
• Reduce suspended solids dewatering– Maximise travel distance of water on the area– Weir boxes (managing water levels on the area)– Monitoring!
CEDA dredging days Oct 2008 25
Sepetiba dredging and reclamation works
25