www.utm.my innovative ● entrepreneurial ● global 1

MEASUREMENT OF QUANTITIES

● Mat Naim bin Abdullah @ Mohd Asmoni● Diploma QS (UTM), BSc. QS (Glasgow

Caledonian University), M.Eng. Construction (UTM), PhD Facilities Management (UTM)

● matnaim@utm.my● amn871969@yahoo.com● C04-308● 019-7573760

www.utm.my innovative ● entrepreneurial ● global 2

MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of guard houseOwner: Panicsonic Sdn BhdArchitect: A to Z Sdn BhdDrawing Title: Ground beam and foundation plan-------------------------------------------------------------------------Drawn by: SheilaChecked by: Aaron

www.utm.my innovative ● entrepreneurial ● global 3

MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 4

MEASUREMENT OF QUANTITIES

Construction Method

1. Preliminaries (Initial site works) - % of total cost2. Site clearance and earthwork3. Foundation construction (E.g. Piling and footing)4. Work below lowest floor finish5. Frame6. Staircase7. Upper Floor8. Roof9. Wall and partition10. Door and window11. Finishes12. Sundries (Built-in furniture)13. Building services (M&E, ICT etc)14. External works (Water reticulation, landscape etc)

www.utm.my innovative ● entrepreneurial ● global 5

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

1) Site clearance

1.1) Clear the site including grubbing of trees, shrubs and demolish any existing structure and cart away and dump to the specified location.

10.00 10.00 ---------- 100.00 100 m2 ----------

Area of the site:10 x 10 = 100m2

www.utm.my innovative ● entrepreneurial ● global 6

MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 7

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.1) Piling including all related works

6.10 6.10 ---------- 37.21 37 m2 ----------

Area of the building:Length = 3048 + 3048 = 6096Width = 3048 + 3048 = 6096

www.utm.my innovative ● entrepreneurial ● global 8

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.2) Excavation for pile cap

9/1.22 1.22 1.57 ---------- 21.03 21 m3 ----------

Size of pile cap = 1219 x 1219Depth of excavation: 1524 + 50 (lean concrete) = 1574

Excavation and Lean concrete as base for pile cap

www.utm.my innovative ● entrepreneurial ● global 9

MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 10

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.3) Reinforced concrete Grade 30 for pile cap

9/1.22 1.22 0.31 ---------- 4.15 4 m3 ----------

Size of pile cap:Length = 1219 Width = 1219Thickness = 305

Concrete for pile cap

www.utm.my innovative ● entrepreneurial ● global 11

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.4) 50mm thick lean concrete Grade 15 for pile cap

9 / 1.22 1.22 ---------- 13.40 13 m2 ----------

Size of pile cap:Length = 1219 Width = 1219

Excavation and Lean concrete as base for pile cap

www.utm.my innovative ● entrepreneurial ● global 12

MEASUREMENT OF QUANTITIES

www.utm.my innovative ● entrepreneurial ● global 13

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation

2.5) Formwork for pile cap

9 / 4 /1.22 0.31 ---------- 13.62 14 m2 ----------

Size of pile cap:Length = 1219 Width = 1219Thickness = 305

9/2/1.22 0.31 6.81

9/2/1.50 0.31 8.37

15.18 15m2

Formwork for pile cap

www.utm.my innovative ● entrepreneurial ● global 14

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

2) Foundation2.6) Reinforcement bar Y12 for pile cap

9/2/ 12/ 1.53 ---------- 330.48m x 0.89 kg/m = 294.13kg ----------

= 294 kg

Length:

= a + b + c – cover = 305 + 1219 + 305 – 6(50)= 1829 – 300= 1529

No. of bars:= (b/100) + 1= ((1219 – 2(50)cover )/100 )+1 = 12 nos.

a

b

c

www.utm.my innovative ● entrepreneurial ● global 15

MEASUREMENT OF QUANTITIES

@100 c/c

www.utm.my innovative ● entrepreneurial ● global 16

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF Taker off : Checked by:3.1) Column stump3.1.1) Reinforced concrete Grade 30 for

column stump

9/0.23 0.23 1.04 ---------- 0.50 1 m3 ----------

Size of column stump:Length = 229Width = 229Height = 1524 – 305 thickness of pile

cap – (351/2) Half of beam’s thickness

= 1043.50

www.utm.my innovative ● entrepreneurial ● global 17

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.1) Column stump3.1.2) Formwork for column stump

9/4/0.23 1.04 ---------- 8.61 9 m2 ----------

Size of column stump:Length = 229Width = 229Height = 1524 – 305 thickness of pile

cap – (351/2) Half of beam’s thickness

= 1043.50

www.utm.my innovative ● entrepreneurial ● global 18

MEASUREMENT OF QUANTITIES

@100 c/c

Height of column stump

www.utm.my innovative ● entrepreneurial ● global 19

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.1) Column stump3.1.3) Reinforcement bar Y12 for

column stump

9/4/2.97 ---------- 106.92m x 0.89kg/m = 95.16kg ----------

95kg

Length = a + half beam’s thickness – cover + 2 laps

= 1524 + (351/2) – 50 + (660x2)= 2969.50

lap

a

lap

www.utm.my innovative ● entrepreneurial ● global 20

MEASUREMENT OF QUANTITIES

General Notes

www.utm.my innovative ● entrepreneurial ● global 21

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.1) Column stump3.1.4) R6 link in for column stump

9/6/0.62 ---------- 33.48m x 0.22kg/m = 7.36kg ----------

7kg

Length of link: (length of CS– 2cover) x 4 +hook

=(229-100)+(229-100)+(229-100)+(229-100)+100=616

No. of link:Height of column stump = 1043.50=(1043.50/229)+1= 6 nos.

Hook

www.utm.my innovative ● entrepreneurial ● global 22

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.2) Ground beam3.2.1) Excavation for ground beam

2/3/6.10 0.23 0.35 ---------- 2.95m3 ----------

3m3

Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351

Excavation for ground beam

www.utm.my innovative ● entrepreneurial ● global 23

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.2) Ground beam3.2.2) Reinforced concrete Grade 30 for

ground beam

2/3/6.10 0.23 0.35 ---------- 2.95m3 ----------

3m3

Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351

RC for ground beam

www.utm.my innovative ● entrepreneurial ● global 24

MEASUREMENT OF QUANTITIES

Assumption No. 1: Total land area = 10m x 10m

Project Title: Construction and completion of guard houseOwner: Panicsonic Sdn BhdArchitect: A to Z Sdn BhdDrawing Title: Ground beam and foundation plan-------------------------------------------------------------------------Drawn by: SheilaChecked by: Aaron

www.utm.my innovative ● entrepreneurial ● global 25

MEASUREMENT OF QUANTITIES

@100 c/c

Height of column stump

www.utm.my innovative ● entrepreneurial ● global 26

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.2) Ground beam3.2.3) Formwork for ground beam

2/3/2/6.10 0.35 ---------- 25.62 26m2 ----------

Size of ground beam:Length=3048+3048=6096Width = 229Thickness = 351

Installation of reinforcement bar and formwork for ground beam

www.utm.my innovative ● entrepreneurial ● global 27

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.2) Ground beam3.2.4) Reinforcement bar Y10 for

ground beam

2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ----------

97kg

Length = (length–2cover)+(2bend-2cover)=(6096-(2x50))+(2x351)-(4x50)= 6498

www.utm.my innovative ● entrepreneurial ● global 28

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.2) Ground beam3.2.5) R6 stirrup for ground beam

2/3/28/0.86 ---------- 144.48m x 0.22kg/m = 31.79kg ----------

32kg

Length of stirrup:

=(229-100)+(351-100)+(229-100)+(351-100)+100=860

No. of stirrup:Length of grd beam= 6096=(6096/229)+1= 28 nos.

Hook

www.utm.my innovative ● entrepreneurial ● global 29

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF

3.3) Ground slab3.3.1) Excavation for ground slab

6.10 6.10 0.50 ---------- 18.61m3 19 m3 ----------

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

Installation of formwork,Damp Proof Membrane (DPM) and BRC wire mesh for ground slab

www.utm.my innovative ● entrepreneurial ● global 30

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.3) Ground slab3.3.2) Reinforced concrete G30 in

ground slab

6.10 6.10 0.15 ---------- 5.58m3 ---------- 6 m3

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 31

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.3) Ground slab3.3.3) Formwork for ground slab

4/6.10 0.15 ---------- 3.66m2 ----------

4 m2

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 32

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab3.3.4) BRC A8 for ground slab

6.10 6.10 ---------- 37.21m2 ----------

37 m2

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 33

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd3) WBLFF3.3) Ground slab3.3.5) DPM for ground slab

6.10 6.10 ---------- 37.21m2 ----------

37 m2

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 34

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.3) Ground slab3.3.6) 50mm sand blinding for ground

slab

6.10 6.10 ---------- 37.21m2 ----------

37 m2

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 35

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

3) WBLFF3.3) Ground slab3.3.7) Hardcore for ground slab

6.10 6.10 0.30 ---------- 11.16m3 ----------

11 m3

Area of slab = length x widthDepth of excavation = 500mm

300mm thick hardcore

BRC A8 150mm thick concrete slab

DPM

50mm thick sand

www.utm.my innovative ● entrepreneurial ● global 36

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME Taker off : Checked by:

4.1) Column4.1.1) Reinforced concrete Grade 30 for

column

9/0.23 0.23 3.00 ---------- 1.43 1 m3 ----------

Size of column:Length = 229Width = 229Height = Height of the wall = 3000mm

Installation of reinforcement bar and formwork for column

www.utm.my innovative ● entrepreneurial ● global 37

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME4.1) Column4.1.2) Formwork for column

9/4/0.23 3.00 ---------- 24.84 25 m2 ----------

Size of column:Length = 229Width = 229Height = 3000

www.utm.my innovative ● entrepreneurial ● global 38

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME4.1) Column4.1.3) Reinforcement bar Y12 for

column

9/4/4.50 ---------- 162.00m x 0.89kg/m = 144.18kg ----------

144kg

Length = height of column + half of roof beam + 1 lap + bend

= 3000+ (0.5x351) + 660 + 660= 4495.5

bend

Height of wall

lap

www.utm.my innovative ● entrepreneurial ● global 39

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME4.1) Column4.1.4) R6 link in for column

9/14/0.82 ---------- 103.32m x 0.22kg/m = 22.73kg ----------

23kg

Length of link: (length of CS– 2cover) x 4 +hook

=(229-50)+(229-50)+(229-50)+(229-50)+100=816

No. of link:Height of column = 3000=(3000/229)+1= 14 nos.

Hook

www.utm.my innovative ● entrepreneurial ● global 40

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME

4.2) Roof beam4.2.1) Reinforced concrete Grade 30 for

roof beam

2/3/6.10 0.23 0.35 ---------- 2.95m3 ----------

3m3

Size of roof beam:Length=3048+3048=6096Width = 229Thickness = 351

www.utm.my innovative ● entrepreneurial ● global 41

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME

4.2) Roof beam4.2.2) Formwork for roof beam

2/3/6.10 0.93 ---------- 34.04 34m2 ----------

Size of roof beam:Length=3048+3048=6096Width = 229Thickness = 351

= 351 + 229 + 351= 931

Side

Soffit

www.utm.my innovative ● entrepreneurial ● global 42

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME4.2) Roof beam4.2.3) Reinforcement bar Y10 for roof

beam

2/3/4/6.50 ---------- 156.00m x 0.62kg/m = 96.72kg ----------

97kg

Length = (length–2cover)+(2bend-2cover)=(6096-(2x50))+(2x351)-(4x50)= 6498

www.utm.my innovative ● entrepreneurial ● global 43

MEASUREMENT OF QUANTITIES

Project: Construction and completion of Guard House for Panicsonic Sdn Bhd

4) FRAME3.2) Roof beam3.2.5) R6 stirrup for roof beam

2/3/28/1.06 ---------- 178.08m x 0.22kg/m = 39.18kg ----------

39kg

Length of stirrup:

=(229-50)+(351-50)+(229-50)+(351-50)+100=1060

No. of stirrup:Length of beam= 6096=(6096/229)+1= 28 nos.

Hook