site visit

TRANSCRIPT

SITE REPORT

Wong Yun Shi ( 0315225 )

Measurement 1 - Sr. Ang Fuey Lin

Construction Technology – Mr. Leong Boon Tik

Building Materials – Puan Hasmanira Mokhtar

1

Content Pages Introduction 3Objective 4Photos and Descriptions 5 - 19Conclusion 20

2

Introduction

On 20 June 2014, we have a site visit which organized by our measurement 1 lecturer, Sr. Ang where located at Jalan Klang Lama, Mukim Petaling. It was somewhere nearby The Pearl International Hotel Kuala Lumpur. The employer of the project was Aikbee Timbers Sdn. Bhd. While the main contractor was Encorp Construction Sdn Bhd and the quantity surveyor was PCM Kos Perunding Sdn Bhd.

It was a construction of a 25 storey multipurpose building. Two Basement which are B1 and B2 are car park for shopping mall while first floor and second floor was shopping mall. 3rd floor until 7th floor are car park for residence while 7th floor onward was residential area. It had 403 units for residence

The size of the land was roughly around 1 acre. It is a two years contract, estimate to complete on November 2014 including all the construction, engineering and commissioning works. The total amount for the project was roughly around RM 106.1 millions.

3

Objective

Observe the usage of machinery at the construction site. For example, bar bending machine, concrete mixer, mechanical plants, cutting machine, tower crane.

Aware the importance of personal safety on the construction site. Require to wear safety helmet and safety shoes when going in to avoid accident.

Experience the working place of quantity surveyor which is dealing with weather and the risks may occur on the site.

Gain more basics of the construction process through a site visit.

Increase personal knowledge of the construction process by listening the professional’s briefing and gathering all the information carry on site.

Explore the type of building materials and technology use to construct a building.

Recognize the measurable items for substructure and reinforced concrete frameworks.

4

Photos & Descriptions

View of the site

Bore Piling

5

Independent Scaffolding

Mobile access tower

6

Safety net

Making of concrete spacers

7

Making of concrete spacers

Making of concrete spacers

8

Staircase

Concrete pipe

9

Description board

Precaution on the site

10

Precaution on the site

bents

11

12

Main bars and stirrups in the beam

13

Car park sloping slab

14

Starter bars

pipes

15

Various type of sample

16

17

Plans of the building

Lifting tower tower crane

18

Links & Bents

Mesh Fabric Reinforcement (BRC)

19

Column

Concrete Staircase

20

Forklift

Hold Trailer Concrete Pump

Conclusion

Throughout the site visit, I had learnt the real feeling compared with study at the university lifestyle. It was more tough than I was thought. It really a fresh experience for me that I ever had. I learnt to be more patient and careful because of the weather condition and the risk will be happen everywhere on the site. Teamwork also an important element in constructing a building.

In the university, I will only learnt about the knowledge based on the slide or book that given by lecturers to improve ourselves. But we can’t feel the real life working on outside.

21

As conclusion, I had gained a lots knowledge about the basic of the construction process, experience of actual working space, the usage of machinery, the usage of technology and different of building materials and others. The most memorable moment was the contractor let us to walk down scaffolding from 5th floor to experience the reality of the professionals .

The site visit was useful and bring me to overcome the problem which could happen in my future. I wish I could have more practical knowledge to prepare a better me in my working future.