steve boshier - auckland transport - bim and asset management, can they work together?

Post on 16-Apr-2017

277 Views

Category:

Business

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

BIM & Asset Management Steve Boshier – Asset Integration Manager CRL

June 2016

2

“To BIM or not to BIM….that is the Question”

“Beginning with the end in mind”

Project

Design

Construct

Asset Management

Operate

Maintain

Disposal

3

4

City development

5

Transport leads development

• Leading growth with transport infrastructure is vital to shaping the city

6

“To BIM or not to BIM….that is the Question”

What is BIM??

7

The Project Challenges & Opportunities

Project Objectives

Project Requirements

Project Risks

Delivery Model

8

“Asset Management

• Asset Management Lifecycle

more than just post project

Business Case

Design

Construct

Operate

Maintain

Replace

Disposal

9

BIM – Building Information Modelling

Or should it be “Digital Asset Information”?

• Single Source of Truth – Data Warehouse

• Working in a Common Data Environment

• Collaboration

• Team Work

• Better Decision making

10

BIM – What does it look like?

11

Like this?

12

Like this?

13

Like this?

14

Or this?

15

Or this?

16

Or this?

17

Or this?

18

Benefits of BIM

Collaboration

Clash Detection/Coordination

Shared Risk, reduced risk

Project staged planning

Bill of Materials

Cost planning

Facilities Management,

Asset Management

Lifecycle Management

19

How can BIM & AM work together?

People, Process & Technology

People

• Right skills

• Knowledge

• Understand the process

• Understand the benefits

• Culture change

20

How can BIM & AM work together?

Knowledge & information management

Creation of virtual assets

Technology point of view

A “BIM strategy”

Stakeholders access to data

21

Steps to take?

Treat data as a valuable resource

Structure data with the end in mind

Define your “user requirements”

Asset break down structure

Have an Information Strategy

Become data centric

A database to house it

Take the first step

22

Steps to take?

Identify the skills & training required

Who is going to own it

How is it going to managed

IT resources required to support it

Data Storage

Interfacing between systems

Will you require Mobile solutions?

23

Steps to take?

Employers Information Requirements

Standards….PAS 1192

1192-2 Capital Phase

1192- 3 Operational Phase

1192 – 3 Assets using BIM

Asset Information Model

24

Steps to take?

Asset Information Model (AIM) (PAS1192-3)

Data & Information – Data Store

Linking enterprise systems or

organisational functions

Transfer of data

Exchange of asset information

Record disposal, decommissioning

of an asset

Data Assurance

25

BIM & AM Conclusions

Single source of truth

Work in a common data environment

Collaboration

Quality data

A defined end game

Investment in:-

People

Process

Technology

Maintaining the Information

Thank you.

top related