sustainability for multi-site

Post on 22-Nov-2014

187 Views

Category:

Engineering

4 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

Sustainability for Multi-site

Green Energy Asia 2014by CH’NG Eng Yong eng-yong.chng@schneider-electric.com

Contents

●Introduction

●Challenges to Sustainability

●Sustainable Approach

Schneider Electric 2- Division - Name – Date

●Sustainable Approach

●Keys to Sustainability

+5%

Costs

Costs high = Audit

Waste cutting, some investment

Costs high again:Where’s that last audit?

Here we go again!

Ad hoc approach to energy management…

Schneider Electric 3- Division - Name – Date

0 5Years

-25%

-20%

-15%

-10%

-5%

0

+5%

Under control.

Source : UNIDO EnMS Awareness Training

Structured ApproachSenior management commit

to programme

-5%

0

+5%

CostsInitial savings

sustained

Housekeeping first – then investment

Schneider Electric 4- Division - Name – Date

0 3Years

-20%

-25%

-15%

-10%

-5%

Investment

Housekeeping first – then investment

Becomes company culture

Source : UNIDO EnMS Awareness Training

Contents

●Introduction

●Challenges to Sustainability

●Sustainable Approach

Schneider Electric 5- Division - Name – Date

●Sustainable Approach

●Keys to Sustainability

Challenges to Sustainability

●Lack of strategic sustainability

planning

●Poor monitoring system and

energy data

Schneider Electric 6- Division - Name – Date

energy data

●Proper continuous monitoring of performance

Contents

●Introduction

●Challenges to Sustainability

●Sustainable Approach

Schneider Electric 7- Division - Name – Date

●Sustainable Approach

●Keys to Sustainability

SUSTAINABILITY

DataStructured Continuous

Schneider Electric 8- Division - Name – Date

In-house data

DataStructured Approach Assessment

Energy Monitoring System

(EMS)

System set-up

Energy Management System

(EnMS)

Continuous monitoring

Energy Performance Services

(EPS)

Structured Approach - ISO 50001

A standard for operation an energy management system (EnMS)

A structured framework that

Schneider Electric 9- Division - Name – Date

A structured framework thatenables organizations to establish the systems and processes necessary to improve energy performance, including energy efficiency, use and consumption.

ISO 50001 Defined

PlanAct

Critical set of policies and

Energy Performance Indicators

Energy BaselineEnergy Review

Energy Objectives & Targets

Energy Action Plans

Management

Review

Schneider Electric 10- Division - Name – Date

DoCheck

policies and procedures

Encourage and sustain a high level of energy efficiency

Competence, Training &

Awareness

Documentation

Communications

Design

Control of Documents

Operational Control

Procurement

Monitoring, Measurement &

AnalysisControl of Records

Internal Audit Correction Action &

Preventive Action

Nonconformities, correction

“Blanket Model”

General Requirements

Site Specific

SITE 1

Site Specific

SITE 2

Site Specific

SITE 3

Site Specific

SITE 4

Schneider Electric 11- Division - Name – Date

Site Specific

Requirements

Site Specific

Requirements

Site Specific

Requirements

Site Specific

Requirements

Site Specific

Requirements

SITE 5

FUTURE SITE FUTURE SITE FUTURE SITE

General Requirements

•Energy Policy

•Legal and Other Requirements

•Purchasing (Energy related Equipment & Services)

•Documentation

•Control of Record

•Training (Planning & implementation)

•Communication

•Design

•Internal Audit

•Nonconformities

Schneider Electric 12- Division - Name – Date

•Nonconformities

•Correction, Corrective Action and Preventive Action

Site Specific Requirements

•Energy Review

•Energy Baseline

•Energy Performance Indicators

•Objectives, Targets & Action Plan

•Operational Control

•Training (identify requirements)

•Checking

SUSTAINABILITY

DataStructured Continuous

Schneider Electric 13- Division - Name – Date

In-house data

DataStructured Approach Assessment

Energy Monitoring System

(EMS)

System set-up

Energy Management System

(EnMS)

Continuous monitoring

Energy Performance Services

(EPS)

How EMS Can Help You?

●Baseline

●Key Performance Indicators

●Benchmarking

CCDDKBaseline += *

Schneider Electric 14- Division - Name – Date

●Benchmarking

Phase 1: Monitor

Maximum demand

A/C & lighting

Scheduling

Baseline

Key performance

indicator (KPI)

Online tenant billing

Sample of Implementation Phases

Phase 2: Control Phase 3: Billing

Schneider Electric 15- Division - Name – Date

Schedulingindicator (KPI)

Benchmarking

Overview – Wide Area Network

Energy Monitoring System (Central Server) TERENGGANU’S

SITES

PERAK’SSITES

KELANTAN’SSITES

PERLIS’SSITES

KEDAH’SSITES

Schneider Electric 16- Division - Name – Date

Regional sites

Wide Area Network

Legend:

SELANGOR’S SITES NEGERI

SEMBILAN’S SITES

MELAKA’SSITES

JOHOR’SSITES

PAHANG’SSITES

SITES

Sample Architecture

SITE C

Schneider Electric 17- Division - Name – Date

SITE B

SITE A (HEADQUARTER)

Sample of Implementation SchedulePLAN

Data Analysis

Opportunities & Implementation

Measurement & Verification

Implementation

EnMS

EMS

Measurement & Verification

DO CHECK

Schneider Electric 18- Division - Name – Date

REPLICATION

Data Ready

Installation

EMS

PILOT SITES(>= 2 SITES)

Data Analysis

Data Ready

InstallationSUBSEQUENT

SITES

3-MONTH 4-MONTH

4-MONTH

4-MONTH

Opportunities & Implementation

SUSTAINABILITY

DataStructured Continuous

Schneider Electric 19- Division - Name – Date

In-house data

DataStructured Approach Assessment

Energy Monitoring System

(EMS)

System set-up

Energy Management System

(EnMS)

Continuous monitoring

Energy Performance Services

(EPS)

What is Energy Performance Services

Energy Operation: Cloud-based

software●Display , report on and analyze the complete portfolio of

Schneider Electric 20- Division - Name – Date

●Display , report on and analyze the complete portfolio of your energy consumption across your enterprise

What is Energy Performance Services

Energy Operation: Cloud-based

softwareIdentify inefficiencies and increase energy performance in 5

Services

Schneider Electric 21- Division - Name – Date

Identify inefficiencies and increase energy performance in 5steps:

●Establish baseline , benchmark and KPI

●Define, monitor and manage energy related alarm

●Remotely monitor and analyze

●Follow up on the performance

●Regular energy performance reporting

Client Delivery Model

AcquireAssessAnalyze

Schneider Electric 22- Division - Name – Date

AnalyzeAdvise

Contents

●Introduction

●Challenges to Sustainability

●Sustainable Approach

Schneider Electric 23- Division - Name – Date

●Sustainable Approach

●Keys to Sustainability

Keys to SUSTAINABILITY

Structured Continuous

Schneider Electric 24- Division - Name – Date

DataStructured Approach

Continuous Assessment

THANK YOU

top related