CenPEEP

Sustainable Sustainable Performance ImprovementPerformance Improvement

in Thermal Power Plantsin Thermal Power Plants

Center for Power Efficiency & Environmental Protection (CenPEEP)

Feb 20, 2009

D.K. Agrawal GM (CenPEEP) NTPCM.K.S. Kutty DGM (CenPEEP) NTPC

CenPEEP

• To meet the Challenges in the Competitive Environment a utility needs to have continued improvement in Operating Efficiency.

• Efficiency Improvement also addresses environmental concerns by reducing GHG emissions.

• It leads to better availability and improved profit margin.

Importance of Performance Improvement

CenPEEP

• Having the Margins Available Stations can Substantially Contribute to meet the Peaking Requirement.

• Study by CEA on 56 stations covering a capacity of 38600 MW shows operating HR deviations in the range of about 19.3%.

• Substantial Improvement Potential is Available Even in the Best Run Stations (as per CEA study deviation in HR of some of the best operating stations ranges from 2.05% to 3.60%.

Importance of Performance Improvement

CenPEEP

An average increase of 1% in Efficiency across Indian Power Utilities would result in:

• Coal savings of approx. 11 million tons per annum

• Cost savings worth Rs.16,100 Million ($ 350 Million)

• 3% CO2 reduction per annum (approx.13.5 million tons per annum)

• Higher productivity from the same resources is equivalent to capacity addition

• Lower generation cost per kWh

Impact of Efficiency Improvement Indian Scenario

Installed Capacity (31.12.2008) – 1,47,403 MWThermal – 93393 MW (Coal 77459, Gas 14734, Oil 1200)

Data source:CEA

CenPEEP

CenPEEP Role CenPEEP Role &&

MethodologyMethodology

Performance Improvement Activities

CenPEEP

Global ConcernsGlobal Concerns• GHG Emissions / warming• Emissions from coal usage• Sustainable growth

Utility ConcernsUtility Concerns• Efficiency improvement• Availability improvement • O&M costs - Profitability

Center for Power Efficiency & Environmental Protection (CenPEEP)

CenPEEP

Established by NTPC in collaboration with USAID with a mandate to reduce GHG emissions per unit of electricity generated by improving the overall

performance of coal-fired power plants.

The Centre functions as a Resource Centre for acquisition, demonstration & dissemination of state-of-the-art technologies and practices for performance improvement of coal fired power plants for the entire power sector of India.

CenPEEP

GEPPartners

• USDOE• NETL• EPRI• TVA• GP• Storm Tech.• Structural Int.• Domain Experts

CenPEEP

CenPEEP Partners

Guided byGuided byAdvisory Board & Executive CommitteeAdvisory Board & Executive Committee

Consisting of NTPC, USAID and members from Govt of India, State & Private Power Utilities, industry association, research institutes, etc.

• NTPC• Guj. Gen Co• Maha Gen Co• AP Gen Co• PSEB• UPRVUN• WBPDCL• MPGENCO• IPGCL

CenPEEP

Training &Technology

Dissemination

TechnologyDemonstration

TechnologySelection &AcquisitionTechnology

Transfer

CenPEEP Approach

State-of-the art technology & practices for GHG reductionStateState--ofof--the art technology & practices for GHG reductionthe art technology & practices for GHG reduction

Knowledge is not enough, implementation brings real benefitKnowledge is not enough, implementation brings real benefit

Sustainability Sustainability through through

Implementation ofImplementation ofSystems & Systems & ProceduresProcedures

CenPEEPPlant Performance Optimization

Better EfficiencyLower Emissions• Focus on each

sub-system & component

• Health of each component determines health of the equipment

HR

Unit availability

Boiler Turbine

Air Pre Htrs.

Mills & Burners Condenser & CW System

HP& IP Turbine

BFP & HP/LPHeaters

Boiler Pressure parts

Coal handling system Gen; X-mer & switchyardHuman Element

CenPEEP

Performance EvaluationPerformance Evaluation

Performance Performance OptimisationOptimisation

Recovery of Efficiency LossRecovery of Efficiency Loss

Sustainability through Sustainability through InstitutionalisationInstitutionalisationof Programof Program

Approach for sustainable improvement of Performance of power plants

CenPEEP

• Performance tests techniques using high accuracy test instruments Boiler efficiency, HP/IP efficiency, Condenser, HP/LP heaters, BFP

• Computational software for tests

• High Velocity Thermocouple (HVT)

• Dirty pilot kit• Helium Leak detection

Condenser air-in-leak detection• Water powered cleaners for Condenser tubes• CW Flow measurement & Cooling Tower

performance optimization

• Eddy current Induction heating

• IR Thermography & Acoustics as diagnostics technologies

Low Cost, High benefit Techniques Demonstrated

CenPEEPTypical HR Loss Areas

Indian Power Plants

High loss category (20-60 kcal/kWh)Dry Flue Gas Loss Condenser Unaccountable

Medium loss category(10-20 kcal/kWh)• HP/IP Turbine• RH Spray • Cooling TowerLow loss category (<10 kcal/kWh)• Unburnt Loss• MS & HRH Temperature deviations• Feed water Temperature deviations

Typical Break Up of HR Losses

RH Spray,9%

Turbine (HP & IP),19%

Condenser,15%

Dry Flue Gas Loss,

16%

Others,5%Cooling

Tow er,16%

Unaccountables,20%

CenPEEPThrust Areas - Condenser

Major Concerns• Tube Fouling• Air Ingress• High CW Inlet temperature• High Heat Load

Remedial Measures• Regular & Effective Tube Cleaning• On-line Assessment of Air Ingress• Better Performance of Cooling Tower• Monitoring of High Energy Drains passing

WATER

TUBE

WATER

STE

AM

TUBE

FOULEDSURFACE

CenPEEPApproach For Condenser Performance Improvement

Say O/H O/H

15 mm HG(~ 30 kcal/kWh)

12 mm HG

30 mm HG (~ 60 kcal/kWh)(no cleaningbetween OH)

MiddleApril Oct Apr Next Yr

Effective Condenser tube cleaningduring opportunity S/D – 12 mm HG

improvement

18 mm HG (~ 36 kcal/kWh)(cleaningbetween OH)

22.5 mm HG10.5 mm HG2nd half average loss

6 mm HG (~12 kcal/kWh)Net Improvement

15 mm HG9 mm HGAverage loss for the year

7.5 mm HG7.5 mm HG 1st half average loss

Without cleaningWith CleaningDescription

3 mm HG

CenPEEP

Improved Heat Transfer• Clean boiler surface and Air Heater

baskets during Boiler overhauls• Optimized Soot blowing & LRSB

operation• Replacement of AH Baskets, seals &

sector plates• Coal burners & PF pipe orifices• Excess air Optimization• Minimize Tempering Air • Representative Measurements• Reduction in Air Ingress

Thrust Areas - Dry Flue Gas Loss

O2 & temp sensors relocated / increased at many stations for better feedback & control

CenPEEPMapping of oxygen % in flue gas path

Oxygen in Flue Gas (%) - 200 MW (Aug 08)

0

1

2

3

4

5

6

7

8

Furnace Exit Eco Outlet AH Inlet AH Outlet ID Fan Outlet

Eroded gas ducts, expansion joints & hoppers cause air ingress in boilers

‘What can not be measured can not be saved’

CenPEEP

• 125 Workshops on Boiler & Turbine Performance Analysis & Improvement; Diagnostics and Knowledge based Maintenance

• 14000 Training man days - Participants from NTPC, DVC, GSCEL, UPRUVNL, TNEB, APGENCO, PSEB, RRUVNL, MSEB, IPGCL etc.

• 319 Demonstrations - Hands-on trainings

• Guidelines on Thrust areas

• Papers at various conferences

• Dissemination of new techniques through ‘Optimisers’

• Customized training programs organized at SEBs as per their needs

Quarterly newsletter

Optimisersavailable on NTPC website

Capability BuildingCapability BuildingNational LevelNational Level

It’s important to capture & share the O&M Expertise & ExperienceIt’s important to capture & share the O&M Expertise & Experience

CenPEEPPerformance Improvement Potential

Typical Case StudyTypical Case Study

CenPEEP

Expected kcal/kwh

Actual Kcal/kwh

Total losses Kcal/kwh

Losses Million Rs

1957 2094 137 76.9 ($1.7 million)

Acountable Losses

106 --- 59.5 ($1.3 million)

Unaccoun- table losses

31 --- 17.4 ($0.4 million)

Gross Turbine Cycle Heat Rate (GTCHR)Gross Turbine Cycle Heat Rate (GTCHR)

Case Study - Turbine & AuxiliariesPotential demonstrated in a 210 MW Unit

Glow Sign : Some Utilities have very low losses

CenPEEP

Accountable Losses Accountable Losses –– 106.2 kcal/106.2 kcal/kwhkwh

Description Loss kcal/kwh

Loss Million Rs

Cond. Vac. 28 15.7

HP Turbine Eff. 19.41 10.9 IP Turbine Eff. 10.74 6.1 HP Heater 5 & 6 30.8 17.3

RH Spray 11.58 6.5

Case Study - Turbine & Auxiliaries Potential demonstrated in a 210 MW Unit

Unaccountable Losses 30.8 kcal/Unaccountable Losses 30.8 kcal/kwhkwhCauses - Passing of High Energy Drains, L.P. Turbine Performance, L.P. Heaters, Uncertainty of Instruments

CenPEEP

Awards & RecognitionsAwards & Recognitions

CenPEEP

CTI’s World CTI’s World Climate Climate

Technology Technology Award 2002Award 2002

USEPA USEPA CLIMATE CLIMATE

PROTECTION PROTECTION AWARD 2003AWARD 2003

Awards & RecognitionsAwards & Recognitions

CenPEEP IS A SYMBOL OF SUCCESSFUL INTERNATIONAL COOPERATION FOR GHG REDUCTION

CenPEEP

CenPEEP

• High Potential for Efficiency Improvement in Some Plants

• Potential for Efficiency Improvement even in Best Run Plants

• Correct Performance Assessment is an Essential Pre-requisite

• Focus on Individual Equipment Degradations

• High Benefits with limited Investment

• Quantum Improvements Through Replacement & Upgrades

• Sustainable Performance Improvements Through Testing and Establishing Optimum Regimes of Operation

In Conclusion