Production and Scale-up
Techniques- Suspensions and Emulsions
Syam Perla (M.Pharmacy )
syamsundhar222@gmail.com
1
Product development
scientist
Small pharmaceutical manufacturing
company
Large organisation
Pilot plant
Scientist is
responsible
for first few
batches
Involve large amount of materials and commercial scale equipment costly to operate
2
drug product is developed in the research laboratory at a very small scale
successful in terms of efficacy, safety and stability
needs to be produced at very large scale
but there is substantial difference in the kind of conditions as well as the nature of equipment and facilities between the research laboratory (standard and limited capacity equipments and instruments)and large scale manufacturing
Formulation scientist while developing the product is unable to consider these factors
3
thus a lot of problems are encountered in transferring the product directly from laboratory to production scale
In order to study and tackle above product transfer related problems the concept of pilot plant facility has emerged
Pilot plant is a hybrid manufacturing and development facility allows
successful transfer of the experimental formulations obtained in laboratory to
the production scale so that viable and robust product by the development of
a reliable and practical method of manufacture is possible
which may affect the efficacy, safety ,stability and reproducibility of the product
Scale-up:- The art for designing of prototype using the data obtainedfrom the pilot plant model. 4
PILOT PLANT FUNCTIONS
Review of product formula
Selection of raw material
Selection of processing equipments
Scale up batches
documentation
Technology transfer
5
Pilot plant operations
Type of organizational structure
Research personnel responsible for initial scale up and initial production runs
The product development scientist is responsible for the scale up and technology transfer
Technology transfer
6
Advantages Product scientist knows most about the productVarious product related information stability data etc are best conveyed by formulator
DisavantagesPerson from R&D department is not familierwith the production divisions equipment facilities and operations Time consuming for product scientist
7
Pharmaceutical pilot plant controlled by pharmaceutical research
Advantage Scale up runs is under research division
Any scale up problems in the development process corrective measures can be taken up immediately
Provides pilot plant as apart of R&D with separate staffing
This arrangement is designed to provide the research scientist a responsibility to scale up the formulations that have been developed by other formulators with in research and development
8
Pharmaceutical pilot plant controlled by production
Product scientist establish practicality of formula and manufacturing procedure in a pilot plant facility
Pilot plant personnel responsibility is process development and technology transfer
9
R&D for development and evaluation
Manufactures and suppliers for evaluation of raw materials excipients equipments
Production technology transfer manufacturing support and trouble shooting
QA/QC for raw materials and final product testing
Drug regulatory affairs for documentation and submission of data for various regulatory agencies
Pilot plant inter disciplinary interaction 10
Pilot plant staff and training requirements
RESUME
Good theoretical knowledge
Practical experience
Good communication skills
Formulation experience
Process and equipment experience
Engineer capability
Knowledge in both electronics and computers
11
TRAINING OF PILOT PLANT PERSONNEL
Technical skillsCompliance with quality standards compliance with S.O.PSafety and environmental responsibilities
12
Sree ramaLARGE
ORGANISATION
13
Sree ramaPILOT PLANT LAYOUT
14
Design of a pharmaceutical pilot plant facility
A well designed pilot plant facility minimizes the labour, time and cost the key factors
which influence the design of a pilot plant are product type, product quantity and
activity based considerations
Product type Typical requirements
Solid dosage forms Weighing area ,mixing and granulation areas compression and encapsulation area and coating
facility specialized exhaust and dust collector systems
Liquids and semisolids Shear stirring facility, bottle filling facility, purified water facility ,filling and packaging facility
Soft gelatin capsules
Preparation of gelatin mass, gelatin mass storage area ,facility for loading of the gelatin of the
gelatin mass into encapsulation area dedicated temperature and humidity and humidity
controlled area for drying of the capsules
Parenterals
High shear mixing and stirring facility, sterilization and aseptic processing of the in-process and
finished product (aseptic mixing units, special handling units for control of microbial and cross
contamination )
Biologically derived products sterile manufacturing areas, extensive air handling equipment and environmental controls
Product type: the type of dosage form developed, evaluated and manufactured in a pilot
plant facility and the technology that is going to be employed have an important bearing
on the design of pilot plant
15
Batch size: a pilot plant is supposed to be designed to manufacturewide array of batch sizes meant for different purposes such as productdevelopment, analytical development, and stability testing which aretypically few kg or liters in size a pilot plant facility must be operatedunder good manufacturing practices
Activity based considerations: guidelines for the maintenance of thepilot plant must be exactly the same as that of manufacturing facilityideally large scale equipment in the pilot plant should approach 25-100% of the capacity of full scale equipment
16
Layout of a pharmaceutical pilot plant
Layout must compliance with cGMP guidelines following factors must be taken intoaccount
a) Space requirements and allocation
b) Process flow
c) Construction
d) Safety and environmental considerations
e) Operational costs
Space requirements and allocation
generally a pilot plant facility has following four types of space requirements.
major considerations in assessing the
floor space requirements are
a) Space for equipment
b) Provision for additional portable equipments
c) Dedicated equipment cleaning area
17
Storage facility there should be a separate and appropriate space for storage various purposes
a) Storage of active ingredients and excipients
b) Storage of in-process materials, finished bulk products from the pilot plant
c) Storage of stability samples in controlled environment
d) Storage of packing materials in bulk
Testing facility this area
should provide permanent
bench top space for
routinely used physical
testing equipments
Documentation and
administration
effective monitoring and
documentation of each specific
activity is extremely important18
Process flow plan
a) Materials flow
b) Controlled access for the materials and components used in
manufacturing clinical supplies
c) Sampling of potent substances (specially designed rooms with air locks)
d) Receipt, sampling ,solvent dispensing and quarantine storage of
flammable solvents also need consideration
e) Temporary handling of flammable waste products as well as other waste
material
Ware house layout the ware house layout of a pilot plant facility depends
on the manufacturing capacity type of the product to be manufactured and
the storage requirements, requirements of special storage conditions
Personnel flow: size of rest room,
locker growing and shower areas
a proper provision in the layout
must be made for the cleaning,
disposal and storage
19
Construction features taken into consideration
a) High density concrete floors should be installed
b) the walls in the packaging area should be enamel cement
finish
c) connections between the wall and window frames need to be
carefully constructed to prevent moisture damage and
enhance cleanability
d) light fixtures should be washable and allow for easy
maintenance
Building systems and utilities
The pilot plant HVAC system (heating ,ventilation and air conditioning)
It functions to maintain constant temperature and humidity it must be
suitable to consistently produce a quality product
20
Processed air arrangements for specialized gases and breathing
air are also required for certain specialized process or handling
of some sensitive materials
Control systems controlling and monitoring of air, temperature
as well as relative humidity is the prime concern the other area
where monitoring and control may be desirable include
exhaust duct monitoring for lower explosives limits in solvent
processes
Water used during processing of the
product as well as for cleaning of
equipments and areas water quality is
divided into two types compendial
(USP Purified water and water for
injection)and noncompendial water
(portable water)
21
Safety and environmental considerations
Environmental discharges
Necessary provisions are always incorporated in the
pilot plant layout for isolation and pretreatment or
an alternate means of disposal of waste water will
likely be required if highly potent or toxic compounds are to be processed in the pilot plant
Handling of certain special (potent or toxic) materials
Certain specific arrangements in the building layout are
required to maintain a safe environment inside and
outside the facility
a) light and dark room conditions with lights of specific
wave length for photosensitive materials
b) Humidity controls for moisture sensitive materials
c) Temperature controls for thermo sensitive materials
22
Operational costs
Operational costs for maintaining sterile product facility is much more expensive to
operate than a pilot plant manufacturing solid oral dosage forms
Maintenance, calibration, engineering housekeeping, security, validation, QA,
microbiology, QC shipping receiving and training can be shared
Handling and prevention of
explosives
Explosions are unavoidable thus
the pilot plant layout must
include arrangements for
suppressing, isolating or venting
an explosion in such a way to
protect operators and minimize
damage to the equipment and
facility.
23
FULL SCALE MANUFACTURING
PILOT PLANT
24
Preparation of relevant documents and technology transfer to productionDocuments and reports prepared in pilot plant
Lab note books
Scale up report
Validation protocol and report
Master manufacturing instructions a) weighment sheet : exact quantities of raw materials
b) Stepwise manufacturing instructions : for each unit operation
c) Clearly specified time points: for sampling in process and finished products
Pilot plant transfers the technology to the shop floor for routine
mfg of the product at commercial scale
25
Liquid pharmaceuticals encountered in the pilot plant are defined as non sterile
solutions ,suspensions or emulsions
are the most straight forward to scale up require tanks of adequate size and suitable mixing
capability and heating/cooling capabilities for rapid dissolution all equipment must be of
suitable nonreactive , sanitary materials and to be designed and constructed to facilitate easy
cleaning. Liquid processing tanks ,kettles pipes mills filter housing and so forth are most
fabricated from stainless steel
Stainless steel used in the industry type (308 and 316 ) most often used in the industry is 316
because of its unreactive nature
26
Disadvantage surface alkalinity of the stainless steel
minimized by pre reacting the stain less steel with an
acetic acid or nitric acid this procedure is known as
passivation may need to be repeated at periodic
intervals
Interaction with metallic surfaces can be minimized by
the use of glass or polytetrafluoro ethylene liners.
Although these are highly inert surface materials they
have the obvious disadvantages of cracking breaking
flacking and peeling which results in product
contamination27
suspensions require more attention during scale up studies than dosimple solutions because of additional processing needs
Addition and dispersion of suspending agents
Lab scale sprinkling the material into the liquid vortex
Production scale require vibrating feed systems
Powder materials tends to clump during the process or that is difficult
to disperse
but these can be successfully incorporated by making a slurry with the
portion of the vehicle by using high shear mixer or powder blender
this converts a bulky material which is difficult to handle because of
static charges to a dense readily wettable powder which is mucheasier to handle 28
Mixing at too high speed can result in the
incorporation of an excessive amount of air
into the product
Removal of Air bubbles is
difficult and time consuming
If air bubbles are not removed physical and
stability problems(reproducibility of filling )
Air can be removed using a
vacuum unit such as the versator
Product is drawn
into a vacuum
chamber through
an inlet line
29
In preparing pharmaceutical suspensions the type of
mixers , pumps and mills and the horse power of the
motors should be carefully selected based on scale up
performance
example use of an
appropriate type of mixer
is important because if the
mixer is undersized obvious
problems of inadequate
distribution or excessive
production time result
30
where it is spread on to
the center of high speed
rotating disc.
The centrifugal force produced by the
rotation of the disc causes the product
to form a thin film on the disc surface
as the film thins and moves toward the
outer edge of the vacuum chamber the
entrapped air is drawn off
deaerated product is collected from
the outer edge of the vacuum
chamber
31
Selection of filters the mesh size
chosen must be capable of
removing the unwanted foreign
particulates but should not filter
out any of the active ingredients
If suspensions are not constantly mixed or recirculated during transfer process
they may settle out and there by adversely affect the uniform distribution of the
active ingredient 32
processing parameters of emulsions include temperature
mixing equipment homogenizing equipment final product
filters pumps and filling equipment
Mixing equipment are more likely to lead to air entrapment.
So use of vessels can be operated with the contents under a
controlled vacuum avoids the problem of unwanted aeration
Filtration equipment the unwanted particulates are most
efficiently removed by filtering the separate oil and water
phase before emulsification33
34
Sree rama
Created by SYAM PERLA
References N.K.Jain Pharmaceutical
Product Development pgno 379-418
Theory and Practice Of Industrial
Pharmacy Leon Lachman, Herbert
A. Lieberman pgno 681-710