Symposium on Road to sustainable land administration in Africa

7th annual African conference and Exhibition on Geospatial information, technology and applicationsAccra, 3- 4 October 2012

Aude ARESTE LAMENDOUR – IGN France International marketing and communication manager

Presentation of the DeSILISoR project in Uganda

(Design, Suppliy, Installation and Implementation of the Land Information System and Securing of Land Records)

22

Plan

1. Challenges and objectives

2. The main actors

3. Project progresses Focus 1 – data bases

Focus 2 – documentation preparation and treatment

Focus 3 – Public information and capacity building

4. Conclusion

33

Main challenges and objectives

44

• The land information is treated manually • The information when it exists, is in paper form• The conditions of storage are very poor

Consequences: The risks of damage, loss, destruction of existing

land documentation is very high The land records are not reliable In case of land disputes, the relevant information is

difficult to obtain, generating very long procedures and overwhelmed administrative staff

Challenges

In Uganda, more than 60% of the registered documents is in very bad state.

« In Uganda, 35% of complaints are about acts of fraud and counterfeiting ; 33% of complaints relate to delays in transactions, the unavailability of documents” (World Bank)

55

General philosophy of the DeSILISoR project

This project aims to contribute to the establishment

of the efficient land administration system in Uganda

to:

facilitate and improve the delivery of basic land

services to the population

improve land tenure security

66

General background

Started in February 2010, planned to finish in February 2013 (February 2014 for the technical support and maintenance)

This DeSILISoR project is funded by the World Bank.

The contract is signed with the Government of Uganda and the Private sector Foundation Uganda.

The beneficiary of the project is the MLHUD.

77

Rehabilitation and digitization of land existing land records and cadastral maps (500 000 titles and 16500 maps)

Provision of the base map for the 6 district before national roll out

phase

Upgrade of the working environment at national level with the creation of the National Land Information centre and at the regional level within the 6 districts offices (provision of IT equipements (hardwares and softwares + tailor-made LIS)

Main activities

88

The actors

99

The Consortium is composed of:IGN France International

IGN France (French National Mapping Agency)

The Consortium and its subcontractors

with its International and Ugandan main partners

1010

Project progresses

1111

5 main components and project progresses

COMPLETEDON GOING

ON GOING

ON GOING

IN 2013

1212

Focus 1 - Completion of a geographic data set

1313

Considering a trustable land administration is a transparent land administration for all, the land administration must be based on georeferenced data.

The need for the completion of a geographic data set

• A reliable geodetic network was completed• Production of Up to date orthophotographies

and DTM* on the project area (17 362 m²) – completed in sept 2011

• Georeferencing the existing thematic, such as cadastral maps (16 500 maps) – on going and will be finished by the end of 2012

*DTM: Digital Terrain Model

1414

The areas covered by aerial photographies

1515

Focus 2 – Rehabilitation of the documents

1616

MAPS REHABILITATION AND SCANNING

Rehabilitation and scanning of :• 11,500 cadastral maps• 5,000 historical,

topographical and cadastral index maps

1717

Cadastral Maps for rehabilitation and scanning

1818

Maps digitization

• Georeferencing of 16,500 maps

• Vectorisation of 11,500 cadastral maps

1919

Focus 3 – Public awareness and capacity building

2020

Component 4 – Implementing the LIS

CAPACITY BUILIDNG•Organization of study tours in Europe and in Africa•Preparation of the training plan (general training and dedicated trainings)/ implementation

PUBLIC AWARENESS•Preparation of the communication plan/ implementation (general public and stakeholders and beneficiaries)•Organization of workshops on a regular basis to keep people informed of the project progresses

SHARING OF THE EXPERIENCES•Organization of a regional seminar on the LIS added value and key factors of successes )

2121

Conclusion

2222

Conclusion

MLHUD

Thanks for your attention