tangent piles wall - ohio department of transportation retaing walls.pdftangent piles wall plan view...

Post on 26-Mar-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Tangent Piles Wall

Plan View

Section View

Section View

Concrete Key Wall

Top of ShaftExisting Grade

Top of Bedrock

Elevation View

Coping(Pile Cap)

Drilled Shafts

Reinforcing (Typ)

north end of the project on the east side of SR 315

Existing SR 315CL

Existing Slope

Existing SR 315CL

Existing Slope

Gravity Wall

8’ M

ax

Backfill

Soil Nail Wall

Section View

Section View

Profile View

CL

CL

Soldier Pile and Lagging Wall

Retained Soil

CIP Facing (Optional)

Soldier Pile

H-Pile (Soldier Pile)

Predrilled Hole

Timber Lagging

Timber Lagging

Bottom of Exposed Wall

Top of Wall

Concrete Gutter

Concrete Barrier

Existing Grade

made of timber, concrete, or steel

CL

Section View

Plan View

Elevation View

Timber Lagging

top related