Tangent Piles Wall
Plan View
Section View
Section View
Concrete Key Wall
Top of ShaftExisting Grade
Top of Bedrock
Elevation View
Coping(Pile Cap)
Drilled Shafts
Reinforcing (Typ)
north end of the project on the east side of SR 315
Existing SR 315CL
Existing Slope
Existing SR 315CL
Existing Slope
Gravity Wall
8’ M
ax
Backfill
Soil Nail Wall
Section View
Section View
Profile View
CL
CL
Soldier Pile and Lagging Wall
Retained Soil
CIP Facing (Optional)
Soldier Pile
H-Pile (Soldier Pile)
Predrilled Hole
Timber Lagging
Timber Lagging
Bottom of Exposed Wall
Top of Wall
Concrete Gutter
Concrete Barrier
Existing Grade
made of timber, concrete, or steel
CL
Section View
Plan View
Elevation View
Timber Lagging