team: david konyu – project manager, david konyu – project manager, ramon sanchez –...

Post on 26-Dec-2015

216 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Team:Team: David Konyu – Project Manager,David Konyu – Project Manager,

Ramon Sanchez – Communication Engineer, Ramon Sanchez – Communication Engineer, Chris Lantto – PowerPoint PresenterChris Lantto – PowerPoint Presenter

BionicUrbanGroundSystemBionicUrbanGroundSystem

B.U.G.S.B.U.G.S.

IntroductionIntroduction

The goal of our project is to construct The goal of our project is to construct a walking robot and integrate a walking robot and integrate wireless communication with it. A wireless communication with it. A robotic kit was purchased from robotic kit was purchased from CrustCrawler: Robotic Design and CrustCrawler: Robotic Design and Development, to compensate for Development, to compensate for time restraints and lack of previous time restraints and lack of previous robot construction experience. robot construction experience.

GoalGoal

Our intent is to have a robot that is Our intent is to have a robot that is controlled from a laptop computer controlled from a laptop computer via Bluetooth connection with voice via Bluetooth connection with voice recognition / control software. recognition / control software.

CommunicationCommunication

We have decide to go with Bluetooth We have decide to go with Bluetooth because it is low power consumption and because it is low power consumption and also because there is less interference also because there is less interference with other wireless devices. with other wireless devices.

It has a short distance range about 100 It has a short distance range about 100 meters or 326 feet with a maximum meters or 326 feet with a maximum permitted power of 100mW. permitted power of 100mW.

BluetoothBluetoothBluetooth Dongle which will be used through a laptop.

                                       

  

Embedded Blue eb500-SERBluetooth Serial Adapter

Which will be used on our robot bread board.

For Visual we have decide to go with a wireless Video and Audio system which will transmit everything BUGS is viewing through a TV monitor.

In addition, we are working with In addition, we are working with specific limitations like cost, on-specific limitations like cost, on-board power restraints, weight, and board power restraints, weight, and functionality. functionality.

OBJECTIVEOBJECTIVE

The project objective is to represent The project objective is to represent several areas of study from our several areas of study from our previous electronic and previous electronic and communications courses, while communications courses, while utilizing project management skills. utilizing project management skills.

ROLE ASSIGNMENTROLE ASSIGNMENT

WEB CONSTRUCTION / WEB CONSTRUCTION / MAINTENANCEMAINTENANCE

POWERPOINT CONSTRUCTION / POWERPOINT CONSTRUCTION / MAINTENANCEMAINTENANCE

BUDGET MANAGEMENTBUDGET MANAGEMENT PROJECT MANAGEMENTPROJECT MANAGEMENT RESEARCH / DOCUMENTATIONRESEARCH / DOCUMENTATION TEAM CONSTRUCTIONTEAM CONSTRUCTION

Web-SiteWeb-Site

On our web-site you will find….On our web-site you will find…. ProposalProposal BiographyBiography PicturesPictures X-ray picturesX-ray pictures ResourcesResources LinksLinks DocumentsDocuments

www.bugscapstone07.comwww.bugscapstone07.com

Pictures Pictures

PROJECT MANAGEMENTPROJECT MANAGEMENT

BUDGET MANAGEMENTBUDGET MANAGEMENT

EXPANSION POSSIBILITIESEXPANSION POSSIBILITIES

TEXT TO SPEECHTEXT TO SPEECH SPEECH TO CONTROLSPEECH TO CONTROL INTEGRATION OF ADDITIONAL INTEGRATION OF ADDITIONAL

SENSORSSENSORS ADDITIONAL CAMERASADDITIONAL CAMERAS VIDEO / SENSORS TURRETVIDEO / SENSORS TURRET

STAY TUNEDSTAY TUNED

www.bugscapstone07.com www.bugscapstone07.com

top related