tiana ppt
Post on 23-Dec-2015
42 Views
Preview:
DESCRIPTION
TRANSCRIPT
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEX
CRUZ, KRISTIANA LOUISE E.2010122514
Functional zoning
SPACE PROGRAMMING
SPACE PROGRAMMING
Programming matrix/diagrams
Programming matrix/diagrams
Programming matrix/diagrams
Organizational structure
Organizational structureThe major users are highly prioritized in designing spaces. Major user have regular and time consuming activities that needs much focus than the minor users
The major users are stated as follows:
- MARINA Employees - Training Center employees,
professors- MARINA Head - Capsule Hotel Staff
The minor users of the project is stated as follows:
- Maritime Licensure Examinees - Capsule Hotel Guests- Training Center Visitors - MARINA Office Visitors
Circulatory diagram
Circulatory diagram
Behavioural analysis• MARINA EMPLOYEES
IN Go to office Lunch Back to
work Snack Clean
workplace
OUT
MARINA OFFICE VISITORS
IN Fall in Line
Submit Papers
Wait Eat Receive Papers
Proceed to other office
Payment OUT
MARITIME LICENSURE EXAMINEES
INGet room
assignment
Proceed to exam room
LunchBack to exam room
OUT
Behavioural analysis• PROFESSORS (TRAINING)
TRAINING CENTER VISITORS
IN Time in
Proceed to
faculty room
Proceed to
classroom
Lunch Back to room
Back to faculty room
Time out OUT
IN Enroll Get Schedule Payment OUT
IN Enroll Proceed to class Lunch Back to
class OUT
Behavioural analysis• CAPSULE HOTEL EMPLOYEES
CAPSULE HOTEL GUESTS
IN Time inProceed to locker
room
Proceed to
workplace
Breaktime
Back to work
Back to locker room
Time out OUT
IN Check in
Proceed to
capsule unit
EatBack to capsule
unitSleep Wake up Eat Take a
bathCheck
out OUT
Design concept
•|ShiftFORM
Design concept
• |Sorting • Since the project will be composing of three functions for one aim,
sorting or setting apart is important. First is the setting of the three functions apart: office, training and lodging. These three major spaces also follows the “sorting” concept in its each zone.
• The office is sort out from service-public-private spaces. This is to solve the way wired circulation that is observed from the existing MARINA office.
• The training is to be sort out according to its users: trainees-examinees. Since it is loaded with equipment a zone functioning for its maintenance will be added.
• And lastly, the lodging will be sort from its male and female users as well as the service spaces needed by the lodging house.
FUNCTION
DESIGN concept
• Since one of the major behaviour of people who went in the building is to “wait”, a sort of innovation is made in the waiting area wherein it is placed in a common area and is adjacent to the office and to the view of the garden which can also ease tension, making the project working for the people it serves.
FUNCTION
STRUCTURAL concept• The structural system where
horizontal beams are supported by columns will be applied all throughout the project. The post and lintel concept will be applied in the whole project.
POST AND LINTEL
UTILITY concept
• The project will also require a swimming pool for the training center which will also be used to responsibly distribute water and to recycle it again for other purposes. Through this utility concept, the project is already attaining its goal for sustainability. The used water from the swimming pool will be recycled and be distributed to the water closets as well in the sprinkler system installed along the greeneries.
lighting concept• The picture beside shows the principle followed for the capsule hotel. The shifting of orientations will allow more natural light to pass through the building.
• As for the training center, lecture rooms were placed on the upper floors to get more natural light for day use.
• Thin plans were also used to lessen the use of artificial lighting making the project more energy-efficient
FIRE PROTECTION concept
• Fire Sprinkler system will be provided in each building. In addition to that, fire resistive exterior and interior wall materials will also be provided. There will be specialized non-combustible material that will be used as covering for areas that are highly combustible.
Fire exits
Source: POEA
POEADOLE MARINA
Some government agencies that administers OFWs
Maritime Industry Authority
MARINA 2016 : A premiere maritime administration in
Southeast Asia propelling the Philippine maritime industry to
global competitiveness
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEX
Parkview/Trida building along Kalaw St. corner Taft Ave.
MARINA Central Office• Attractive PH ship registry
• PH as a major center for ship building and ship repair
• Sustained development of globally competitive seafarers
• Modern and vibrant domestic merchant fleet as part of a seamless transport system
Objectives:Soci
o-
eco
nom
ic
Pro
cess
• Foster a globally competitive maritime industry
• Provide wider and timely service to our clients
• Strengthen stakeholders’ ownership of maritime policies, programs and projects
• Ensure compliance with safety and environmental standards
MARINA Central Office
• Ensure sufficient manpower complement
• Enhance competency, motivation and values of personnel
• Develop an IT-enabled agency
Objectives:O
rganiz
ati
on
Finance
• Rationalize budgeting process for optimum use
• Augment resources through use of income, trust funds and other sources
MARINA Central OfficeDocumentation:
MARINA Central OfficeIssues:
MARINA Central OfficeIssues:
“With the cumulative amount spent for rent, MARINA could have had its own building”
“It is recommended that the Department of Transportation and Communications (DOTC) make representation with the
Department of Budget and Management to finance the construction of its own building where its officials and
employees totalling 237 could hold office to do away with huge expenditures for office rental,”
Proposed Integrated MARINA Central Office and Training Complex
MARINA Central OfficeCurrent:
MARINA Central OfficeDocumentation:
MARINA Central OfficeDocumentation:
MARINA Central OfficeDocumentation:
5th floor plan of existing MARINA office
P.D. 1185 Sec. 9a
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXPopulation Sampling:
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXCollected Data:
Profile of Respondents
Age Gender
Address
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSurvey Questions:
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXInnovation:
Capsule Hotel in Osaka, Japan
A capsule hotel is a type of hotel developed in Japan that features a large number of extremely small "rooms" (capsules) intended to provide cheap, basic overnight accommodation for guests who do not require the services offered by more conventional hotels.
Source: Wikipedia.org
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSite Selection:
1.1. Distance from existing MARINA office
Criteria for Site Selection
1.) The site should be near or within the capital city, Manila
2.) The site should be owned by MARINA or by the Philippine government
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSite Selection:
3.) The site should be accessible to major roads
Criteria for Site Selection
4.) The site should be easily accessed by public transportations
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSite Selection:
5.) The site should be large enough to accommodate horizontal expansions
Criteria for Site Selection
6.) The site should at least be near other government offices
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site is near the boundary of Pasay and Manila City which answers one of the
site criteria (that the site should be near
or within the capital city)
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site is owned by the government
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site has a total area of 10 hectares, making it a good
option for horizontal development and expansion
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site is bounded by two major roads: Buendia Avenue
and Diosdado Macapagal Boulevard, making it
accessible
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site is near to other government offices such as GSIS, DFA, etc.; providing
maximum service to clients
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
The site is surrounded by different transportation
terminals with routes within and outside the metro which
makes the site convenient
Site Description
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXProximity Map
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXThe Site
Site Opportunities
LIFELIVELIHOOD
LIVING SPACE
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSite Analysis
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEXSite Analysis
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEX
Design Concept “SHIFT”
PROPOSED INTEGRATED MARINA CENTRAL OFFICEAND TRAINING COMPLEX
Design Concept “SORTING”
Click icon to add picture