TRANSCRIPT

Date:10.11.2016

To,TheDirector,InfrastructureandMiscellaneousProjects&CRZIndiraParyavaranBhavanJorBaghRoad,NewDelhi‐110003

Sub: ApplicationforAmendmentandExpansioninECforResidentialProjectonsub

plot ‘D’,bearingC.S.No.7/1895ofByculladivisionoffKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.

Ref: ECreceivedvideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015DearSir,WehaveobtainedpriorEnvironmentalClearancevideletterNo.SEAC‐2015/CR‐229/TC‐1dt.31.12.2015, forourResidentialprojectonSub‐plot ‘D’,bearingC.S.No.7/1895ofBycullaDivision,offKeshavraoKhadyeMarg,Mahalaxmi,Mumbai,Maharashtra.

TheECwasobtainedforplotareaof14,301.11m2,FSIArea(includingFungible)of24,683.38m2andTotalConstructionareaof57,500m2.

Theconstructionworkisyettostartonsite.

Now,wewouldliketoamendtheEnvironmentalClearanceduetochangein

planning.

Duetothisamendment,totalconstructionareaisincreasedby6800m2.Therefore

totalconstructionareashallbe64,300m2fromearliergrantedECis57,500m2.

ComparativeStatementisasbelow:Sr.No. ProjectDetails EarlierEC ProposedAmendment

1 PlotArea 14,301.11m2 14,301.11m2

2 Permissible FSI includingfungible

Notmentioned 24,918.54m2

3 FSIAreaProposed(includingFungible)

24,683.38m2 24,650.92m2

4 NONFSIArea 32,816.62m2 39,649.08m2

5 TotalConstructionArea 57,500m2 64,300m2

6 Buildingconfiguration Part Basement forservices+ Gr (P1) +7Podium (P2 – P8) + 38Upper floors (including2Fire check /3 servicefloors)

Part Basement for services+Gr(P1)+7Podium(P2–P8)+Stilt (AmenityLevel–1)+AmenityLevel–2+40Upperfloors(33habitablefloors+3MEP Floors + 2 Fire CheckFloors + 2 StructuraloutriggerFloor)

7 Tenement 61Nos. 61Nos.

8 Waterrequirement 43KLD 43KLD

9 Sewagegeneration 40KLD 40KLD

10 STPCapacity 50KLD 50KLD

11 SolidWastegeneration 159kg/day 159kg/day

12 Parking 191Nos 191Nos.

It canbeseen fromthecomparativestatement that there isnochange inplotareaandthereismarginalincreaseinconstructionarea.

WeareenclosingherewithamendedplanoftheprojectandForm1&1A.“AsSEACII(MMR)&SEIAAMaharashtratenureisoverandthereisnocommitteeforappraisalofprojects”we request you sir to appraiseourproject andgrantus theEnvironmentalClearance.Thankingyou,Yoursfaithfully,ForTheModernIndiaLtd.

ProjectProponentEncl: 1.Form1&1A 2.EarlierEC