track lay-by

Post on 01-Oct-2021

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

0

METRES (1:500)

10 20 30 40 50

7ESS

Lay-

by

9

LODGE CLOSE

Path (um)

Barrow School(primary)

Food Processing Plant

Trac

k

Path (um)

6

Loom Loft Furniture& Interiors

CO-OP

McD

onald

's

A59

RetainedVegetation

2

1

A59

A59

2

1

Site Analysis Plan

JBStage 3 - Spatial Coordination

01-123-0005

02.06.2021 1:500@A1

Barrow Brook Business Park Barrow Brook Business Park,Clitheroe

CD.AC.BBBP.SAP.O1

Client: Project Name:

Drawn By:

A T

M

E W

The

Gra

nary

, Sut

ton

Lodg

e F

arm

,55

Che

ster

Roa

d, S

utto

n W

eave

r,R

unco

rn, W

A7

3EA

0160

6 65

4983

0788

4401

777

C.B

rear

ley@

Arc

hi-S

cape

.net

ww

w.A

rchi

-Sca

pe.n

et

Project Address:

Project Status:

Project Number:

Drawing Title:

Date:

Drawing Number:

Scale: Rev:

Barrow Brook Business ParkConsortium

LEGEND

Denotes potential location forSUDS pond.

Denotes existing public right ofway. Footpath 3-47-FP1.

Denotes existing trees to beretained as far as possible.

Denotes A59 Carriageway.

Denotes proposed vehicular siteaccess location.

Denotes close range views, fromapproved future residentialdevelopment, to be considered.

Denotes existing business park.

Denotes approved residentialdevelopment.

NOTESProvision for lorry parking required.

Denotes pedestrian link to futureresidential developement.

Denotes potential location forgreen buffer between proposedcommercial/employment proposal &future residential development.

Revisions:

Rev Description By Date

S3A Updated in accordance with additional reports and information received. CB 16.7.21

S3A

S3A

AutoCAD SHX Text
N

top related