update on the turcot project public presentation - westmount · 2016-04-28 · update on the turcot...

Post on 10-Jul-2020

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Update on the Turcot ProjectPublic Presentation - Westmount

January 14, 2015

2

Montréal-Ouest

Turcot interchange De La Vérendrye

Angrignon

Turcot yard

2

Project Description

3

� Ensure quality in infrastructures built� Limit the inconvenience caused to local communities and

users� Maintain traffic on the primary road network� Promote the socioeconomic development of the greater

Montréal area� Respect environmental and sustainable development

principles� Ensure urban integration and development of the territory� Respect the budget and the schedule

Objectives

4

� Component 1: Work in conventional mode by the MTQ� Component 2: Work in design-build (D-B) mode� Component 3: Maintenance work on existing structures� Railway works under CN’s responsibility

4

Project Description

5

� July 2011-2017: Work conducted by the MTQ� April 2013: Launch of the Request for Proposals� December 2014: Selection of the D-B Supplier� End of February 2015 : signature of the D-B contract� 2015-2020: Civil work related to the D-B Project

Schedule

Ongoing engineering work or work to be started

Ongoing workCompleted work

Saint-Jacques overpass

Boulevard Pullman and 4 overpasses

A-15 south rampTowards A-20 west

Saint-Jacques rampand access to MUHC

Retaining wallMS1-R

Pullman,Saint-Rémi,Saint-Jacques sector

Three rail structures

Raising the level ofavenue de Carillon

ReconfigurationNotre-Dame - CSEM

Extension ofCôte-Saint-Paul

Redevelopment onrue Saint-Rémi

Extension ofDe La Vérendrye

Angers overpass

Removal of asbestoson existing structure

A-20 reserved laneLachine sector

Retaining wallCN-1

Rail overpass Structures A5-1, A6-1

Public transportation measure / Detour Angrignon

Public transportation measure / Reserved lanes

WorkTurcot yard

6

Component 1 - Work in conventional modePublic transportation measureLionel-Groulx development

DismantlingC & Soleil

DismantlingSelby/ Greene

7

7

Westmount

Saint-Jacques overpass

Development of Pullman,Saint-Rémi, Saint-Jacques sector

Glen\De Courcelleoverpass sector

Retaining wallat Atwater exit

Maintaining ramps of Turcot Interchange

Dismantling workSelby/Greene

Development ofGreene overpass

Activities Related to Westmount

8

8

� The condition of the collector requires specific interventions� Long-term closure of rue Saint-Jacques� Schedule to be announced

Saint-Jacques Overpass

9

� Opening of the Girouard on-ramp toward the A-15 South(October 2013)

� Addition of a right-turn lane on chemin de la Côte-St-Luc(May 2014)

� Implementation of a reserved lane on rue SherbrookeOuest (June 2014)

� Opening of the De Maisonneuve exit on the A-15 South(August 2014)

� Addition of a temporary reserved lane on chemin Upper-Lachine (to come)

� Coordination of worksites between different partners

9

Mitigation Measures for St-Jacques Overpass

10

1. Saint-Jacques between Décarie and access road to MUHC2. Pullman between the Turcot operations center (COT) and rue De Courcelle3. Saint-Rémi between Saint-Jacques and rue Cazelais4. Development of the escarpment (St-Jacques cliff)

COT

1

2 34

CUSM

Development of the Pullman Sector

11

Landscaping on rue Saint-Jacques

11

Development of the Pullman Sector

MUHC

Redevelopment of rues Pullman, Saint-Rémiand Saint-Jacques� Dismantling of a building on 856, rue Saint-Rémi

13

Land on De Courcelle/Saint-Jacques

13

MUHC

Land on De Courcelle / Saint-Jacques

14

� Architectural concept of the sector in line with the development of the cliff

14

Land on Glen \ De Courcelle

15

� Word duration: 6 months� Occasional partial closures of the Atwater exit

Retaining Wall, A -720 exit at Atwater

16

� Result from the online public consultation: Green wall

Retaining Wall, A -720 exit at Atwater

17

� Residential buildings at the corner of rue Selby and Greene avenue

Dismantling of Buildings

18

� Impact of the two-lane structure on the network

18

Greene Overpass

19

� Terraced landscape

Greene Overpass

20

Maintenance Work on Existing Structures

• Work completion in spring 2015

21

� Neighbourhood committee in NDG/Westmount� Neighbourhood committee in the South-West

� Website: www.turcot.gouv.qc.ca� Monthly electronic bulletin� Phone line dedicated to the project: 514 873-1372� Twitter @MTQ_Turcot

21

For More Information

22

www.turcot.gouv.qc.ca

top related