8/4/2019 (Urgun Site)Site Assessment Report.
1/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report2011
Uniform Police District HeadquarterUrgun District, Paktika Province, Afghanistan
South East Region
Contract: W5J9JE-11-A-0003Call Log No # 0009
AFGHANISTAN PROVINCE MAP
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan I | P a g e
Urgun Paktika
-
8/4/2019 (Urgun Site)Site Assessment Report.
2/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan II | P a g e
Proposed Site
-
8/4/2019 (Urgun Site)Site Assessment Report.
3/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
August 11, 2011
Sai SharpProject Manager, Salerno AOAfghanistan Engineer District
SITE:
Uniform Police District Headquarter (UP DHQ)Urgun District, Paktika Province, AfghanistanEast RegionJQ Builders & Contractors Project
Respected Madam,
JQ builders has successfully completed and prepared the subject Site AssessmentUrgunDistrict, Paktika Province for AED-N underBPA: W5J9JE-11-A-003. This site assessment report includes preliminary information andcomplete Land owner ship Documents forUP DHQ Urgun District Paktika Province.
Regards,
Mark.A.JonesProject DirectorJQ Builders & ContractorsContact No# 0093- 785117410E-Mail : zub_sas@yahoo.comKabul, Afghanistan
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan III | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
4/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Table of Contents
S. No. Description Page
1. Introduction 01
2. Future Development 01
3. Site Assessment 01
3.1. Site Location 01
3.2. Site Ownership 02
3.3. Site Current Condition 03
3.4. Surrounding Site 033.5. Site Topography 03
3.6 Water Well Data 03
3.7 Site Drainage 03
3.8 Mines and unexploded Ordinances 03
3.9 Site Access 03
3.10 Resources 04
3.10. Proposed ANP Site Grid Coordinates 05
4. Google Maps for proposed Site.
4.1-2 Google Map for proposed Site 6-7
5. Government letters & Land Owner ship Certificates
5.1. JQ Builders Introduction Letter from Mol facility Director to ZoneCommander
8-9
5.2. Spin Ghar (505) Zone Commander Letter to Paktia Province ANP
Provincial Commander for Introduction of JQ Builders Regarding
Site Assessment
10-11
5.3. Provincial Police Commander Letter to Urgun District ANP Police
Commander
12-13
5.4. Urgun District ANP Police Commander Letter to Paktika Provincial
Police Commander
14-15
5.5. Paktika Provincial Police Commander Letter to 505 Spin Ghar Zone
Commander
16-17
5.6. Enquiry letter from Urgun Dist Police Commander to Dist MunicipalityDepartment
18-19
6. 6 Proposed Site Pictures 20-24
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan IV | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
5/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report2011
1. INTRODUCTION
JQ Builders & Contractors has completed Site Assessment of(50m60m)Approximately1.5 Jirub Urgun District UP DHQ facility, Paktika Province Afghanistan. The site is locatedon normal grade area; the land is totally private property. Governments dont have land forUrgun District UP DHQ facility. The North Side of the proposed site there is one Fuel Pumpand one Existing District Headquarter & fuel station is close to the proposed site. ProposedSite is Located on the main road which comes from Sarobi to Urgun. Total population ofUrgun District is about 90,000 peoples. The site visit was conducted on 11 August 2011 forthe Uniform Police District Headquarter (UP DHQ).
Note: Total Private Land belongs to local people. The proposed private land near to main roadof Sarobi to Urgun.
.
This effort was preliminary to a Master Planning effort including assessment of the following;
1. Land Ownership Certificate2. Transfer of Land Ownership to Government (Mol)3. Land Ownership for Access Road4. Land Ownership for Well Drilling5. Adjacent Land Use6. General Availability of Utilities on Site7. Site Condition8. Access Roads9. Availability of Construction Materials and Labor10. Availability Clinics, Fuel and Public Transportation
According to the government officials the site assessment of foresaid land was not inclusive inthe master plan of Mol.
2. FUTURE DEVELOPMENT
The project site is not anticipated to accommodate a Uniform Police District Headquarter (UPDHQ), because the proposed Site is under Construction. Its already transferred fromGovernment to local on sale basis. The proposed Site and the surrounding area are on PrivateConstruction right now.
3. SITE ASSESSMENT
3.1. Site Location
The Site is located in Urgun District on the normal grade area; Current Private Proposed Site ofUP DHQ facilities at a Distance of 10 m from Main Road to Sarobi district and about 45 kmaway from Sharana city the capital of Paktika province. All four Sides area of proposed side isbelong to private property; the local people use this land for their private use, not to transfer this
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 1 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
6/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
land for Construction of District Head Quarter. The sites average elevations, (GPS SiteRecorder) are between 2,224 meter to 2,225 meters.
3.2 Site Ownership
The proposed site land was belongs to locals of Urgun district.
Land Documents are signed by the following individuals & Government officials.
A. Local Elders & Local Shura members Verification.
S.No Name Designation Contact No Village / Province
1 Gul Baz Khan Local Elder 0706309414 Pakhtai Kalai District Urgun Paktika2 Hazrat Gul Chieftain 0707974182 Pakhti Kalai District Urgun Paktika
3 Haji Gul Marjan Local Elder 0706203963 Loi Urgun District Urgun Paktika
4 Sardar Khan Chieftain 0795732507 Warokai Urgun District Urgun Paktika
B. Government officials Signatures.
S.No Officials Signatures Designation / Name
1 Verified and signed by Mol facility Department Director
2 Verified and signed by 505 Spin Ghar Zone Commander Gul Nabi Ahmadzai
3 Verified and signed by Provincial Police Chief Paktika Major General Dawlat Khan4 Verified and signed by Urgun District Police Chief Mohammad Zarif Chetarwal
5 Verified and signed by Urgun District Municipality Chief Noor Mohammad
JQ Builders & Contractors Team has Survey & verified the Land from every aspect and
signed by all possible government officials and local elders.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 2 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
7/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
3.3 Site Current Condition
The proposed site is located on normal area, no need of considerable grading & filling will
require getting a constructible site, and the site will need about 10 m Road construction for join
the main road which goes from urgun to sarobi. The Water well will be drilled at center of site.
Water table in proposed site is 25m to 30 meter.
3.4 Surrounding Site
The surrounding area is even & smooth, government not allowed us to construct District
Headquarter facilities. The Site is located on normal grade area. The all four sides of the
proposed site are surrounded by fuel pump, one Rent Car Showroom & other local private
homes. Surrounding area is belonging to private property. Government has no land for any
facility construction.
3.5 Site Topography
The Proposed Site is Located on normal grade area, the site has soil, Gravel and no rocky
surface. The highest elevation is at the North corner (P4) and the remaining sides are in same
grade. Proposed site is on one meter slope.
SITE ASSESSMENT
3.6 Site Drainage
The site generally drains from East to West.
3.6 Proposed Site Water Well Data
Water table in proposed site is 25 m to 30 m.According to Local Community & Government
record water is available in 25 m to 30 m.the water table in Urgun is different indifferent
locations.becuase there are different water channels in land. Some where you find water in 25
meters, and in few locations you find it in 30 meters. According to GPS Records we find it in 25
meter.
3.7 Mines and unexploded Ordnances
Based on information from locals and District Police Commander and Provincial Commander,
there is no signs of UXO hazards on the site. However, no documentation for mine clearing of
the site was available.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 3 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
8/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
3.8 Site Access
The proposed site is located on the main road on 10 meter.100 meter away from main bazaar.
And 45 Km away from Sharana. The Site actual construction can be started without any cutting
and grading. Proposed Site is situated on the main road from urgun to sarobi.
3.9 Resources
1. Construction Machinery, locally available, and 45 Km from Sharana
2. Skilled and Unskilled Labor, available in Urgun district
3. Cement, Steel Bar and Gypsum, 45 Km from Sharana city,
4. Crushed Aggregate, 3 km from Urgun city
5. Bricks, 1 Km from Urgun city
6. Sand and Gravel, 2 km from locally available.
7. Stone, 3 km locally available.
8. Medical Clinic, District center on Main road market
9. Fuel Point, Near by Proposed site on 30 meter.
10. Water Well Should be drilled for construction
11. Water Table at Off Site 25m to 30 m
12. Access road, 10 m from the main road,
13. Tele Communication: All Networks work properly, AWCC, Roshan, Etisalat, MTN
14. Public Transportation: Available.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 4 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
9/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
ESSMENT
3.10 Proposed site, Off Site Well Coordinates
3.10.1 UP DHQ Proposed site Grid Coordinates
Points Latitude Longitude Elevation1 3256'22.74"N 6910'32.78"E 2225m
2 3256'22.04"N 6910'31.79"E 2225m3 3256'20.43"N 6910'34.36"E 2225m
4 3256'21.83"N 6910'34.92"E 2225mCenter 3256'21.70"N 6910'33.0"E 2225m
Off Site Well Coordinates
Point Latitude Longitude Elevation1 32 56 22.23 69 10 33.09 2225m2 32 56 21.82 69 10 32.81 2225m
3 32 56 21.97 69 10 33.58 2225m
4 32 56 21.56 69 10 33.30 2225m
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 5 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
10/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
4. GOOGLE MAP OF THE PROPOSED SITE
4.1 Google Map of the proposed site
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 6 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
11/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
4.2 Proposed Site & Site Well Google Map
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 7 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
12/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5. GOVERNMENT LETTERS & LAND OWNER SHIP CERTIFICATES
5.1 JQ Builders Introduction Letter from Mol facility Director to Zone commander (505) SGhar
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 8 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
13/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.1.1Translation of Mol Introduction Letter
Islamic Republic of AfghanistanMinistry of Interior
Deputy of AdministrationDirectorate of ConstructionLand Department
Letter No. 1012/530
Date: 4.5.1390
To Respect 505 Spin Ghar Zone Police Commander,
Base on Letter/ Dated: 9 June 2011, The Combined Security
Transition Command-Afghanistan (CSTC-A) who assigned JQ Builders &
Contractors to survey & identify the property state for building
construction of UP DHQ Urgun District Paktika Province. Regarding the
survey & identifying the state property your cooperation with the team
will be highly appreciated.
With regards
Deputy acquisition and administrator
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 9 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
14/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.2 Spin Ghar (505) Zone Commander Letter to Paktika Province ANPProvincial Commander for Introduction of JQ Builders Regarding SiteAssessment.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 10 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
15/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.2.1 Translation of Zone commander letter
505 Spin Ghar Zone Police DepartmentAdministrative Department
Operations & Maintenance Department
Letter No. 244/197Dated: 16.5.1390
To respect Paktika Provincial Police Department,
Base on letter No 1012/530, Dated: 4.5.1390. The CSTC-A who
assigned JQ Builders & Contractors to identify the property state for building
construction of UP Urgun District Paktika Province. Regarding the survey &
identifying the state property your cooperation with the team will be highly
appreciated.
The above written commands have been transferred to you for next
execution.
With Regards
General Gul Nabi Ahmadzai
505 Spin Ghar Zone Commander
Sign of commander
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 11 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
16/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.3 Provincial Commander Letter to Urgun District ANP Police Commander
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 12 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
17/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.3.1 Translation of Provincial ANP Commander Letter.
Paktika Provincial Police DepartmentGeneral Acquisition & Administrative Department
Logistic Department
To respect Urgun District Police Department,
Reference to letter No 244/197, the operations & maintenance department,
505 Spin Ghar Police departments that to identify the governmental land for
Urgun UP department, the letter have been sent with a courtesy copy to your
honor. We hope to cooperate regarding the issue.
With Regards
Paktika Provincial Commander
Major General Dawlat Khan
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 13 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
18/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.4 Urgun District ANP Police commander letter to Paktika Provincial Police Commander.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 14 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
19/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.4.1 Translation of Urgun District ANP Police Commander Letter.
Paktika Provincial Police DepartmentUrgun district Police department
Department Office
Letter No. 1526/1438Dated: 22.5.1390
To respect Paktika provincial police department,
As of document No. 35, Dated: 17.5.1390 the 505 Spin Ghar Zone Police
department on letter No. 244/197 in this regard just sent one document. The
sketch of HQ building was with the engineer, on the time of coordination the
ANP was on the spot, though the building land is allocated on the street to the
south and close of Sarobi district administration office compound which one was
sketched for the building. The inquiry attached with the document is sent to the
Urgun district municipality admin office. Regarding the issue we need your
necessary action.
With Regards
Urgun District Police Commander
2nd Surveillance Mohammad Zarif Chetarwal.
Sign by district police commander
Checked by Acquisition Administration
Dated: 22.5.1390
Regarding the issue take the legal action.
Signature of Provincial Police Commander
Major General Dawlat Khan
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 15 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
20/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.5 Paktika Provincial Police commander letter to 505 Spin Ghar Zone Commander.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 16 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
21/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.5.1 Translation of Paktika Provincial Police commander letter to 505 Spin Ghar Zone Commander.
Paktika Provincial Police DepartmentGeneral Acquisition & Administrative Department
Logistic Department
To respect 505 Spin Zar Zone Police Department,
Based on missive No.35 Date: 17.5.1390, directorate of Repairs
of this HQ on predication No 244/197 the survey team introduced to the
Urgun district for the verification of government property. Must mention that
security HQ of Urgun district based on missive 1025/1438 dated: 22.5.1390
attached of inquiry from municipality of that district asked for information
but the municipality has mentioned that the land for the security HQ of
Urgun district is not inclusive in master plan and there is no land for the
Urgun HQ building construction.
Though a copy of the attached missive is sent to the security HQ of Urgun district
and a copy of inquiry of Urgun municipality is sent to your honor. It will be
accomplished as of your requirement.
With regards
Paktika Provincial Police Commander
Major General Dawlat Khan
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 17 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
22/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.6 enquiry letter from Urgun District Police Commander to Urgun District Municipality.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 18 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
23/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
5.6.1 Translation of Enquiry Letter from Urgun District ANP Police Commander
Enquiry Date Reply
To Respect Municipality departmentof Urgun District,
Respected,
As in document No.35 Dated:
17.5.1390 has come from central HQ
asked to provide information
regarding the HQ building land, so
the engineer who came from the
capital to coordinate the land where
the HQ building is constructing. The
information in this regard will be
much appreciated.
With regards
Urgun District Police Commander
2nd Surveillance Mohammad Zarif
Chetarwal Sign of Commander
To respect Urgun District Police
Department,
As went through the master plan
1356 the location of Urgun Security
HQ is not inclusive in the master
plan and an enquiry sheet is alread
sent that the location of Urgun HQ
not inclusive in the master plan.
With regards
Mayor of Urgun District
Noor Mohammad
Sign & stamp of Municipality
department.
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 19 | P a g e
-
8/4/2019 (Urgun Site)Site Assessment Report.
24/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
6. PROPOSED SITE PICTURES.
Picture Present Point 1 Picture Present Point 2
Picture taken from Point 2 towards P-3(south)Picture taken from Point 3 towards Center
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 20 | P a g e
Point 1
Point 2
Point 3
CenterS
N
W E
E
W
S N
-
8/4/2019 (Urgun Site)Site Assessment Report.
25/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 21 | P a g e
t 2t 3
-
8/4/2019 (Urgun Site)Site Assessment Report.
26/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Picture taken towards P-2 & 1 center Picture taken towards P-2
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 22 | P a g e
Picture taken from Center towards P-4(East) Picture taken towards P-4(East)
Center of Proposed Site
Point 4
Center Point
Center Point
P-1P-2
P-2
Private Building
Center point
S N
N
W E
S
-
8/4/2019 (Urgun Site)Site Assessment Report.
27/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Picture taken from main road towards Proposed Site
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 23 | P a g e
Picture taken from P-2 towards P-3, P-4 Picture taken from P-2 towards P-4
P-2
P-4 P-3
P-2
P-4
Main Road from Urgun to Sarobi
Proposed Site
Urgun main road to Sarobi
Site
East
West
North
South
South
North
EW
N
S
-
8/4/2019 (Urgun Site)Site Assessment Report.
28/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Picture taken from main road towards Urgun Proposed Site(from East to West)
Picture from P-4 towards P-3(North to South) Picture taken towards Proposed Site
Site Assessment Report, UP DHQ Urgun, Paktika Province, Afghanistan 24 | P a g e
Main Road
Proposed Site
P-4
P-3
P-4Main road
Proposed site
P-4Main road
Proposed site
P-4
Main road
from urgun to
sarobi
P-3
-
8/4/2019 (Urgun Site)Site Assessment Report.
29/29
USACE (AED-N)JQ BUILDERS
Site Assessment Report
Picture of Maier & District Officer District Office
Main road from urgun to sarobi
District Officer
Maier
Main road