Venting & Inspection
Differential Venting• Entry vent is at the end of the system
• Exit vent is on the roof of the building
• A minimum difference of 10’ is needed
• If a pumping station is used, install an air bypass pipe
EnviroSepticTM
Design Considerations /
Calculations
Minimum # of Pipes = Peak Flow / 27.7 Imp. Gal (126 L)
Required Dispersal Area = Peak Flow / Infiltrative Loading Rate
Required System Sand = 12” (30cm) below AES Pipes
6” (15cm) on either side of AES Pipes
4” (10cm) above AES Pipes
Minimum Lateral Length = 20 Feet (2 Pipes)Maximum Lateral Length = 60 Feet (6 Pipes)
Treatment Capacity is the same regardless of whether it is front end
fed or Centre Fed; however, it is possible to Linear Load based on
the HLLR in Appendix A.1.E.1.
EnviroSepticTM
System Configurations
Trench System
Subsurface Installation
Above Ground
Mound Installation
Raised Sloping System
Commercial System
Low Pressure Distribution System –
Alternating Lateral Dosing
Custom Configurations