Venting & Inspection

Differential Venting• Entry vent is at the end of the system

• Exit vent is on the roof of the building

• A minimum difference of 10’ is needed

• If a pumping station is used, install an air bypass pipe

EnviroSepticTM

Design Considerations /

Calculations

Minimum # of Pipes = Peak Flow / 27.7 Imp. Gal (126 L)

Required Dispersal Area = Peak Flow / Infiltrative Loading Rate

Required System Sand = 12” (30cm) below AES Pipes

6” (15cm) on either side of AES Pipes

4” (10cm) above AES Pipes

Minimum Lateral Length = 20 Feet (2 Pipes)Maximum Lateral Length = 60 Feet (6 Pipes)

Treatment Capacity is the same regardless of whether it is front end

fed or Centre Fed; however, it is possible to Linear Load based on

the HLLR in Appendix A.1.E.1.

EnviroSepticTM

System Configurations

Trench System

Subsurface Installation

Above Ground

Mound Installation

Raised Sloping System

Commercial System

Low Pressure Distribution System –

Alternating Lateral Dosing

Custom Configurations