Reid Cunningham's of BAM FM Ecobuild 2014 presentation discussing what's now for the performance gap?

TRANSCRIPT

What we plan to do next

BIM and Government Soft Landings: achieving better operational outcomes

What Now for the Performance Gap?

Reid Cunningham

@CunninghamReid

Strategic Development Director, BAM FM

BAM FM Context

• Royal BAM and BAM UK Group

• £44m facilities management 

• 60% turnover in PFI– Public sector heath, education, law & order, public sector accommodation– Long term (25 to 30 years)– Performance / Availability– Fixed price

• 40% turnover in maintenance– Commercial sector– Static & mobile engineers/technicians

Traditional Construction Process, Knowledge and Data Transfer

Design

OperationConstruction

Soft Landings, Whole Life Cost Enabled by Collaboration, Knowledge and Transfer – (The Vision)

Design

OperationConstruction

Collaboration and Application of BIM

UK FM Context

Project Robin

Phase 1 Populate CAFM with BIM Data

Phase 2 Populate CAFM with BIM data for UCL Academy Camden

Operate Live 3D BIM using 360 Field

Operational synchronization between BIM and CAFM

Project Robin – Operational Phase2BIM360 Field – Navigation by end users

• Room or Asset listing to model or model to Room or Asset listing

• Navigational Views and hiding of Objects or separated ModelsProvides full facility to get to the equipment data for FM purposes

• ALL information available as required to FM Engineers

Project Robin – Faster First Fix

New Job received by technician via tablet

Report of Heating Issue in room 501

Technician visits room to perform checks.User has the ability to view  services within room

Technician has the ability to view plant and interrogate operatingmanuals including elements of commissioning data

Project Robin – Faster First Fix

Project Robin Faster PPM

Technician receives job card via FSI GO. This includes Asset ID and Uniclass Code.

The Asset ID enables the technicianto search for asset within BIM 360Field. 

Project Robin Faster PPM

Technician has the ability to interrogate O&M ‘s including elements of commissioning information, fault codes and supplier maintenance manuals

QR codes have been implemented to provide those without access to BIM 360 Field / FSI GO with access similar information. 