Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 22
Aside from the area surrounding the Botanicca Corporate Park in Swan Street, Burnley, up to 45%
of graduate and postgraduate skills are available within a thirty minute drive. This reflects the
distribution of the resident population across Yarra which is within the Victoria, Bridge and Swan
Street corridors and to the north and south of Alexandra Parade.
Figure 8: % of Graduate and Postgraduate Population Accessible Within 30
Minutes Drive, Yarra Focus Map, 2011
Source: SGS Economics and Planning
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
2/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 23
2.6.4 Employment by Industry (Workers)
In 2006, Yarra had a total job stock of 57,000 jobs, an increase from 52,800 jobs in 1996.
Figure 9 shows employment by industry in Yarra from 1996 to 2006. In 2006, the key sectors of
employment were Health Care and Social Assistance (9,600 jobs), Professional, Scientific and
Technical Services (6,900 jobs), and Retail Trade (6,700 jobs). This profile has changed since 1996
where the dominant sectors were Manufacturing (10,100 jobs), Health Care and Social Assistance
(8,300 jobs) and Wholesale Trade (6,200 jobs). Both Manufacturing and Wholesale Trade have
been in decline since 1996.
This indicates that the Yarra economy has been restructuring broadly in line with national trends
where inner region based manufacturing has become more efficient or has declined in absolute
terms. In many cases, traditional forms of manufacturing have been lost or relocated to more cost
competitive countries such as China.
Employment in Yarra is now linked to professional services which can support high labour costs and
derive benefits from an inner city location. Population driven sectors such as Retail Trade,
Construction, and Health Care and Social Assistance have also seen growth in employment.
Figure 9: Employment by Industry, Yarra LGA, 1996 2006
Source: ABS JTW, SGS Economics and Planning
-
2,000
4,000
6,000
8,000
10,000
12,000
Agricult
ure,ForestyandFishing
Mining
Manufacturing
Electricity
,Gas,WaterandWaste
Services C
onstruction
WholesaleTrade
RetailTrade
AccommodationandFoodServices
TransportP
ostalandWarehousing
InformationMediaand
Telecommunications
Financial
andInsuranceServices
Rental,Hiringa
ndRealEstateServices
Professional,
ScientificandTechnical
Services
Administrativ
eandSupportServices
PublicAd
ministrationandSafety
EducationandTraining
HealthCareandSocialAssistance
ArtsandRecreationServices
OtherServices
1996 2001 2006
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
3/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 24
From 1996 to 2006, Yarra saw strong growth in Professional, Scientific and Technical Services
(+4.6% p.a.), Retail Trade (+3.4% p.a.) and Health Care and Social Assistance (+1.4% p.a.). The
economy is also diversifying with sectors such as Accommodation and Food Services (+1.8% p.a.),
Financial and Insurance Services (+13.6% p.a.) and Arts and Recreation Services (+3.3% p.a.) all
increasing off a low base from 1996. Financial and Insurance Services has seen an increase of
2,700 jobs over the ten years to 2006.
In the Yarra North SLA, key growth sectors have been Financial and Insurance Services (+9.8%
p.a.), Education and Training (+2.8% p.a.), Construction (+2.8% p.a.) and Retail Trade (+2.4%
p.a.). In the Yarra Richmond SLA key growth sectors are Financial and Insurance Services
(+16.2% p.a.), Rental, Hiring and Real Estate Services (+8.1% p.a.), Arts and Recreation Services
(+7.6% p.a.) and Administrative Support Services (6.2% p.a.). In all, the Yarra - Richmond SLA
accounts for broad range of growth sectors.
These trends will have significant implications for land allocation for business and industrial uses.
The proximity of the municipality to the CBD will mean that land for office based uses could be in
higher demand whilst demand for industrial land could change to reflect a changing employment
profile. It is possible that traditional industrial land could transition to support higher order
manufacturing or mixed uses with a larger office component than what has been seen previously.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
4/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 25
Figure 10: Employment Change by Industry, Yarra SLAs, Yarra LGA, Inner Melbourne and Melbourne, 2006
Source: ABS JTW, SGS Economics and Planning
-20.0%
-15.0%
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
20.0%
Agriculture,F
orestyandFishing
Mining
Manufacturing
Electricity,
Gas,WaterandWasteServices
Construction
WholesaleTrade
RetailTrade
AccommodationandFoodServices
TransportPostalandWarehousing
InformationMediaandTelecommunications
FinancialandInsuranceServices
Re
ntal,HiringandRealEstateServices
Professional,ScientificandTechnicalServices
AdministrativeandSupportServices
PublicAdministrationandSafety
EducationandTraining
HealthCareandSocialAssistance
ArtsandRecreationServices
OtherServices
Yar ra (C ) - N or th Yar ra (C ) - R ic hmo nd Yarr a (C ) Inn er Melb ou rn e Melb ou rn e SD
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
5/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 26
Figure 11 shows the percentage of total jobs accessible within 30 minutes drive for the Melbourne
SD in 2011. Yarra is well placed adjacent to the CBD and within the CBD-eastern suburbs corridor
where 60% of all jobs are accessible within a thirty minute drive. This high quality accessibility is
related to a range of factors including high quality east-west arterial roads including Citylink and
the Monash Freeway and a high job density along the eastern corridor in employment precincts and
activity centres.
Figure 11: % of Total Jobs Accessible Within 30 Minutes Drive, Melbourne SD,
2011
Source: SGS Economics and Planning
Figure 12 shows a focus map (of the above) for Yarra. The vast majority of jobs within Yarra are
accessible within thirty minutes drive. This reflects the concentration of employment within the
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
6/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 27
western portion of the city closest to the CBD and high quality accessibility offered by road, rail and
tram corridors.
These areas also contain major activity centres and employment precincts around Cremorne,
Burnley, Richmond, and Fitzroy which account for significant employment. Areas to the north-east
are not as well integrated with the inner region and are predominantly residential or account for a
significant share of public open space (Yarra Bend Park). Around 45% of jobs in this area are
accessible within a thirty minute drive.
Figure 12: % of Total Jobs Accessible Within 30 Minutes Drive, Yarra City Focus
Map, 2011
Source: SGS Economics and Planning
Figure 13 shows the percentage of total jobs accessible within 30 minutes by public transport for
the Melbourne SD in 2011. This has been included by way of comparison with Figure 11 (total jobs
accessible by vehicle) and the comparatively lesser access offered by public transport. Yarras
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
7/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 28
position within the inner region makes it accessible to around 15-30% of total jobs although this is
less than the Melbourne CBD which is accessible to, at most, 30% of total jobs. This profile
changes as travel times become longer with those areas adjacent to the rail corridors the most
accessible to employment.
Figure 13: % of Total Jobs Accessible Within 30 Minutes by Public Transport,
Melbourne SD, 2011
Source: SGS Economics and Planning
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
8/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 29
Figure 14 shows the percentage of total manufacturing jobs accessible within thirty minutes drive
for the Melbourne SD in 2011. This map shows a tightening of employment accessibility around
key road transport routes particularly the Monash Freeway and the Tullamarine Freeway to the
north-west.
This reflects the shifting profile of this industry which is relocating to cheaper and more accessible
land in the suburbs whilst retaining elements of local manufacturing and service industry in the
inner region. Yarra City still accounts for a share of Melbournes manufacturing employment
although this is becoming more specialised and focussed around core precincts of industrial activity
within the municipality. Greater detail for Yarra is shown in Figure 14.
Figure 14: % of Total Manufacturing Jobs Accessible Within 30 Minutes Drive,
Melbourne SD, 2011
Source: SGS Economics and Planning
Figure 15 shows a focus map (of the above) for the manufacturing industry in Yarra. This reflects
the nature of manufacturing in Yarra becoming more precinct focussed around those areas which
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
9/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 30
retain a critical mass of manufacturing jobs, have sufficient accessibility, and operate in niche
markets. Increasingly, the emphasis is on small businesses which are capable of adapting or
operating within a congested environment with accessibility, land and lot size constraints.
Precincts are emerging across the municipality which have retained a core manufacturing role such
as areas around Cremorne, Burnley, and Richmond. Manufacturing in the northern suburbs of Yarra
such as in Fitzroy is fragmenting with residential development encroachment, congestion, poor
access, and lack of critical mass affecting manufacturing employment in these areas. Again, those
precincts which can operate within an increasingly congested inner region are surviving.
Figure 15: % of Total Manufacturing Jobs Accessible Within 30 Minutes Drive,
Yarra City Focus Map, 2011
Source: SGS Economics and Planning
Figure 16 shows the percentage of total logistics jobs accessible within thirty minutes drive for the
Melbourne SD in 2011. This map shows the increasing role being played by suburban locations as a
home for the logistics industry, particularly in the western region. This industry is suburbanising to
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
10/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 31
locations which offer cheaper land, access to high speed road links and access to major trading
gateways such as the Port of Melbourne and Melbourne Airport.
Logistics within the inner region still retains a strong presence but will increasingly specialise into
small scale logistics which can operate in a congested environment with growing residential
intensification.
Figure 16: % of Total Logistics Jobs Accessible Within 30 Minutes Drive,
Melbourne SD, 2011
Source: SGS Economics and Planning
Figure 17 shows a focus map for the logistics industry in Yarra. Yarra still accounts for a significant
share of Melbournes logistics industry, and in comparison to manufacturing, is more evenly
distributed across the municipality. This reflects the diversity of the logistics industry which can
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
11/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 32
consist of small to large operators and the ability of this industry to survive within a congested
inner region in close proximity to residential uses.
Areas around the Yarra River to the north and north-east have lower access to logistics jobs
reflecting accessibility and land constraints in this area. Logistics employment declines significantly
along the Eastern Freeway corridor as residential and open space uses dominate the local land use
profile.
Figure 17: % of Total Logistics Jobs Accessible Within 30 Minutes Drive, Yarra
City Focus Map, 2011
Source: SGS Economics and Planning
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
12/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 33
2.6.5 Gross Value Added by Industry
Figure 18 shows the proportional contribution of each industry to Gross Value Added (GVA) for the
Yarra SLAs, LGA, the inner Melbourne region and the Melbourne SD. The total GVA for the Yarra
(C) North SLA was 3.0 million whilst the contribution from the Yarra (C) - Richmond SLA was 2.7
million. In all, the Yarra municipality had a GVA of 5.7 million in 2008.
Figure 18: Share of Gross Value Added, 2008, City of Yarra SLAs and LGA, Inner
Melbourne, Melbourne SD
Source: ABS JTW, SGS Economics and Planning
In the Yarra (C) North SLA, the greatest contribution was from property and business services,
followed by health and community services, manufacturing, and wholesale trade. In the Yarra (C) Richmond SLA, the greatest contribution was from Property and Business Services followed by
Finance and Insurance, Health and Community Services, Wholesale Trade and Cultural and
Recreational Services.
In total, the greatest contribution to the Yarra municipal GVA was Property and Business Services,
Finance and Insurance Services, Health and Community Services, Wholesale Trade and
Manufacturing.
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
Agriculture
,ForestryandFishing
Mining
Manufacturing
Electricity,G
asandWaterSupply
Construction
WholesaleTrade
RetailTrade
Accommodation,C
afesandRestaurants
T
ransportandStorage
Com
municationServices
F
inanceandInsurance
PropertyandBusinessServices
GovernmentAdministrationandDefence
Education
Healthand
CommunityServices
CulturalandRecreationalServices
Person
alandOtherServices
Yar ra (C) - N or th Yar ra (C) - R ichmond Yar ra (C) Inne r Me lbour ne Me lbourne SD
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
13/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 34
The Yarra (C) Richmond SLA provides a greater share of Property and Business Services, Finance
and Insurance, Retail Trade, and Cultural and Recreational Services output than the Yarra (C)
North SLA. The Yarra (C) North SLA however, provides a greater contribution to Manufacturing,
Construction, Wholesale Trade, and Education industry output.
This profile is generally consistent with the inner region economy where Property and Business
Services and Finance and Insurance make the most substantial contribution to GVA, although the
contribution of Health and Community Services to inner region output is much smaller than in
Yarra. Yarra and the inner region are playing less of a role in metropolitan Manufacturing and
Transport and Storage output. This is consistent with the broader patterns of these industries
which are in decline in the inner region but are growing in output via other regions in Melbourne.
2.6.6 Export and Local Sectors
Export and local sectors within the Yarra economy can be identified through the use of location
quotient (LQ) analysis. The LQ is derived by comparing the proportion of jobs by industry in Yarra
City with the proportion of jobs by industry in Victoria. A score over 1.0 indicates an
overrepresentation of jobs in that sector, thus indicating that a quantum of those jobs is generated
by external export (non local) demand.
A score that is less than 1.0 implies that it is an import sector. This has also been done by output
for each industry. Figure 19 shows the location quotient index by employment for 2006 and Figure
20 shows the trend between 2001 and 2006 for the 1 Digit ANZSIC categories.
There were a number of industries that recorded significant location quotient scores in 2006. These
included:
Information Media and Telecommunications (2.0); Wholesale Trade (1.6);
Professional, Scientific and Technical Services (1.6);
Financial and Insurance Services (1.6);
Health Care and Social Assistance (1.6); and
Rental, Hiring and Real Estate Services (1.2).
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
14/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 35
Figure 19: Location Quotient of Industries, 1 Digit ANZSIC, Yarra City compared
to Victoria, 2006
Source: ABS Census 2001, 2006 JTW, SGS Economics and Planning
The LQ index for Yarra City has changed significantly since 2001. Yarra has consolidated its position
in Professional, Scientific and Technical Services, Information Media and Telecommunications and
Rental, Hiring and Real Estate Services.
The LQ for Health Care and Social Assistance has marginally declined from 2001 (1.7) to 2006
(1.6). The LQ for Wholesale Trade also declined from 2001 (1.7) to 2006 (1.6). These industries
nonetheless maintained their export orientation over the 5 year period.
The location quotient indexes for Finance and Insurance Services and Administrative and Support
Services exceeded 1.0 in 2006 making these industries export sectors. The strengths of the Yarra
economy are in a range of sectors where Yarra serves a regional catchment.
0.0
0.5
1.0
1.5
2.0
2.5
Agriculture,ForestryandFishing
Mining
M
anufacturing
Electricity,Gas,WaterandWaste
Services C
onstruction
WholesaleTrade
RetailTrade
AccommodationandF
oodServices
Transport,PostalandWarehousing
Informatio
nMediaand
Telecommunications
FinancialandInsura
nceServices
Rental,HiringandRealEstateServices
Professional,Scientifica
ndTechnical
Services
AdministrativeandSupportServices
PublicAdministratio
nandSafety
Education
andTraining
HealthCareandSocialAssistance
ArtsandRecrea
tionServices
O
therServices
LQ
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
15/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 36
Figure 20: Location Quotient of Industries, 1 Digit ANZSIC, Yarra City Compared
to Victoria, 2001 & 2006
Source: ABS Census 2001, 2006 JTW, SGS Economics and Planning
2.6.7 Industry Specialisation and Growth
Figure 21 is a growth share matrix for the City of Yarra in 2006 using the 2006 1-digit ANZSIC
categories. The chart shows the location quotient index for each industry (compared with Victoria)
together with the annual average change in employment by industry. The industry growth share
matrix is divided into quadrants, each quadrant defining the stage of lifecycle for the industry.
Stages in the lifecycle are illustrated in the growth share matrix as follows:
Expanding Stage: If in the top right quadrant (high average annual growth/high
specialisation).
Emerging Stage: If in the lower right quadrant (high average annual growth/lower
concentration), this implies an emerging, growing industry that may need some assistance to
mature.
Transforming Stage: If in the upper left quadrant (lower average annual growth/above
average concentration), this implies the industry is at risk (overall) and needing to increase
innovation and productivity to compete with other regions.
0.0
0.5
1.0
1.5
2.0
2.5
Agriculture,Forestryand
Fishing
Mining
Manufacturing
Electricity,Gas,Wateran
dWaste
Services C
onstruction
Wholesa
leTrade
RetailTrade
AccommodationandFood
Services
Transport,PostalandWare
housing
InformationMediaand
Tlc
icti
s
FinancialandInsurance
Services
Rental,HiringandRealEstate
Services
Professional,ScientificandTechnical
Srvics
AdministrativeandSupport
Services
PublicAdministrationan
dSafety
Educationand
Training
HealthCareandSocialAs
sistance
ArtsandRecreation
Services
Other
Services
2001 2006
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
16/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 37
Seed or Transitioning Stage: If in the lower left quadrant (lower average annual
growth/lower concentration), this implies that the industry is not growing in Yarra. This
suggests that the industry will need to innovate or specialise to retain competitiveness.
Figure 21: Growth Share Matrix, City of Yarra, By Employment (LQ withVictoria), 2006
Source: SGS Economics and Planning, ABS Census, 2006 Journey to Work
Those industries in the top right quadrant include Professional, Scientific and Technical Services,
Health Care and Social Assistance, Financial and Insurance Services, Rental, Hiring and Real Estate
Services, Accommodation and Food Services, Other Services, Administrative and Support Services,
Retail Trade and Arts and Recreation Services.
Industries in the bottom right quadrant exhibit low specialisation but strong annual average jobs
growth. Industries in this quadrant include Electricity, Gas, Water, and Waste Services, PublicAdministration and Safety, Construction and Mining.
Agriculture, Forestry and Fishing, Manufacturing, Transport, Postal and Warehousing, Education
and Training are located in the bottom left quadrant which indicates low specialisation and a
declining trend in employment since 2001. These industries should be repositioned through value
adding to ensure that Yarra retains these specialisations but can reverse current employment
trends. Information Media and Telecommunications and Wholesale Trade are located in top left
quadrant indicating high specialisation but declining growth.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
17/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 38
2.6.8 Employment Projections
SGS total employment estimates are disaggregated by Australian and New Zealand Standard
Industrial Classification (ANZSIC 06 classification). Total employment in the City of Yarra was at
approximately 52,800 in 1996, and increased to 57,000 in 2006. Almost 20% of total employment
in 2006 was accounted for by workers in Professional, Scientific and Technical Services (12.2%),
and Financial and Insurance Services (6.8%).
SGS employment forecasts indicate that total employment will continue to grow to approximately
71,300 by 2016 and 86,000 by 2026. Existing large employing industries are expected to
consolidate their share by then with Retail Trade commanding 10% of total employment share.
Professional, Scientific and Technical Services and Financial and Insurance Services are also
expected to consolidate their position at 15.2% and 12.2%, respectively. The estimated
employment projections for Yarra are shown below in Table 6.
The Melbourne employment projections were derived via use of the TRYM (Treasury
Macroeconomic Model) and data obtained from a variety of sources. Information from theAustralian Bureau of Statistics, Australian Bureau of Agricultural & Resource Economics and the
Joint Economic Forecasting Group was used by SGS to develop a set of industry projections for the
Australian economy.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
18/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 39
Table 6: Employment Projections by Industry, Yarra, 2006 26
Sector 1996 2001 2006% p.a.
(1996 - 06)2011 2016 2021 2026
% p.a.
(2011 - 26)
Agriculture, Forestry and Fishing 50 70 40 -2.2% 30 40 40 40 1.9%
Mining 10 10 10 0.0% 20 20 20 20 0.0%
Manufacturing 10,130 7,550 4,930 -6.9% 4,470 3,800 3,090 2,020 -5.2%
Electricity, Gas, Water and Waste Services 470 420 420 -1.1% 490 540 530 490 0.0%
Construction 1,620 1,800 2,080 2.5% 2,490 2,750 2,920 3,090 1.4%
Wholesale Trade 6,270 5,110 4,730 -2.8% 4,640 4,400 3,860 3,050 -2.8%
Retail Trade 4,840 5,870 6,760 3.4% 7,200 7,740 8,060 8,340 1.0%
Accommodation and Food Services 3,110 3,610 3,730 1.8% 4,420 5,400 6,080 6,850 3.0%
Transport Postal and Warehousing 1,180 1,280 1,140 -0.3% 1,250 1,110 840 680 -4.0%
Information Media and Telecommunications 2,490 2,700 2,600 0.4% 2,250 1,990 2,190 2,400 0.4%
Financial and Insurance Services 1,080 1,850 3,850 13.6% 5,120 6,240 7,800 9,700 4.4%
Rental, Hiring and Real Estate Services 590 950 1,000 5.4% 1,180 1,240 1,300 1,360 1.0%
Professional, Scientific and Technical Services 4,400 6,370 6,930 4.6% 8,270 9,550 11,030 12,060 2.5%
Administrative and Support Services 1,550 1,760 2,130 3.2% 2,120 2,180 2,210 2,210 0.3%
Public Administration and Safety 1,280 1,190 1,430 1.1% 1,470 1,590 1,700 1,820 1.4%
Education and Training 2,020 2,480 2,430 1.9% 3,040 3,370 3,570 3,690 1.3%
Health Care and Social Assistance 8,340 8,990 9,630 1.4% 11,890 15,190 19,350 23,050 4.5%
Arts and Recreation Services 660 750 910 3.3% 1,260 1,430 1,600 1,760 2.3%
Other Services 2,710 2,080 2,280 -1.7% 2,590 2,810 3,090 3,380 1.8%
Total 52,800 54,840 57,030 0.8% 64,200 71,390 79,280 86,010 2.0%
Source: SGS Economics and Planning
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
19/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 40
2.6.9 Land Projected Demand
SGS has identified core industrial jobs and land provided in the municipality at 2010 and derivedestimates for industrial land using the observed ratio between jobs and land, keeping this ratio
constant over time.
It is acknowledged that the employment to land ratio may change over time as businesses,
industrial practices and densities evolve. To capture this, sensitivity analysis has been undertaken
where the ratio between employment and land observed at 2010 is altered upwards and
downwards by a factor of 20%. Consequently, a range is provided within which the projected
demand is expected to lie.
The land area data has been derived from the Yarra Planning Scheme and GIS calculations. The
2010 employment projections are derived by a direct interpolation of jobs in 2006 (available fromthe census) and SGS employment projections for 2011.
The process of converting employment projections into land projections (for core industry) is as
follows:
Core industries are defined to include Manufacturing, Electricity, Gas, Water and Waste
Services, Wholesale Trade and Transport Postal and Warehousing.
The ratio of employment in these industries at 2010 to the core industrial land available
(IN1Z and IN3Z) at 2010 gives the employment to land utilization ratio.
Assuming this land utilization ratio remains constant, base case land requirements to 2026
are determined by taking the ratio of projected core industrial employment to the land
utilization ratio.
Two additional scenarios are developed which allow for the land utilization ratio to be
changed by 20% on either side of the base case.
The land requirements (in Ha) are shown below:
Table 7: Estimated Industrial Land Demand 2006 2026
2010 (Existing) 2016 2026Change
2010 - 26% p.a.
Base Case 82.4 74.3 47.1 -35.3 -3.4%
Upper case 92.9 58.8 -23.6 -2.1%
Lower case 61.9 39.2 -43.2 -4.5%
Source: Yarra Planning Scheme, SGS Economics and Planning
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
20/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 41
Figure 22: Core Industrial Land Demand
Source: SGS Economics and Planning
The process of converting employment projections into land projections (for business) is as follows:
Assume all industry sectors excluding the core industrial sectors as business uses.
The ratio of employment in these industries at 2010 to the core business land available
(B1Z, B2Z, B3Z, B4Z, B5Z) at 2010 gives the employment to land utilization ratio. Assuming this land utilization ratio remains constant, base case land requirements to 2026
are determined by taking the ratio of projected core industrial employment to the land
utilization ratio.
Two additional scenarios are developed which allow for the land utilization ratio to be
changed by 20% on either side of the base case.
The projected land demand (in Ha) is shown below:
Table 8: Estimated Land Demand (including Business) 2006 2026
2010 (Existing) 2016 2026Change
2010 - 26% p.a.
Base Case (B1Z) 95
Base Case (B2Z B5Z) 140.6
Base Case (Total) 235.9 280.0 362.9 127.1 2.7%
Upper case 350.0 453.6 217.8 4.2%
Lower case 233.3 302.4 66.6 1.6%
Source: SGS Economics and Planning
-
25.0
50.0
75.0
100.0
2010 (Existing) 2016 2026
Base Case Upper case
Lower case
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
21/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 42
Figure 23: Business Land Demand
Source: SGS Economics and Planning
-
150.0
300.0
450.0
600.0
2010 (Existing) 2016 2026
Hectares
Base Case Upper case
Lower case
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
22/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 43
3 SUPPLY SIDE CONDITIONS
This section describes the current floorspace and land supply conditions across the relevant zones
in Yarra and assesses the property market conditions in relation to business and industrial land in
Yarra. The Urban Development Program provides a 2009 stocktake for all industrial and Business 3Zone land and this has been used to provide a regional context. All local data for Yarra has been
sourced from Councils rates database.
3.1 Regional Context
An audit of occupied and vacant B3Z and IND1Z & IND3Z land as of 2009 and a map of these areas
is provided in the following two pages. A regional context map derived from the Urban
Development Program is provided on page 46 which shows the location of all industrial zoned land
in the region and recent developments. Key findings relating to Yarra from the audit are as follows:
There is minimal B3Z vacant land supply in the region with the Melbourne LGA accounting
for the greatest amount of B3Z land supply. In all, there were 12.8 ha of B3Z land supply
in 2009 across the region.
IND1Z vacant land supply is minimal across the region (23 ha) with Moreland (7.3 ha),
Melbourne (6.9 ha) and Darebin (5.2 ha) accounting for the greatest amounts of land
supply in this zone.
IND3Z vacant land supply is minimal across the region (21 ha) with Darebin (13.3 ha) and
Banyule (3.5 ha) accounting for the greatest amounts of land supply in this zone.
In 2009, Yarra had a total B3Z land stock of 73.8 ha comprising 72.4 ha of occupied land
and 1.4 ha of vacant land supply. Yarras total B3Z land stock was 31% of all B3Z land in
the region.
Yarra had 49.6 ha of IND1Z land comprising 49.2 ha of occupied land and 0.3 ha of vacant
IND1Z land. Yarras total IND1Z land stock was 6.5% of all IND1Z land in the region.
Yarra had 16.3 ha of IND3Z land comprising 15.8 ha of occupied land and 0.6 ha of vacant
supply. Yarras total IND3Z land stock was 4.4% of all IND3Z land in the region.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
23/30
Draft for public consultation Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 44
Figure 24: Business and Industrial Land, Yarra, 2009
Source: DPCD; Urban Development Program
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
24/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 0
Table 9: Industrial 1 & 3 and Business 3 Zone Land, Yarra and Surrounding Municipalities
B3Z IN1Z IN3Z
Supply (Ha) Unavailable (Ha) Total (ha) % of Region Supply (Ha) Unavailable (Ha) Total (ha) % of Region Supply (Ha) Unavailable (Ha) Total (ha) % of Region
Melbourne 10.8 70.4 81.2 34.0% 6.9 250.4 257.3 33.6% 0.6 12.9 13.5 3.6%
Stonnington 0.0 0.0 0.0 0.0% 0.0 0.0 0.0 0.0% 0.0 3.8 3.8 1.0%
Port Phillip 0.2 32.5 32.7 13.7% 3.1 124.0 127.1 16.6% 0.0 4.2 4.2 1.1%
Yarra 1.4 72.4 73.8 30.9% 0.3 49.2 49.6 6.5% 0.6 15.8 16.3 4.4%
Banyule 0.0 12.2 12.2 5.1% 0.2 51.3 51.5 6.7% 3.5 57.1 60.6 16.4%
Boroondara 0.0 18.6 18.6 7.8% 0.0 0.0 0.0 0.0% 0.0 0.0 0.0 0.0%
Darebin 0.0 3.1 3.1 1.3% 5.2 107.9 113.1 14.8% 13.3 171.4 184.7 50.0%
Moreland 0.4 16.6 17.0 7.1% 7.3 160.3 167.6 21.9% 3.2 82.9 86.1 23.3%
Region Total 12.8 225.8 238.6 100.0% 23.0 743.2 766.2 100.0% 21.2 348.0 369.2 100.0%
MSD 586.0 1,253.8 1,839.8 1,968.5 7,394.2 9,362.6 1,127.5 1,803.8 2,931.2
Source: DPCD, Urban Development Program
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
25/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 1
Figure 25: Regional Context Map, Yarra and Surrounding Municipalities
Source: DPCD, Urban Development Program
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
26/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 2
Melbournes Industrial Nodes
Melbournes industrial structure is generally concentrated into several major nodes. Three nodes
are located in the western region (West node, Melton node and Airport node), one in the north
(North node), one in the south (South node) and one in the outer south-east (Pakenham node).
These areas are recognised as hubs of regional and metropolitan significance which in turn reflect
the changing spatial pattern of industrial development across Melbourne. This analysis has been
included to provide a context to Yarras business and industrial areas in terms of land area and
occupancy. The Urban Development Program provides land area data for each industrial node for
2009. For the purpose of the results, Yarra is counted within the Other Areas in Metropolitan
Melbourne category. The data is provided overleaf.
Key findings are as follows:
In 2009, the industrial nodes provided 11,100 ha of land comprising 6,700 ha of occupied
land and 4,400 ha of vacant land supply. This represented 46% of all industrial land in the
metropolitan area at the time. The median take-up rate of land each year since 2004 was
221 ha per year.
Industrial land in Other Areas in Metropolitan Melbourne totalled 12,850 ha comprising
10,400 ha of occupied land and 2,450 ha of vacant land supply. The median take-up rate of
land each year since 2004 was 61 ha per year.
Total land area take up in Melbourne between 2004 and 2009 was 1,400 ha of which the
industrial nodes accounted for 1,150 ha and 265 ha in other areas of Melbourne. Thisrepresents a share of 81.3% in the industrial nodes and 18.7% in other areas of Melbourne
over that time.
This shows an overall shift of industrial development to the outer suburbs with take up
rates in the industrial nodes being three times greater than in the other areas of
Melbourne.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
27/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 3
Figure 26: Melbournes Industrial Nodes
Source: Urban Development Program
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
28/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 4
Table 10: Industrial Land Supply, Melbournes Industrial Zones, 2009
Source: DPCD, Urban Development Program, 2009
Occupied
(Hectares) Vacant (Hectares)
Total
Hectares
2004 to
2005
2005 to
2006
2006 to
2007
2007 to
2008
2008 to
2009
Average2004-
2009
Median2004-
2009
Total2004-
2009
% of
Metro
Melb
West Node 2,407.1 1,400.1 36.8% 3,807.1 108.61 91.79 83.05 109.77 74.70 93.58 91.79 467.92 33.0%
Melton Node 182.7 276.1 60.2% 458.8 5.05 3.24 -6.38 2.77 1.57 1.25 2.77 6.25 0.4%
Airport Node 400.8 250.0 38.4% 650.9 8.76 12.12 13.77 41.86 18.81 19.07 13.77 95.33 6.7%
North Node 1,568.5 1,226.6 43.9% 2,795.1 43.93 72.61 45.08 55.43 22.32 47.87 45.08 239.37 16.9%
South Node 2,054.5 975.5 32.2% 3,029.9 55.90 52.90 79.06 65.57 63.25 63.34 63.25 316.68 22.4%
Pakenham Node 91.7 271.7 74.8% 363.3 -0.67 9.74 2.36 2.04 12.70 5.23 2.36 26.16 1.8%
Total of Above Nodes 6,705.2 4,399.9 39.6% 11,105.1 221.58 242.39 216.95 277.44 193.35 230.34 221.58 1,151.71 81.3%
Other Areas in Metropolitan Melbourne 10,389.5 2,455.2 19.1% 12,844.8 71.30 65.00 35.36 61.27 31.54 52.90 61.27 264.48 18.7%
Total Metropolitan Melbourne 17,094.8 6,855.1 28.6% 23,949.9 292.88 307.39 252.31 338.71 224.89 283.24 292.88 1,416.18 100.0%
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
29/30
Yarra Business and Industrial Land Strategy / City of Yarra
Background Report endorsed by Council for public release 18-10-11.docx P. 5
3.2 Floorspace and Land Area by Zone
Yarra had approximately 1.5million square metres of business and industrial floorspace in 2010
covering approximately 223 ha of business and industrial land. Total business floorspace wasaround 1million square metres with industrial floorspace comprising approximately 480,000 square
metres. Yarra had a total of approximately 141 ha of business zoned land and 82 ha of industrial
zoned land.
The B3Z accounted for the greatest share of business floorspace (64%/678,500 square metres),
followed by the B2Z (18%/194,250 sqm). The IND1Z accounted for the greatest share of all
industrial floorspace in Yarra (81%/399,500 sqm), with the IND3Z accounting for 19% of all
industrial floorspace (89,230 sqm).
The B3Z accounted for the highest share of business zone land (62%/87.0 ha) followed by the B2Z
(20%/28.6 ha). Development within the B3Z had the highest site coverage (expressed as plot
ratio) (78%) followed by the B4Z (75%). This is expected given the purpose of the zone which
supports mixed office and manufacturing. Some showrooms and related uses also have a high site
coverage which could influence the B4Z having a high site coverage.
Table 11: Total Floorspace and Land Area by Zone, City of Yarra, 2010
ZoneFloorspace
(Square metres)% Floorspace
Share Land Area (Ha) % Land Share Plot Ratio*
B2Z 194,252 18% 28.6 20% 68%
B3Z 678,517 64% 87.0 62% 78%
B4Z 86,924 8% 11.5 8% 75%
B5Z 98,876 9% 13.5 10% 73%
Sub-Total BZ 1,058,569 100% 140.6 100% 75%
IN1Z 390,596 81% 62.5 76% 62%
IN3Z 89,237 19% 19.9 24% 45%
Sub-Total INDZ 479,833 100% 82.4 100% 58%
Grand Total 1,538,402 223.0 69%
Source: Land Areas: Yarra Planning Scheme GIS information; Floorspace: Yarra Rates Database
Note: There may be discrepancies between the above data and that of the Urban Development Program due todifferences in data collection methodologies
* Plot ratio is ratio of floorspace to site area
The B2Z is the core commercial office zone. This zone could expect to have high site coverage
within the inner region given land efficiencies which office development can realise with basement
parking or consolidated parking offsite. In 2010, the plot ratio was around 68% which suggests
some variation across office development in Yarra. Offices within activity centres could be
expected to have a higher plot ratio whilst plot ratios could be less in business park settings across
Yarra. The Botanicca Corporate Park has not reached full development capacity.
-
8/3/2019 Yarra Council - Draft Business & Industrial Land Strategy. Background Report Part 2
30/30
Yarra Business and Industrial Land Strategy / City of Yarra
B k d R d d b C il f bli l 18 10 11 d P 6
The industrial zones typically have lower site coverage, with plot ratios in the IND1 and 3 Zones
around 62% and 45%, respectively.
3.3 Land Use Mix by Zone
The following charts show the top 10 land uses by total floorspace for each zone. Key findings are
as follows:
Business 2 Zone: The top five land uses are office, showroom, factory, flat, and consulting
rooms. These uses are generally in accordance with the purpose of the zone aside from dwelling
and factory.
Business 3 Zone: The top five land uses are office, office/warehouse, factory, showroom and
dwelling. These uses are generally in accordance with the purpose of the zone aside from dwelling.
Offices and a combination of office/warehouse could be expected to locate in the Business 3 Zone.
Business 4 Zone: The top five land uses are showroom, factory, office, showroom/warehouse,
and factory/workshop. These uses are generally in accordance with the purpose of the zone aside
from dwelling. This zone is principally for bulky goods retailing and showroom type uses which
may include a warehouse or manufacturing components.
Business 5 Zone: The top five land uses are flat, office, warehouse apartment, factory/office and
dwelling townhouse. These uses are generally in accordance with the purpose of the zone aside
from dwelling townhouse.
Industrial 1 Zone: The top five land uses are office/warehouse, factory, office, warehouse, andfactory/office. These uses are generally in accordance with the purpose of the zone.
Industrial 3 Zone: The top five land uses are office/warehouse, factory/workshop, factory,
factory/office and office. These uses are generally in accordance with the purpose of the zone
aside.