ampelmann offshore personnel transfers

31
Ampelmann Offshore Access As easy as crossing the street Professional Offshore Personnel Transfers by Ampelmann

Upload: romano-groenewoud

Post on 01-Jun-2015

791 views

Category:

Business


4 download

DESCRIPTION

Ampelmann Operations is a high-tech offshore company focusing on development, construction and lease of offshore access solutions. The company was founded in 2008 as a spin-off of the Delft University of Technology. The core technology is the Ampelmann system, a motion compensation platform that allows easy, fast and safe access from a moving vessel to offshore structures, even in high wave conditions. With a doubling of the fleet every year since 2008, Ampelmann currently operates 20 systems world-wide transferring offshore crew from various types of vessels to offshore oil & gas platforms, offshore turbines, FPSO’s and all other fixed and floating structures at sea. Source: http://www.ampelmann.nl/company

TRANSCRIPT

Page 1: Ampelmann offshore personnel transfers

Ampelmann 1/30

Offshore AccessAs easy as crossing the street

Professional Offshore Personnel Transfers by Ampelmann

Page 2: Ampelmann offshore personnel transfers

Ampelmann 2/30

The Problem

Page 3: Ampelmann offshore personnel transfers

Ampelmann 3/30

The Problem

Page 4: Ampelmann offshore personnel transfers

Ampelmann 4/30

Offshore Access

• Offshore access is difficult• Turbine maintenance = important• New model wind turbines• Wind farms farther offshore

Offshore access = big issue!

Page 5: Ampelmann offshore personnel transfers

Ampelmann 5/30

Offshore Access

Horns Rev access by boat: • 1st winter: 5/7 days • 2nd winter: 1/7 days

Limited to calm weather conditions

Page 6: Ampelmann offshore personnel transfers

Ampelmann 6/30

Offshore AccessExpensive!

Costly, and requires deck

Page 7: Ampelmann offshore personnel transfers

Ampelmann 7/30

Ampelmann

Solution based on the problem:Ship is moving, structure is NOT

Page 8: Ampelmann offshore personnel transfers

Ampelmann 8/30

Ampelmann

Solution based on the problem:Ship is moving, structure is NOT

Active motion compensation

Page 9: Ampelmann offshore personnel transfers

Ampelmann 9/30

Ampelmann

Page 10: Ampelmann offshore personnel transfers

Ampelmann 10/30

Ampelmann

• Invented by 2 TU Delft PhD students

• Wind Energy Conference, Berlin 2002

• Code name “Ampelmann”

As easy as crossing the street

Page 11: Ampelmann offshore personnel transfers

Ampelmann 11/30

Applications

Maintenance on

Offshore Wind Farms

Transfer of people

Transfer of spare parts

Does it work?

Page 12: Ampelmann offshore personnel transfers

Ampelmann 12/30

Proof of Concept

Page 13: Ampelmann offshore personnel transfers

Ampelmann 13/30

Proof of Concept

Page 14: Ampelmann offshore personnel transfers

Ampelmann 14/30

Proof of Concept

The concept works!

Page 15: Ampelmann offshore personnel transfers

Ampelmann 15/30

Proof of Concept

• Show that it works offshore & full-scale

• Prove that the system is safe

• Test the capabilities of the system

Build a prototype!

Page 16: Ampelmann offshore personnel transfers

Ampelmann 16/30

Project

David Cerda Salzmann- R & D

- PhD Ampelmann

Frederik Gerner- R & D Hydraulics

- Finance

Jillis Koch- Sales & Marketing

Jan van der Tempel- CEO

- inventor

Arjan Göbel- R & D Control

Page 17: Ampelmann offshore personnel transfers

Ampelmann 17/30

Team

David Cerda Salzmann- R & D

- PhD Ampelmann

Frederik Gerner- R & D Hydraulics

- Finance

Jillis Koch-Safety

- Sales & Marketing

Jan van der Tempel- CEO

- inventor

Arjan Göbel- R & D Control

Page 18: Ampelmann offshore personnel transfers

Ampelmann 18/30

Design Requirements

• Cylinder stroke 2 meter

• Foot print 6 x 6 meter

• 50 meter vessel

• Hs = 2.5 m (workability 93%)

Page 19: Ampelmann offshore personnel transfers

Ampelmann 19/30

Ampelmann Requirements

• High workability through design

• No modification to structure

• Personnel & spare parts

• Heavy loads

Page 20: Ampelmann offshore personnel transfers

Ampelmann 20/30

Design

Payloads:

Gangway: 2 ton

Central load: 4 ton

Central load: 10 ton

Page 21: Ampelmann offshore personnel transfers

Ampelmann 21/30

Safety

• Fail-operational philosophy

• Redundant system

Page 22: Ampelmann offshore personnel transfers

Ampelmann 22/30

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Page 23: Ampelmann offshore personnel transfers

Ampelmann 23/30

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Components in fabricationSafety system in developmentProgramming control systemLloyd's Certification

Page 24: Ampelmann offshore personnel transfers

Ampelmann 24/30

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Testing this summer

Page 25: Ampelmann offshore personnel transfers

Ampelmann 25/30

Planning

Sept 2006 Sept. 2007

FinancePrototype

R & D Shell, Smit, Heerema

Design

Construct

Order components

Onshore testing Offshore testing

Safety & certification

Interest clients

Dem

o

Start company

Commercialize aftersuccessful demo

Page 26: Ampelmann offshore personnel transfers

Ampelmann 26/30

Motion Platform

Page 27: Ampelmann offshore personnel transfers

Ampelmann 27/30

Gangway

Length: 9-16 meterYaw: 2 x 180 degreesPitch: +/- 20º

Page 28: Ampelmann offshore personnel transfers

Ampelmann 28/30

Components

Page 29: Ampelmann offshore personnel transfers

Ampelmann 29/30

Offshore Testing

Page 30: Ampelmann offshore personnel transfers

Ampelmann 30/30

Ampelmann System

Page 31: Ampelmann offshore personnel transfers

Ampelmann 31/30

Film