an epc contractor supplying containers, modules and · pdf filean epc contractor supplying...

17
COMPANY PRESENTATION TRANS CONSTRUCTION AS AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND OTHER WELDED CONSTRUCTIONS FOR THE OFFSHORE AND ONSHORE INDUSTRY FOR THE OFFSHORE AND ONSHORE INDUSTRY Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway. Tel no : +47 63 92 45 00. web : www.atcno.com 1

Upload: tranliem

Post on 06-Feb-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

COMPANY PRESENTATION

TRANS CONSTRUCTION AS

AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND OTHER WELDED CONSTRUCTIONS 

FOR THE OFFSHORE AND ONSHORE INDUSTRYFOR THE OFFSHORE AND ONSHORE INDUSTRY

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 1

Page 2: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Key Data

Established : 1976Experience : 37 yearsEmployees : 20Location : Dal,10 mins from airportOffice space in Dal : 750 m2Production area in Dal : 540 m2Production area in Dal : 540 m2

94

7080 ?

Turnover in NOK (mill)70

55?

2011 2012 2013 2014 (Est)

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 2

QA system certified to ISO 9001 : 200890 % of turnover to Oil + Gas Industry

Page 3: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Company Organisation Chart – 01.11.12

Managing Director

Bjørn Tømte

Accounts

Inger Baeate Tokvam

QA / HSERune Karlsson

Business Development -Sales

Bjørn TømteJohn Leffmann

Engineering/IT-manager

Kjell Martinsen

Workshop manager

Rune Tømte

Project Execution

John Leffmann

Engineering

Kjell MartinsenJ h L ff

PurchasingProject managers/Engineers/

DocumentationJohn LeffmanRune KarlssonJohn Leffmann

Kjell Håkon RudGregory Kosel

Anders SandbergRannveig Helen Ekløv

Bård RundhaugenDaniel Koch

Mateusz NowosieleckiMarcus Isaksson

Workshop/stores

Eivind Bustad

Rune KarlssonGregory Kosel

Rannveig-Helen EkløvAnders SandbergMaria Deenihan

Marcus IsakssonDiana Carvalho

Surface Treatment

Bå d R dh

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 3

Bård Rundhaugen

Page 4: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Capabilities

Engineering

3D Design:

Materials:• Mild steel• Stainless steel

Outfitting

• Windows and doors + 3D Design:• All new projects are designed

using Autodesk Inventor

3D Analyses:

• Stainless steel• Aluminum

Certification:• 3rd party cerification of

• Windows and doors + emergency hatches to specific client requirements

• Insulation, cladding, noise reduction and fireproofing.3D Analyses:

• 3D frame analysis is performed using STAAD PRO

• 3D FEM analysis is performed using solid works simulations

• 3rd party cerification of structural calc.

• European Welding Engineers.

• Certified Welders

• Different types of floor covering, Vinyl antistatic or regular, aluminum or steel with or without antiskid.Pi /V til ti t ti

g

Documentation:• We use ProArc to keep track of

our documentation

Certified Welders• Certified Welding

Procedures, including NORSOK

• Weld testing NDE/NDT

• Pipe /Ventilation penetrations.• Outfitting, including furniture to

clients specification.• Internal Electrical installation

with simple hook up via MCT’s• Normal documentation follows

NS5820 and NORSOK.• Certification for offshore

lifting DNV 2,7-1 and DNV 2,7-3

• Certificates for Offshore k

with simple hook up via MCT s.• HVAC, design, supply and

installation• Telecom supply + Installation.• Fire and gas/Instrumentationwork. Fire and gas/Instrumentation• Fire Fighting(Sprinkler systems)• Mechanical completion, Testing

+ Commissioning

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 4

Page 5: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

BUSINESS AREAS

3 MAIN AREAS

Standard Container SolutionsStandard modules often based on ISO 668 20 30 and 40 foot Standard modules often based on ISO 668 20, 30 and 40 foot freight sizes. Outfitting to customers specifications.

Oversized/Customised Container SolutionsOversized/Customised Container SolutionsCustom-built modules specifically designed to meet the customers own requirements. Limitations depend on location of site and crane capacity.

Welded constructionsAdditional forms of welded constructions, ranging from pump

skids, control cabins, noise enclosures, access platforms and spreader frames.

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 5

Page 6: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

TYPICAL PRODUCTS – Standard Container Solutions

CERTIFIED IN ACCORDANCE WITH EN. 12079 / DNV 2.7‐1

Size( L x W x H mm)

Type (Foot)

Max Gross weight

2991 x 2438 x 2800 10’ 10 T2991 x 2438 x 2800 10 10 T

2991 x 2438 x 2850 10’ 16 T

6058 x 2438 x 2800 20’ 10T

6058 x 2438 x 3000 20’ 14,3T

6058 x 2438 x 2850 20’ 16T20 ’ Container, modified 20 ’ Trafo Container with Ventilation unit on roof

6058 x 2438 x 2850 20 16T(CSC approved)

6058 x 2438 x 3065 20’ 24T

20’ storage container for Lifting equipment

Standard 10 ’ Containers to DNV 2.7‐1

20  storage container for Lifting equipment

20’ Workshop container with crane + HVAC

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

10’ Offshore zone 2 Container20’ Offshore  workshop /Service Container

6

Page 7: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

TYPICAL PRODUCTS – Custom Made Solutions

Rest Container  for Valhall  Paint shop Container  for Kristin Laboratory Container  for Volve

7600 x 3600 x 3480 mm, 20,700 kg. 

Fully equipped to perform laboratory6000 x 2500 x 3300 mm 10 160 kg

7700 x 4500 x 3400 mm, 15,900 kg. 

5 separate rooms including smoking/non smoking toilets + Kitchen

Fully equipped to perform laboratory tests on oil and water streams and other samples essential to ensuring regular and safe running of equipment on the platform

6000 x 2500 x 3300 mm, 10,160 kg. 

The container included a paint spray cabinet, storage cabinets, 2 wash basins and an eye washer

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

smoking, toilets + Kitchen

7

Page 8: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

TYPICAL PRODUCTS – Custom Made Solutions

Trafo Container  for Oseberg Sør  VSD Container for Mongstad Generator Container for FPSO

7400 x 3500 x 3300 mm, 16,400 kg. 

Included 63 kw split unit with air cooled condensers in end section

10000 x 4000 x 3500 mm, 38,240 kg.

The container included a Caterpillar generator and 9000 L day tank fresh

10800 x 7100 x 4770 mm, 60,000 kg. 

The container included an air lock, 2 VSD’s, transformer 400V switchboard + 230 v UPS

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

condensers in end section generator and 9000 L day tank, fresh air and cooling ventilation. 

transformer, 400V switchboard + 230 v UPS

8

Page 9: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

TYPICAL PRODUCTS – Other Welded Constructions

Custom built refrigerated storage containerPowerplant, made up of 8 containers, for use at South Pole

Control Cabin

Noise enclosure for Pumps, split into elements and delivered as flat pack.

f d b l l d ll h l

Custom built basket for transport

Aluminium Access Platform

If your company need a custom built unit, please contact us and we will try to help you to find a cost efficient solution to fulfill your requirements.

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 9

Page 10: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

KEY COMPETENCE and FOCUS AREA

Larger Multi‐discipline challenges

POWER CONTROL MODULES

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 10

Page 11: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Job Report - Pazflor Power Control Module (Angola)

Total size  : 15500 x 7000 x 8000 (L x W x H)Dry Weight  : 120 metric tonnes

liDelivery  : 2009

Scope of supply included :•All engineering including strength and weight calculations•All engineering including strength and weight calculations.

•Designed to withstand a blast load of 0.4 bar. 

•Surface treatment according to NORSOK M 501 system 1•Surface treatment according to NORSOK M‐501 system 1

•Design and installation of a complete fresh air and overpressure ventilation system, including 3x100 kw HVAC units to remove the heat load from customer equipmentunits to remove the heat load from customer equipment. 

•Lifting equipment, roof railings, ladders.

•Full Offshore documentation according in accordance with•Full Offshore documentation according in accordance with clients requirements.

•Verification by DNV

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 11

Page 12: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Job Report - Clov Power Control Module

Total size  : 17850 x 8050 x 5900 (L x W x H)Dry Weight   : 257 metric tonnesDelivery : 2012

3 D drawing of complete module

Skidding upper module into workshop

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

Transport to Norway for outfitting Installation of HVAC Units

12

Page 13: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Latest project- Girassol Power Control Module (2197)

Total size  : 23630 x 6500 x 10700 (L x W x H)Dry Weight  : 460 metric tonnes (Incl equipment)Delivery : 2013

Trans Construction are responsible for the design of the structure and the PCM shall also y gbe designed to withstand a top lift of two additional modules, resulting in a total lift of 850 tonnes.

The module will have H60 fire rating and beThe module will have H60 fire rating and be designed for 0,4 barg blast loads from all sides, as well as a drag load of 0,2 barg.

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

3 D drawing of complete module

13

Delivery is scheduled for Summer 2013

Page 14: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Latest project- Draugen PCM (2691)

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

Page 15: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Oseberg B - Flat Pack module

Total size  : 11100 x 3220 x 4210 (L x W x H)Dry Weight   : 23 metric tonnesDelivery : 2011

All individual elements had to fit through a door opening 1600 x 2100 mm (w x h). 23 containers were filled with individually marked items, all cross referenced to the installation procedure

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

Framework during assembly Aluminium maintenance platform

15

Assembly work nearing completion

Page 16: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

2801 : Oseberg B – 2 switchgear modules

Total size  : Each module 6,1 x 5,85 x 5,2m (L x W x H)Weight (MGM)    : Each module approx 35 metric tonnesDelivery : Summer 2012, on schedule.

2 off AISI 316L Containers A0/A60 containing switchgear equipment , to be mounted on an extended platform on Oseberg B. Main entrance by pneumatic sliding door.g y p g

3D model of the design Fire testing at Sintef

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com

Final destination being lifted on board Oseberg B

16

The 2 completed modules loaded on board the supply boat.

Page 17: AN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND · PDF fileAN EPC CONTRACTOR SUPPLYING CONTAINERS, MODULES AND ... • Aluminum Certification: ... •Surface treatment according

Summary

Close cooperation and a clearly identified work interface / split of Close cooperation and a clearly identified work interface / split of scope of scope leads to successful project execution.

Together with yourselves we will endevour to design, calculate, draw, fabricate, procure, outfit, test and commission in accordance with your specific requirementswith your specific requirements.

TRANS CONSTRUCTION ASOur expertise lies with modular containerized solutions

TRANS CONSTRUCTION AS

Visit us on our web-site www.atcno.com

Trans Construction AS, Vognvegen 2 A/B, Ørn Industriområde, 2072 Dal, Norway.  Tel no : +47 63 92 45 00.  web : www.atcno.com 17