an introduction of cost estimation course
DESCRIPTION
AN INTRODUCTION OF COST ESTIMATION COURSE. By: Sativa Civil and Planning Education Department Engineering Faculty Yogyakarta State University. Earthquake, 26 th May 2006. Why there were so many damaged buildings?. The causes of the damage. -The strength of the earthquake - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/1.jpg)
AN INTRODUCTION OF COST ESTIMATION COURSE
By: SativaCivil and Planning Education Department
Engineering FacultyYogyakarta State University
![Page 2: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/2.jpg)
Earthquake, 26th May 2006
![Page 3: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/3.jpg)
Why there were so many damaged buildings?
![Page 4: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/4.jpg)
The causes of the damage
-The strength of the earthquake-The age of the old buildings
- The weakness of the building construction
/ Unqualified building construction
![Page 5: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/5.jpg)
WHY THERE ARE SO MANY UNQUALIFIED BUILDING CONSTRUCTION ?
• MISSPLANNED CONSTRUCTION• UNPLANED CONSTRUCTION• BOTH OF THEM, SOMETIMES DUE TO
MINIMIZING THE COST WITHOUT CONSIDERING THE STRENGHT
![Page 6: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/6.jpg)
SO, IT IS IMPORTANT TO STUDY
THE COST ESTIMATION
OF COSTRUCTION PROJECT
![Page 7: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/7.jpg)
WHAT IS COST ESTIMATION SUBJECT?
• DISCUSSING THE VARIETY OF COST ESTIMATION IN CONSTRUCTION PROJECT
• EXPLAINING THE PROCESS OF COST CALCULATION IN A CONSTRUCTION PROJECT
• BESIDE THAT, ALSO STUDYING PROJECT RESOURCES AND RELATED ASPECTS,DUE TO THEIR ROLES IN ESTIMATING THE COST OF CONSTRUCTION PROJECT
![Page 8: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/8.jpg)
WHAT KIND OF COST?the cost for the plannerThe cost for the constructorThe cost for the supervisorGlobal cost estimation Engineer’s & Owner’s Estimation Cost Budget /RAPCost Estimate / RAB
![Page 9: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/9.jpg)
REFERENCES
• Construction Project Cost Management – Asiyanto
• Rencana dan Estimate Real of Cost – Bachtiar Ibrahim
• Pedoman Standarisasi dan Pedoman Operasional Penyelenggaraan Pembangunan Gedung Negara – Dirjen Cipta Karya. Dep Kimpraswil
![Page 10: AN INTRODUCTION OF COST ESTIMATION COURSE](https://reader035.vdocument.in/reader035/viewer/2022062501/56816274550346895dd2e46e/html5/thumbnails/10.jpg)
FINAL SCORE ASPECTS
• ATTENDANCE• PERSONAL PERFORMANCE• ASSIGNMENT & PRESENTATION• MIDTERM EXAMINATION• FINAL EXAMINATION