Page 1: Analysis of License Issue and CE Congestion for Raj

CE Congestion Analysis

RAJASTHAN CIRCLE

Prepared By:Yash Sinha ,UMTS TEAM Rajasthan CircleDate : 29/09/2012

Page 2: Analysis of License Issue and CE Congestion for Raj

Major Issue observed :

The increasing UL Traffic for the R99 and HSPA Services has impacted the NQI , since the UL CE cong. was pegged and contributed towards the low access rate. Details of Jaipur and Ajmer RNC is as below.

Page 3: Analysis of License Issue and CE Congestion for Raj
Page 4: Analysis of License Issue and CE Congestion for Raj

The below BAR chart indicates the Success Rate for RRC, HSDPA, HSUPA and R99:

196

96.5

97

97.5

98

98.5

99

99.5

100 99.8024731109556

98.4904702626268

97.5929835959071

98.5574525225398

RRC Success Rate HSDPA Success Rate HSUPA Success Rate PS R99 Success Rate

194

95

96

97

98

99

10099.5417210540416

96.9988247721567

96.2204855799983

97.4544423172375

RRC Success Rate HSDPA Success Rate HSUPA Success Rate PS R99 Success Rate

Jaipur RNC , 30.8.2012 DBH Hour

Ajmer RNC , 30.8.2012 DBH Hour

Page 5: Analysis of License Issue and CE Congestion for Raj

Now we dig up the major cause for the RAB Failure in PS Mode , and found that the RAB Failure was mainly due to UL CE cong. Details of RAB Failure in Ajmer RNC :

Details of RAB Failure in Jaipur RNC :

1602268

638

VS.RAB.FailEstabPS.TNL VS.RAB.FailEstabPS.ULCE.CongVS.RAB.FailEstabPS.ULIUBBand.Cong VS.RAB.FailEstabPS.ULPower.CongVS.RAB.FailEstabPS.UuNoReply

Page 6: Analysis of License Issue and CE Congestion for Raj

Below is the list of sites which were having PS RAB , RRC cong. The Card relocation and addition was done for the sites indicated in green color which reduced the overall CE Cong. in Jaipur RNC.

KPI Snap shot for the sites under CE cong. :

Page 7: Analysis of License Issue and CE Congestion for Raj

Major Breakthrough achieved for the congestion removal :

1. CE Hardware addition. 2. LDR Parameter change.3. User BIT Rate reduction.4. Parameter optimization for Power and Code Cong. removal.5. Physical Optimization activity performed on the cells.

The details of each breakthrough and impact observed after the changes is covered as below :

Page 8: Analysis of License Issue and CE Congestion for Raj

1.1.1 CE HARDWARE ADDITION:

CE hardware addition performed on top 10 priority sites of which 5 cards were taken from switched off sites (Near to school) , 4 card from spares and 1 from non operational site(SMS Hospital). The sample of PRE and POST KPI observed after the CE Card addition is as below.

KPI OF Kumbhamarg before CE card addition:

Page 9: Analysis of License Issue and CE Congestion for Raj

Post KPI of Kumbhamarg Site after the CE card addition: the below graph indicates that the major improvement has been observed after the CE Card addition on the sites having high CE Cong. ratio on RRC and RAB. It is due to the High CE requirement for HSUPA and R99 Services.

Page 10: Analysis of License Issue and CE Congestion for Raj

1.1.2 LDR Parameter Changes :

LDR Parameter changes performed in the Jaipur and Ajmer RNC dated 26th Sept 2012 , after which the Ajmer RNC success rate increased by approx 10 % and Jaipur RNC increased by 1.2 %

HSDPA , HSUPA , R99 Access Success Rate since 27th Aug 2012.

24-Aug 29-Aug 3-Sep 8-Sep 13-Sep 18-Sep 23-Sep 28-Sep 3-Oct60.00

65.00

70.00

75.00

80.00

85.00

90.00

95.00

100.00

81.08

88.21

79.9582.2781.5982.27

84.56

89.4487.32

83.71

87.76

84.1085.7284.39

80.8081.47

76.72

82.7381.46

85.69

78.38

72.05

66.05

71.3972.4475.86

71.0372.4773.21

77.08

88.6589.37

RC-G-AJMR-RNC-01-HU RC-G-JIPR-RNC-01-HU

HSDPA + HSUPA + R99 Access Success Rate

09/13/2012 23:00

09/14/2012 23:00

09/15/2012 23:00

09/16/2012 23:00

09/17/2012 23:00

09/18/2012 23:00

09/19/2012 23:00

09/20/2012 23:00

09/21/2012 23:00

09/22/2012 23:00

09/23/2012 23:00

09/24/2012 23:00

09/25/2012 23:00

09/26/2012 23:00

09/27/2012 23:00

09/28/2012 23:000

1000

2000

3000

4000

5000

6000

PAYLOAD TREND FOR AJMER RNC FOR DBH HOUR

HSUPA Payload(MB) PS R99UL Payload(MB)

Payload in Mb

Page 11: Analysis of License Issue and CE Congestion for Raj

Site wise analysis where the LDR parameters were changed in the Ajmer RNC :

It can be clearly seen as per the above graph that the VS.RAB.FAILESTABPS.UL.CE.CONG. counter value has been decreased significantly after the changes implemented on 26th Sept 2012 , these sites were contributing the 80 to 90 % of CE cong at the RNC level.

Page 12: Analysis of License Issue and CE Congestion for Raj

1.1.3 User BIT Rate reduction:

2. Parameter impact details

The below graph indicates the Average no. of Radio bearers hourly in the UL direction for Background and Interactive class before the Parameter changes.

09/12/2

012 00:0

0

09/12/2

012 02:0

0

09/12/2

012 04:0

0

09/12/2

012 06:0

0

09/12/2

012 08:0

0

09/12/2

012 10:0

0

09/12/2

012 12:0

0

09/12/2

012 14:0

0

09/12/2

012 16:0

0

09/12/2

012 18:0

0

09/12/2

012 20:0

0

09/12/2

012 22:0

00

500

1000

1500

2000

2500

VS.RB.PS.Bkg.UL.32

VS.RB.PS.Bkg.UL.64

VS.RB.PS.Int.UL.32

VS.RB.PS.Int.UL.64

The below graph indicates the Average no. of Radio bearers hourly in the UL direction for Background and Interactive class After the Parameter changes.

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

00

200

400

600

800

1000

1200

1400

1600

1800

2000

VS.RB.PS.Bkg.UL.32

VS.RB.PS.Bkg.UL.64

VS.RB.PS.Int.UL.32

VS.RB.PS.Int.UL.64

The changes at the RNC for the parameter UlBeTraffInitBitrate setted to D32 was done at 16:00 Hrs.

Page 13: Analysis of License Issue and CE Congestion for Raj

After the changes we can clearly see that the 64 RB has reduced on both Bkg , Interactive and 32 RB has take the initial call attempts from 64 RB.

The Below graph indicates the Payload (MB) and R99 Throughput (bps) , It can be clearly seen from the below graph that the PS 128 UL Payload increases as the Busy Hour approaches since the data download and the CE bit rate reduction is functional.

09/13/2

012 01:00

09/13/2

012 03:00

09/13/2

012 05:00

09/13/2

012 07:00

09/13/2

012 09:00

09/13/2

012 11:00

09/13/2

012 13:00

09/13/2

012 15:00

09/13/2

012 17:00

09/13/2

012 19:00

09/13/2

012 21:00

09/13/2

012 23:000

500100015002000250030003500400045005000

0

5

10

15

20

25

30

35

40

PS128 R99UL Pay-load(MB)

PS384 R99UL Pay-load(MB)

PS64 R99UL Payload(MB)

VS.P-S.Through-put.UL64.bps

The below chart indicates the LDR BE Rate reduction and the UL R99 Payload.

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

00

50

100

150

200

250

300

010002000300040005000600070008000900010000

VS.L-CC.L-DR.UL.BE-Rate-Down

PS R99UL Pay-load(MB)

Page 14: Analysis of License Issue and CE Congestion for Raj

Hourly details of PS RB : The below graph will indicate the PS RB Details at diff. hours on 13th Sept 2012.

The below bar chart indicated the Average RB Users on the diff. SF.

1. Bar Chart Indicating the RB @ 13/09/2012, 16:00 Hrs

Series1

The above chart indicates the high UL 64 RB as Initialbit rate was UL64.

2. Bar Chart Indicating the RB @ 13/09/2012 , 19:00 Hrs

VS.R...

VS.R...

VS.

VS.R...

VS.

VS.R...

VS. VS.0

200

400

600

800

1000

1200

Series1

The above chart indicates the high UL 32 RB as Initialbit rate after implementation.

Page 15: Analysis of License Issue and CE Congestion for Raj

3. Bar Chart Indicating the RB @ 13/09/2012 , 23:00 Hrs

VS.RB.P

S.Bkg

.UL.1

28

VS.RB.P

S.Bkg

.UL.1

44

VS.RB.P

S.Bkg

.UL.1

6

VS.RB.P

S.Bkg

.UL.2

56

VS.RB.P

S.Bkg

.UL.3

2

VS.RB.P

S.Bkg

.UL.3

84

VS.RB.P

S.Bkg

.UL.6

4

VS.RB.P

S.Bkg

.UL.8

0

200

400

600

800

1000

1200

Series1

The above chart indicates the high UL 32 and UL 64 RB at DBH Hour, after implementation.

Page 16: Analysis of License Issue and CE Congestion for Raj

3. Congestion analysis on the RNC level:

The below chart indicate the impact of Parameter changes on the RNC Level.

1. RNC WISE RRC and RAB Cong. Analysis on 13th Sept 2012 :

09/13/2

012 00:00

09/13/2

012 02:00

09/13/2

012 04:00

09/13/2

012 06:00

09/13/2

012 08:00

09/13/2

012 10:00

09/13/2

012 12:00

09/13/2

012 14:00

09/13/2

012 16:00

09/13/2

012 18:00

09/13/2

012 20:00

09/13/2

012 22:00

09/14/2

012 00:00

09/14/2

012 02:00

09/14/2

012 04:00

09/14/2

012 06:00

09/14/2

012 08:000

500

1000

1500

2000

2500

3000

3500

4000

4500

VS.RRC.Rej.ULCE.Cong

VS.RAB.-FailEstabCS.ULCE.-Cong

VS.RAB.-FailEstabPS.ULCE.-Cong

The PS RAB Cong. Due to UL CE was 4253 @ 22:00 Hrs and 2332 @ 23:00 Hrs (DBH)

If we compare the DBH hour data of 13th and previous days we find a reduction of around 3K .

Page 17: Analysis of License Issue and CE Congestion for Raj

2. RNC WISE RRC and RAB Cong. Analysis on 12th and 11th Sept 2012 :

09/11/2

012 00:00

09/11/2

012 03:00

09/11/2

012 06:00

09/11/2

012 09:00

09/11/2

012 12:00

09/11/2

012 15:00

09/11/2

012 18:00

09/11/2

012 21:00

09/12/2

012 00:00

09/12/2

012 03:00

09/12/2

012 06:00

09/12/2

012 09:00

09/12/2

012 12:00

09/12/2

012 15:00

09/12/2

012 18:00

09/12/2

012 21:00

0

2000

4000

6000

8000

10000

12000

14000

VS.RRC.Rej.ULCE.Cong

VS.RAB.-FailEstabCS.ULCE.-Cong

VS.RAB.-FailEstabPS.ULCE.-Cong

Page 18: Analysis of License Issue and CE Congestion for Raj

3. Radio Bearer analysis on the Site level:

The below details will focus on the PS UL CE cong. analysis on the site level.

1. RB wise details @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

00

5

10

15

20

25

30

VS.RB.PS.Bkg.UL.32VS.RB.PS.Bkg.UL.64VS.RB.PS.Int.UL.32VS.RB.PS.Int.UL.64

2. RB wise details @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

00

5

10

15

20

25

30

VS.RB.PS.Bkg.UL.32VS.RB.PS.Bkg.UL.64VS.RB.PS.Int.UL.32VS.RB.PS.Int.UL.64

Page 19: Analysis of License Issue and CE Congestion for Raj

4. UL CE Cong. analysis on the Site Ghatgate(win5):

1. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

09/12/2

012 00:00

09/12/2

012 02:00

09/12/2

012 04:00

09/12/2

012 06:00

09/12/2

012 08:00

09/12/2

012 10:00

09/12/2

012 12:00

09/12/2

012 14:00

09/12/2

012 16:00

09/12/2

012 18:00

09/12/2

012 20:00

09/12/2

012 22:00

0

50

100

150

200

250

300

VS.RRC.Re-j.ULCE.Cong

VS.RAB.-FailEstabC-S.ULCE.Cong

VS.RAB.-FailEstabP-S.ULCE.Cong

PS R99UL Pay-load(MB)

2. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

Page 20: Analysis of License Issue and CE Congestion for Raj

09/13/2

012 00:00

09/13/2

012 02:00

09/13/2

012 04:00

09/13/2

012 06:00

09/13/2

012 08:00

09/13/2

012 10:00

09/13/2

012 12:00

09/13/2

012 14:00

09/13/2

012 16:00

09/13/2

012 18:00

09/13/2

012 20:00

09/13/2

012 22:00

09/14/2

012 00:00

09/14/2

012 02:00

09/14/2

012 04:00

09/14/2

012 06:00

09/14/2

012 08:00

09/14/2

012 10:00

020406080

100120140160180200

0

50

100

150

200

250

300 VS.RRC.Re-j.ULCE.-CongVS.RAB.-FailEstabCS.ULCE.-CongVS.RAB.-FailEstabPS.ULCE.-CongPS R99UL Payload(MB)

3. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

09/12/2

012 00:0

0

09/12/2

012 02:0

0

09/12/2

012 04:0

0

09/12/2

012 06:0

0

09/12/2

012 08:0

0

09/12/2

012 10:0

0

09/12/2

012 12:0

0

09/12/2

012 14:0

0

09/12/2

012 16:0

0

09/12/2

012 18:0

0

09/12/2

012 20:0

0

09/12/2

012 22:0

00

2

4

6

8

10

12

14

J Congestion Analysis -RRC Congestion Ratio

J Congestion Analysis - PS RAB Congestion Ratio

4. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

Page 21: Analysis of License Issue and CE Congestion for Raj

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

0

09/14/2

012 10:0

00

1

2

3

4

5

6

7

8

J Conges-tion Analysis -RRC Con-gestion Ratio

J Conges-tion Analysis - PS RAB Conges-tion Ratio

5. UL CE Cong. analysis on the Site SITAPURA :

1. UL CE Cong. @ 12th Sept 2012 of site SITAPURA having high Cong. in UL.

09/12/2

012 00:0

0

09/12/2

012 02:0

0

09/12/2

012 04:0

0

09/12/2

012 06:0

0

09/12/2

012 08:0

0

09/12/2

012 10:0

0

09/12/2

012 12:0

0

09/12/2

012 14:0

0

09/12/2

012 16:0

0

09/12/2

012 18:0

0

09/12/2

012 20:0

0

09/12/2

012 22:0

00500

100015002000250030003500400045005000

0

20

40

60

80

100

120VS.RRC.Rej.ULCE.Cong

VS.RAB.FailEstabCS.ULCE.Cong

VS.RAB.FailEstabPS.ULCE.Cong

PS R99UL Payload(MB)

2. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.

Page 22: Analysis of License Issue and CE Congestion for Raj

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

0

09/14/2

012 10:0

00

500

1000

1500

2000

2500

3000

3500

0

20

40

60

80

100

120

140VS.RRC.Rej.ULCE.Cong

VS.RAB.FailEstabCS.ULCE.Cong

VS.RAB.FailEstabPS.ULCE.Cong

PS R99UL Payload(MB)

3. UL CE Cong. @ 12th Sept 2012 of site SITAPURA having high Cong. in UL.

Page 23: Analysis of License Issue and CE Congestion for Raj

09/12/2

012 00:00

09/12/2

012 02:00

09/12/2

012 04:00

09/12/2

012 06:00

09/12/2

012 08:00

09/12/2

012 10:00

09/12/2

012 12:00

09/12/2

012 14:00

09/12/2

012 16:00

09/12/2

012 18:00

09/12/2

012 20:00

09/12/2

012 22:00

0

10

20

30

40

50

60

70

80

J Congestion Analysis -RRC Congestion Ra-tio

J Congestion Analysis - PS RAB Congestion Ratio

4. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.

09/13/2

012 00:0

0

09/13/2

012 02:0

0

09/13/2

012 04:0

0

09/13/2

012 06:0

0

09/13/2

012 08:0

0

09/13/2

012 10:0

0

09/13/2

012 12:0

0

09/13/2

012 14:0

0

09/13/2

012 16:0

0

09/13/2

012 18:0

0

09/13/2

012 20:0

0

09/13/2

012 22:0

0

09/14/2

012 00:0

0

09/14/2

012 02:0

0

09/14/2

012 04:0

0

09/14/2

012 06:0

0

09/14/2

012 08:0

0

09/14/2

012 10:0

00

10

20

30

40

50

60

J Conges-tion Analy-sis -RRC Congestion Ratio

J Conges-tion Analy-sis - PS RAB Congestion Ratio

6. DT ANALYSIS on the site after parameter changes :

Details Of R99 Upload during the DT , 200 MB File was being UP Loaded on the Sendspace Server.

Page 24: Analysis of License Issue and CE Congestion for Raj
Page 25: Analysis of License Issue and CE Congestion for Raj

1.1.4 Parameter optimization for Power and Code Cong. removal :

After the addition of CE card it has been observed that the Power and code cong. tends to rise sharply on the sites, so to counter that we alter the below parameters.

Page 26: Analysis of License Issue and CE Congestion for Raj

Thank You