ANASAC Meeting Title. North American ALMA Development Program Review. Michael Shannon, Program Manager 17 September 2013. FY2013 Overview. All seven (7) FY2013 Studies on track to complete by end of fiscal year Three (3) Projects ongoing - PowerPoint PPT PresentationTRANSCRIPT
ANASAC Meeting Title
North American ALMA Development Program Review
Michael Shannon, Program Manager17 September 2013
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
FY2013 Overview• All seven (7) FY2013 Studies on track to complete by end of fiscal year
• Three (3) Projects ongoing
• FY2014 Call for Study Proposals released 01 May- nine (9) Study Proposals received 12 July- Proposals in review; notification date 04
November
• FY2014/15 Call for Project Proposals released 03 June- eight (8) Project Proposals received
16 August- Proposals in review; provisional notification date 04
October- ALMA Board review and authorization 16
November
• Transition of ALMA Development Projects to JAO Operations- whitepaper prepared and released- implementation gaps identified; corrective actions in work
FY2014/15 Study/Project in review.Page 2 of 10
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
FY2013 Studies status
Need to follow up with PI’s to get Final Reports submitted.
ProjectLead
Institution
NRAO
Status
2nd Generation Receiver for Band 6
Design Study for Band 2 Cartridges
mm/submm VLBI with ALMA
Quantum Limited Amplifiers
Visualization Portal for ALMA Data
Unleashing Large Dataset Science
Band 1 Receiver Development
NRAO
NRAO
ASIAA
U. Maryland
U. British Columbia
CalTech
Page 3 of 10
Study complete.
Study complete.
Study complete.
Study tasks are complete. Final report is due.
Study tasks are complete. Final report is due.
OMT machining complete. Performance measurements in September.
Conversion loss of mixers too high. Test of IF Hybrid in September.
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Ongoing Projects status
Fiber Optic Connectivity held up by permits.
Project
Band 5 Local Oscillator Production
Fiber Optic Connectivity
ALMA Phasing Project
LeadInstitution
NRAO
JAO
MIT, Haystack
Status
Page 4 of 10
The CDMR is scheduled for 25 Sept in C-ville. A recovery schedule for LO production has been prepared; all 75 LOs will be delivered by Q3 CY2014.Silica Networks (contractor) is still awaiting the required construction permits from the Chilean public authorities.
Closure of all NRAO-assigned CDR Item Discrepancies is on track. Implementation planning (integration plan and verification matrix) in work. Fast Corrections Subsystem software integration & test in work.
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
FY2014 Study candidates
• 9 studies submitted by 5 organizations.
• Total cost of all submissions $1,140,196.
• 14% oversubscribed.
• 52% ($594,484) of requested funds from NRAO.
• 48% ($545,712) of requested funds from external organizations.
52% ($594,484) of requested funds for NRAO; 48% ($545,712) external.
Page 5 of 10
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon Page 6 of 10
Target Date for Notifications 04 November
NA ALMA Study
Awards
NA ALMA Program Director
Dev. Study
Review Panel
(External)
NA ALMA Program Manager
NA Call for
Proposals
ASAC Technolog
y Roadmap
Integrated NA ALMA
Studies Plan
Development Process - Studies• FY2014 proposal review status: Complete In work
NSF Concurrence
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
FY2014/15 Project candidates
53% ($3,970,025) of requested funds for NRAO; 47% ($3,500,744) external. Page 7 of 10
• 8 projects submitted by 5 organizations.
• Total cost of all submissions $7,470,769. 00
• 75% oversubscribed.
• 53% ($3,970,025) of requested funds from NRAO.
• 47% ($3,500,744) of requested funds from external organizations.
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Coordinating input from the ALMA scientific community.Page 8 of 10
Development Process - Projects• FY2014 proposal review status:
ANASAC EASAC ESAC
ASAC
ALMADirector
ALMABoard
EA Call for Proposals
EU Call for
Proposals
ALMADevelopm
entCoordinationWorksh
ops
IntegratedProject
PlanADSC
DirectorsCouncil
ALMADevelopment
Program Managers
NA Activities
NRAO
EA Activities
NAOJ
EU Activities
ESO
Upgrade Work Package
Upgrade Work Package
Upgrade Work Package
Upgrade Work Package
Upgrade Work Package
Upgrade Work Package
ADSC OversightADSC Coordination
NA Call for
Proposals
EA Developm
ent Project Plans
EU Developm
ent Project Plans
NA Developm
ent Project Plans
TechnicalEvaluation
IETACT
Complete In work
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Study to Project progression
Six of seven (86%) of FY13 Studies progressed to Project proposal stage. Page 9 of 10
FY13 Study
Design Study for Band 2 Cartridges
mm/submm VLBI with ALMA
Ultra-wideband Quantum Limited Amplifiers
A Visualization Portal for ALMA Data
Unleashing Large Dataset Science
LeadInstitution
ALMA Band 1 Receiver Development Study
NRAO
NRAO
U. BritishColumbia
U. Maryland
ASIAA
Follow-on FY14/15 Project Proposal
CalTech
Yes
Yes
Yes
Yes
Yes
Yes
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Maximum FY2014 commitments = $1.00M Studies + $4.3M Projects = $5.3M.
Funding Capacity
0.53
Unallocated Budget ($M)
Fiscal Year
FY2013
FY2014
FY2015
0.81
4.04
Total budget available
Committed budget: Administration
Committed budget: Studies
Committed budget: Projects
Committed budget - ALMA site fuel cost
The FY13 and FY14 Calls for Study and Project proposals are combined (consolidated) in order to synchronize budget and performance periods.
Total 5.38
Page 10 of 10
1
2
3
4
5
1
2
3
4
5
2013 2014 2015
$4.28M available $4.29M available
$5.02M available
US Fiscal Year (October to September)
$3.75M committed$3.48M committed
$1.98M committed
US
Dol
lars
($M
)
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Portfolio overview - Studies
Abiding by a balanced Study portfolio strategy.B1
Study PI
2nd Generation Receiver for Band 6
Design Study for Band 2 Cartridges
mm/submm VLBI with ALMA
Increase the ALMA Data Rate
Ultra-wideband Quantum Limited Amplifiers
A Visualization Portal for ALMA Data
Unleashing Large Dataset Science
Lead InstitutionCollaboratingInstitution(s) Funding ($US)
ALMA Band 1 Receiver Development Study
A. Kerr
E. Bryerton
J. Kern
B. Glendenning
D. Woody
E. Rosolowsky
L. Mundy
P. Ho
NRAO
NRAO
NRAO
NRAO
CalTech
U. British Columbia
U. Maryland
ASIAA
U. Virginia
U. Arizona
MIT, Haystack
U. Calgary, Harvard U.
U. Illinois, NRAO
HIA, NRAO, U Chile
TOTAL ($US)
84,045
98,119
0
0
92,498
73,438
34,320
100,000
482,42038% of total Studies funding allocated to NRAO
62% of total Studies funding allocated to collaborating institutions
NA ALMA Development Program
ANASAC Meeting; Charlottesville, Virginia; 17 September 2013M. Shannon
Portfolio overview - Projects
Abiding by a balanced Project portfolio strategy.B2
Projects PI
Band 5 Local Oscillator Production
Fiber Optic Connectivity (pending)
ALMA Phasing Project (proposed; ALMA Development funds only)
Lead InstitutionCollaboratingInstitution(s) Funding ($US)
E. Bryerton
S. Doeleman
NRAO
JAO
NRAO, MPlfR, NAOJ, ASIAA, U. Concepcion, Onsala
MIT, Haystack
TOTAL ($US)
3,328,718
1,849,001
* 516,800
J. Ibsen
6,369,519
• Total Phase 1 Program expenditures (through FY 2015) = $6,851,939
UVA Microfabrication Laboratory (proposed) A. Lichtenberger NRAOUniversity of Virginia 675,000
* An additional $3.5M will be provided by NSF/MRI
Contractor
52% of total Project funding allocated to NRAO
48% of total Project funding allocated to collaborating institutions