Status of MKSP LOFAR Observations. Andreas Horneffer. Contents. Where we are Old observations Cycle-0 observations Open Issues My list of Milestones Cycle-0 and Cycle-1 Observations. M51 E arly Image. 3C295 field. M51 closeup. M101. M51 with 3C295 as calibrator - PowerPoint PPT PresentationTRANSCRIPT
Andreas Horneffer
Status of MKSP LOFAR Observations
2
Contents Where we are
Old observations Cycle-0 observations
Open Issues My list of Milestones
Cycle-0 and Cycle-1 Observations
3
M51Early Image
M51 with 3C295 as calibrator Observed to test calibration interpolation and study M51
3C295 field M51 closeup
D. Mulcahy
M101
4
M51Better Image
D. Mulcahy
After ca. 9 months of work
5
NGC891
1 subband, basic calibration selfcal-bias source held for a real transient
6
Fan Region
FD = -5 rad/m/m FD = -2 rad/m/m
M. Haverkorn, M. Iacobelli
7
Double Double B1835+620
M. Orru
9
Prediction of Ionospheric RM from GPS data
Comparison of Ionospheric RM prediction (red) and pulsar data (blue).
Ionospheric RM prediction can be included in BBS
C. Sobey and C. Sotomayor
10
IC342
Cycle-0 regular observation data 1 Subband, basic calibration
C. van Eck
11
Open Issues
List of Milestones: Normal Imaging1. Long integrations of polarization
Multi-hour observations2. RM Cubes with absolute FD
Multi-Epoch observations3. High Resolution in FD4. Low instrumental Polarization5. High angular resolution
12
Milestone 0: Normal Imaging
Need to calibrate data: Station clocks Ionospheric delay Station gains (incl. dipole gains)
Selfcal needs good model of the sky to work Have a good sky model from e.g. MSSS Transfer solutions from a second beam on a calibrator. Be careful when using e.g. gsm.py skymodel!
Demixing, sagecal, BBS must not corrupt polarization information.
Still several Features missing in the software
13
5ns Problem Solved
LOFAR had a major hardware issue last year “5 ns” issue
This has been solved with new hardware
14
Milestone 1:Long Integrations
Needs Conversion between visibilities and Stokes parameters done correctly correct beam model -> test it with pulsar and all sky data
Needs the ability to correct for changes in the ionospheric RM calibrate on pulsars or with GPS based corrections -> GPS based corrections alone are not good enough.
15
Ionospheric RM Correction
16
Ionospheric RM Correction
18
Milestone 2:RM Cubes with absolute FD
Needed for multi-epoch observations Needs at least one calibrator with known absolute
RM Get it from studies of measured RM and e.g.
ionospheric RM from GPS Connect the position angle of a source (a blazar?) to
higher frequencies. “Assign” a RM to a calibrator and use it as reference
Propagate absolute RM to all calibrators
19
Milestone 3:High Resolution in FD
Needs wide frequency coverage -> 8-bite mode works! Multi-epoch observations for HBA low and high? Use the low-band?
Probably not…
20
Milestone 4:Low Instrumental Polarization
Good understanding of the instrument For the time being: flag out parts at RM ≈ 0
21
Milestone 5:High Angular Resolution
Needs us able to deal with long baselines. Made a start at the long-baseline BW Rely on the long baseline working group for the
time being.
22
LOFAR Cycle 0 Regular Cycle 0 observations started December
2012 Originally planned till end of August 2013 Extended till 14. November 2013
(To implement and test the new correlator.) The nearby galaxies proposal got granted:
112 hours observing time 213 hours computing time
We asked for more time due to the extension
23
LC0 Scheduling March - August
25
MKSP Clycle-0:Nearby Galaxies
Target Band Observer Requested time Observed Date UTC Time LST RangeM31 HBA (110-190) Giessuebel 8h New Time 26. Sep. 2013 20:00 – 04:00
LBA (30-88) Giessuebel 8h New Time 27. Sep. 2013 20:00 – 04:00M33 HBA (110-190) Paladino 8h New Time 9. Oct. 2013 20:00 – 04:00
LBA (30-88) Paladino 8h New Time 10. Oct. 2013 20:00 – 04:00M51 HBA (110-190) Mulcahy 8 h 22. Apr. 2013 20:00 – 04:00 10:30 – 18:30M81/M82 HBA (110-190) Adebahr 5 h 6. Mar. 2013 21:26 – 02:30 08:52 – 14:00
5 h 30. Mar. 2013 19:00 – 00:20 08:00 – 13:21LBA (30-88) Adebahr 5 h 21. Feb. 2013 21:05 – 02:10 07:40 – 12:46
5 h 31. Mar. 2013 19:00 – 00:00 08:04 – 13:05NGC891 HBA (110-190) Mulcahy Cycle-1
LBA (30-88) Mulcahy Cycle-1NGC3079 HBA (110-190) Sotomayor 0 h ---- ---- ----
NGC4631 HBA (110-190) Sotomayor 8 h 9. Apr. 2013 18:00 – 02:00 07:40 – 15:41NGC6946 HBA (110-190) Jurusik 8 h 15. Jul. 2013 20:00 – 04:00 16:02 – 00:04IC342 HBA (110-190) Mulcahy / v.Eck, Pietka 5 h 2. Feb. 2013 15:50 – 20:50 01:09 – 06:10
5 h 13. Mar. 2013 22:20 – 04:00 10:14 – 15:55LBA (30-88) Mulcahy or Adebahr 5 h 30. Jan. 2013 16:00 – 21:00 01:07 – 06:08
5 h 21. Feb. 2013 16:00 – 21:00 02:34 – 07:35M101 HBA (110-190) Heald / Toribio 8 h 9. May. 2013 19:00 – 03:00 10:38 – 18:39NGC3627/3628 HBA (110-190) Drzazga / Paladino 4 h 19. Mar. 2013 22:00 – 02:30 10:17 – 14:48
4 h 2. Apr. 2013 21:20 – 01:30 10:30 – 14:40IC10 HBA (110-190) Heesen 8 h 25. Aug. 2013 19:00 – 03:00 17:48 – 01:49
LBA (30-88) Heesen 8 h 26. Aug. 2013 19:00 – 03:00 17:48 – 01:49Holmberg 124 HBA (110-190) Nikiel-Wrochzynski --- ---- ---- ----Stephans Quintet HBA (110-190) Nikiel-Wroczynski 8 h 19. Aug. 2013 20:00 – 04:00 18:20 – 02:22
26
Cycle-0 Processing/Analysi
s Quite a bit of the MKSP Cycle-0 data is currently
only archived, but not looked at. The problems are manpower and processing
capabilities Processing (data storage) at CEP-1 only guaranteed for
4 weeks. Processing at other places (e.g. Bonn Juelich) possible
but cumbersome. For new observations: include manpower and
processing in your plans from the beginning.
27
LOFAR Cycle 1 Next observing cycle for LOFAR Planned to run for 6 months Call for Proposals planned for end of May Deadline: end of August Start of observations: 15. November
28
Summary LOFAR is reliably taking science data
Still a lot of manual work but getting better Data quality has improved Still many features missing in the software. Calibration quality is continuously improving
Quick image with basic calibration can be made by the RO Good (state of the art) images take about 9-12 months
dedicated work There is new data available Polarization calibration needs still more work, but I’m
still confident that we’ll manage it with time.
29
Questions?
30
Discussion: What new observations are needed? Science goals? Who is going to do the work?
Does she/he have the time and experience? Where is the processing going to be done?
Even just moving around the data takes time! LOFAR in three lines:
Total power is possible now. Low noise and/or high resolution is a lot of work. Polarization is even more work.