    Annex 6.5.1.Detailed action plan for fulfillment of ex-ante conditionality 5.1. Risk prevention and risk management: the existence of 

    national or regional risk assessments for disaster management taking into account climate change adaptation

    Conditionality

    Unfullled/partially fullledcriteria

    Actions taken to fulll the criteria Deadlines Responsible body

     A national or regional risk assessment with the followingelements shall be in place:

    Implementation of the RO-RISK project, consisting in severalactivities answering to below criteria, which is to be nalisedthrough:

    !"#-!"$ %I& ' (I)S

    - Country Report on risk assessment, including the results of 

    risk assessment, risk matrix, analysis of uncertainty,recommendations for disaster risk reduction and prioritisationof investements based on risk assessment, within theassessment of risk scenarios

    *ovember

    !"$

    %I& ' (I)S

    Setting up the +epartment for )mergenc Situation, the *ationalommittee for .eather and +isasters and the *ational ommitte forSpecial )mergenc Situations

     /anuar !"0 '1ullled

    %I& ' (I)S

    &pproving the national regulator framewor2 for the functioning of the *ational 3latform for +isaster Ris2 %anagement, including (4)R*

    +ecember!"5

    %I& ' (I)S

    6  A description of the process,methodology, methods and non-sensitive data used for risk assessment as well as of the risk-based criteria for the prioritisation of investment 

    Stud of legal, regulator and institutional framewor2 of ris2management in Romania and the ris2 assessment, through a 7&contract 8&ctivit "9

    - 4aunching tender for 7& contract %arch !"5 '1ullled

    %I& ' (I)S

    - Signing the 7& contract %a !"5'

    1ullled

    %I& ' (I)S

    - +elivering the Stud, including a set of legal and institutional

    measures to be approved b (4)R*October !"5 %I& ' (I)S

    +evelop and implement national ris2 assessment methodolog,through a 7& contract 8&ctivit 9

    - Signing the 7& contract October!"0 ' 1ullled

    %I& ' (I)S

    - +eliver of the rst draft of the methodolog to be used in theris2 assessment

    1ebruar!"5' 1ullled

    %I& ' (I)S

    - 1inalising the methodolog based on feed-bac2 after theapplication of the methodolog

    *ovember %I& ' (I)S

    1

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    2/10

    Conditionality

    Unfullled/partially fullledcriteria

    Actions taken to fulll the criteria Deadlines Responsible body

    !"$

    Stud on acceptable ris2 in Romania, through a 7& contract 8&ctivit9

    %I& ' (I)S

    - Signing 7& contract September!"0 ' 1ullled

    %I& ' (I)S

    - +elivering the Stud on acceptable ris2 in Romania &pril !"5'1ullled

    %I& ' (I)S

    Setting up the database with ris2 eposure and response capabilitiesand the development of .eb(IS application and (IS portal 8&ctivit#9:

    - 4aunching tender for development of the database and (ISportal

    1ebruar !"5' 1ullled

    %I& ' (I)S

    - Signing contract for development of the database and (ISportal

     /ul !"5 %I& ' (I)S

    - +evelopment of the database and (IS portal and provision of necessar I7 e;uipment and software

     /ul !"$ %I& ' (I)S

    <  A description of single-risk andmulti-risk scenarios.

    +escription and assessment of representative ris2 scenarios to becarried out for each of the following nine ris2s: =oods, drought, forestres, earth;ua2es, landslides, Seveso accidents, accidents during thetransport of dangerous goods, nuclear accidents, epidemics and>oonotic disease, based on the national ris2 assessmentmethodolog, through a project developed under O3& 8&ctivit 09:

    - +eveloping and approving the project under O3& &ugust !"5 %I& ' (I)S

    - Starting project activitiesSeptember!"5

    • Single-ris2 and multi-ris2scenarios have been elaborated

    - Identication of representative ris2 scenarios and prioriti>ationof these scenarios in accordance with the criteria establishedb the methodolog ' ?a>ard analsis

    1ebruar !"$ %I& ' (I)S

    - Ris2 scenario assessment for each tpe of ris2 &ugust !"$ %I& ' (I)S

    • & description of these scenariosis available@

    - ountr report on ris2 assessment including the results of risk assessment, risk matrix, analysis of uncertainty andrecommendations for disaster risk reduction and prioritisation

    *ovember!"$

    %I& ' (I)S

    2

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    3/10

    Conditionality

    Unfullled/partially fullledcriteria

    Actions taken to fulll the criteria Deadlines Responsible body

        .   ! .

       R   i  s   k  p  r  e  v  e  n   t   i  o  n  a

      n   d  r   i  s   k  m  a  n  a  g  e  m  e  n   t  :   t   h  e  e  x   i  s   t  e  n  c  e  o   f  n  a   t   i  o  n  a   l  o  r  r  e  g   i  o  n  a   l  r   i  s   k

      a  s  s  e  s  s  m  e  n   t  s   f  o  r   d   i  s  a  s   t  e  r  m  a  n  a  g  e  m  e  n   t   t  a   k   i  n  g   i  n   t  o  a  c  c  o  u  n   t  c   l   i  m  a

       t  e  c   h  a  n  g  e  a   d  a  p   t  a   t   i  o  n of investements based on risk assessment, within the

    assessment of risk scenarios

    < "aking into account, whereappropriate, national climate changeadaptation strategies.

    • *ational climate changeadaptation strategies addressthe impact of climate change onhealth, agriculture and forest,

    biodiversit and ecosstems,water, costal and marine areas,and infrastructures andconstructions@

     7he *ational Strateg on limate hange !"#-!! was approvedb the (O 5A'!"#@ 7he Strateg addresses two main components:the reduction of greenhouse gas emissions concentration8%itigation9 and adapting to the eBects of climate change

    8&daptation9@ http:''www@mmediu@ro'beta'wpcontent'uploads'!"'"!'!"-"!-!5-StrategiaC*R-S@pdf 

    *ational &ction 3lan on limate hanges will be elaborated throughtechnical assistance in order to operationali>e the strateg@

    +evelopment of the *ational &ction 3lan on limate hange whichwill detail the sectorial actions of the *ational Strateg in the eld isunder preparation@ & rst draft of the &ction 3lan 6wil be available inthe rst ;uarter of !"5, while the nal version is to be apporved bend-/une !"5@

    October !"5 %).1

    •  7he limate change adaptationstrategies have been ta2en intoaccount to prioritise theinvestments to address specicris2s, ensuring disasterresilience and developingdisaster management sstems@

    +escription and assessment of representative ris2 scenarios will ta2einto account the *ational Strateg for limate hange &daptationand the limate hange &daptation Strategies, when prioritising theinvestments to address specic ris2s 8re=ected in the ountrReport9

    *ovember!"$

    %I& ' (I)S

    3

    http://www.mmediu.ro/http://www.mmediu.ro/

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    4/10

    4

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    5/10

    Working methodology to be applied for fulllment of ex-ante conditionality

    ADescription of the main acti!ities and their rele!ance forthe ex-ante conditionality criteria

     7he e-ante conditionalit regarding the eistence of national or regional ris2assessments for disaster management ta2ing into account climate changeadaptation is applicable to 3riorit &is 5 from 4arge Infrastructure Operational3rogramme@

    In order to ensure the fulllment of the e-ante conditionalit according to criteriaforeseen in Regulation 8)D9 *o "#!#'!"#, the assessment of the main ris2s inRomania will be performed through two )D funded projects, under thecoordination of the %inistr for Internal &Bairs, and within the framewor2 of the.or2ing (roup on Ris2 &ssessment at *ational 4evel 8(4)R*9@

     7he RO-RISK project started at the end of !"#, is to be ended b +ecember !"5

    and will be continued with RO-RISK until *ovember !"$@

     7he projects consist of four activities, which consider the criteria to be used toassess the e-ante conditionalit fullment, as follows:

    Criterion "ro#ect Acti!ity

    & description of the process,methodolog, methods and non-sensitive data used for ris2assessment as well as the ris2-based criteria for the prioritisationof the investment

     Activity !- #tudy of legal, regulatory and institutionalframework of risk management in Romania  and the risk assessment  in order to identif gaps and overlapping

     Activity $ - %evelop and implement national risk assessment methodology 

     Activity & - #etting up the database with risk exposure and

    response capabilities and the development of 'eb()#application and ()# portal

    & description of single-ris2 andmulti-ris2 scenarios

     Activity * - %escription and assessment of representativerisk scenarios for each of the following nine risks: +oods,drought, forest res, earthuakes, landslides, #evesoaccidents, accidents during the transport of dangerousgoods, nuclear accidents, epidemics and oonotic disease,based on the national risk assessment methodology 

     7a2ing into account, whereappropriate, national climatechange adaptation strategies

     7he projects for national ris2 assessment will develop a set of instruments for aunitar ris2 assessment and the integration of the sectorial evaluation results8methodolog, databases and (IS portal9, and also the rst assessment of ris2s@

     7hese instruments will facilitate the access of all sta2eholders to relevantinformation regarding eposure, vulnerabilities, and ris2s, and facilitateinformation echange between responsible authorities, in order to prioritiseprevention measures based on the economic damages avoided, and responsemeasures based on residual ris2 mapping@

     7hereb it will be possible to identif interconnections between diBerent tpes of ris2s, to avoid overlapping eBorts and to prioriti>e common strategies for disasterris2 reduction@

    5

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    6/10

    %oreover, it is necessar to dene acceptable ris2 and establish the threshold forthe ris2 as a basis for assessment process b appling the methodolog in orderto prioriti>e the measures to be ta2en@

    It must be considered that the ris2 assessment provides valuable information togovernment b showing the populationEs eposure to natural and man-made ris2soBers the premises for the sustainable land use planning in order to protect lives

    and livelihoods of people and represents the rst step in the disaster ris2reduction process@ It will also provide instruments to prioritise the interventionmeasures for ris2 reduction, based on average annual economic damagesavoided@

     7he funds for RO-RISK projects are assured from 3O&7 !!F-!"# and from 3O&!"0-!!@

     7he RO-RISK projects consist of the following activities, considering the criteriaused to assess the e-ante conditionalit fullment:

    $ A description of the process% methodology% methods and non-

    sensiti!e data used for risk assessment as &ell as the risk-basedcriteria for the prioritisation of in!estment

     Activity !- #tudy of legal, regulatory and institutional framework of risk management in Romania  and the risk assessment , implemented though a 7&contract

     7he stud will identif the gaps and overlappings in terms of legal andinstitutional framewor2 for ris2 management, proposing measures for improvingthe legal and procedural framewor2@ 7he results will establish the basis for settingup a national multi-sectorial mechanism for coordination and integration of ris2

    assessment activities@ 7he proposed measures are to be submitted to the *ational 3latform for +isasterRis2 Reduction, and their implementation will be monitored at 3latform level@

      Activity $- %evelop and implement national risk assessment methodology,implemented through a 7& contract

     7he national ris2 assessment methodolog establishes the framewor2 forensuring the comparabilit and compatibilit of ris2 assessment in part 8to beperformed under &ctivit 09 and will ta2e into account for sectorial methodologeisting at national level and the result of other activities@

     7he methodolog will be developed based on the ommission StaB .or2ing 3aper- Ris2 &ssessment and %apping (uidelines for +isaster %anagement ' S) 8!"!9"$$ and the re;uirements of a ris2 assessment process 8ISO #"!"!9:

    - 7he ris2 assessment will involve a wide range of actors and sta2eholders,through the *ational 3latform for +isaster Ris2 Reduction and (4)R*@(4)R* will comprise representatives of the main public institution managingris2s, the representatives of the academic and research instituions, *(Os

    6

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    7/10

    etc@ 7he main institutions with responsabilities in ris2 prevention andmanagement were identied though (+ *o G'!!0@ 7he sta2eholderswill be involved in all staged of ris2 assessment, starting with drafting theterms of references and during the drafting and accepting the results of thetechnical assisstance project@

    - 7he methodolog to be used, b considering all three categories of impacts

    8human, economic and environmental, social and political9 and will address,where possible, cross-border issues@

    In order to set up the reference acceptance threshold of ris2s, based on certaincriteria, a stud regarding the level of the acceptable ris2 in Romania will denethe level of potential losses considered acceptable in the present social,economic, politic, cultural, technical and environment conditions, in order toestablish a general indicator regarding the necessit of disaster ris2 reductionmeasures@ 7he results of the stud are to be used when developing themethodolog@

     7he rst draft of national ris2 assessment methodolog was drafted b the

    consultant and agreed upon b the central authorities with responsibilities in ris2management 8%inistr of )nvironment, .ater and 1orests, %inistr of Regional+evelopment and 3ublic &dministration, %inistr of &griculture and Rural+evelopment, %inistr of ?ealth, %inistr of )nerg, %inistr of 7ransport,*ational &uthorit for Heterinar and 1ood Safet, *ational ommission for*uclear &ctivities ontrol, *ational &genc for )nvironmental 3rotection and*ational &dministration Romanian .aterJ9 during three one da wor2shopsorgani>ed at the end of !"0, respectivel at the beginning of !"5 8*ovember,+ecember and /anuar9@ 7he methodolog is in line with the )D guidelines andwere developed integrating the eperience and lessons learnt from *etherland,*orwa, DK, (erman, Ireland, Swit>erland@

     7he eperts drafting the methodolog will provide support and guidance duringthe whole scenario assessment process for each of the A ris2s considered@

     7he nal methodolog will be drafted after nali>ation of the ris2s assessment, bincluding the feed-bac2 from the practical application of the rst draft of themethodolog@

     Activity & - #etting up the database with risk exposure and response capabilitiesand the development of 'eb()# application and ()# portal, implemented througha service contract@

    &ctivit # will have as result development of the database and ()# portal and provision of appropriate )" euipment and software.

     7he (IS application and 7he .eb(IS portal involve development of a (IS for allha>ards specic to Romanian territor, a map visuali>ation, geo-processing for(IS instruments in order to determine the multi-ris2 areas and informationsharing, sstem that will be phsicall installed at (I)S head;uarters@

    In order to be an operational sstem, it is necessar to build a database of allha>ards, vulnerabilities and capabilities at administrative-territorial unit level@

    7

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    8/10

    Signicant part of this information will be collected b the authorities responsiblefor ris2 management, *ational &genc for adastre and Real )state 3ublicit8&*3I9 and *ational Institute for Statistics 8I*S9@ Ris2 assessment involves a widerange of information but parts of this information were never collected@ In order toll this gap, it is necessar to collect information from the eld, indicatinggeographical coordinates@ ivil protection specic information 8e@g@ local

    government buildings, command centres9 and other important data for ris2assessment will be collected b professional emergenc services personnel@

    (IS will allow access on two levels: rstl, for authorities with responsibilities inris2 management, which can input, modif and update data about ris2 8ha>ard,ha>ard maps, ris2 maps, eposure9, and secondl, to the public, which can onlinterrogate the database@

     7he database and (IS portal will be developed in parallel with ris2 assessmentprocess, and at the end of the project, will provide a full image and integratedinstruments for ris2 management@

    $$ A description of single-risk and multi-risk scenarios

    $$$ 'aking into account% &here appropriate% national climate changeadaptation strategies

    - $dentication of representati!e risk scenarios and prioriti(ation of 

    these scenarios in accordance &ith the criteria established by themethodology

    - Risk scenarios aassessment for each type of risk% considering &henappropriate the national climate change adaptation strategies

    - $ntegrating the results of the assessment in a national report

     Activity * - %escription and assessment of representative risk scenarios for eachof the following nine risks: +oods, drought, forest res, earthuakes, landslides,#eveso accidents, accidents during the transport of dangerous goods, nuclear accidents, epidemics and oonotic disease, based on the national risk 

    assessment methodology, implemented through a 7& contract&ssessment of representative ris2 scenarios for each of the following nine ris2s:=oods, drought, forest res, earth;ua2es, landslides, Seveso accidents, accidentsduring the transport of dangerous goods, nuclear accidents, epidemics and>oonotic disease, will be performed based on the national ris2 assessmentmethodolog developed under &ctivit @ 7he assessment involves data collectionof ha>ards and ha>ards maps from authorities and research institutes, nationalha>ard analsis, identication of 0! major ris2 scenarios for each ris2,

    8

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    9/10

    prioriti>ation and assessment of the rst 5 ris2 scenarios, considered to berepresentative for Romania, for each tpe of ris2, indicating the value for impactand li2elihood 8ris2 matri9@

    Once the ris2 assessment process will be done, a report with conclusions on theimplementation process of ris2 assessment methodolog and also proposals forimprovement will be developed, as part of &ctivit @

    ased on proposals for improvement of methodolog, ris2 matri and also eBortsto lower ris2 level at established thresholds, there will be set up a series of criteria to be used in the prioriti>ation of investments for covering the ris2s@ "he prioritiation will be agreed among and assumed by the responsible authoritiesand will take into consideration the economic damages avoided.

    &fter the assessment of ris2 scenarios for each ris2, it will be elaborated a nalreport including the results of ris2 assessment, ris2 matri, analsis of uncertaintand concrete proposals for disaster ris2 reduction, integrated into a unitardocument fullling all criteria for the e-ante conditionalit, including theprioriti>ation of investments@

    In order to involve central authorities with responasbilities in ris2 management inspecic activities related to sectoral ris2 assessment whithin &ctivit 0, commonorders for establishing dedicated wor2ing groups were developed and are on theaproval circuit@1or the tender opening session, and assessment of tender documentation,repre>entatives from central authorities 8%inistr of )nvironment, .ater and1orests, %inistr of Regional +evelopment and 3ublic &dministration, %inistr of &griculture and Rural +evelopment, %inistr of ?ealth, %inistr of 7ransport,*ational &uthorit for Heterinar and 1ood Safet and *ational ommission for*uclear &ctivities ontrol9 were involved@

    )Risks that may impact on the fullment of ex-anteconditionality

    Impediments that can occur and which ma lead to non-fullment of e-anteconditionalit:

    "@ +elas in public procurement process for ris2s evaluation, ta2ing intoaccount the compleit of the procedure for ris2 assessment 8A lots9 andpossible appeals@

    %easures to avoid and reduce the impact:i@ 7he maimum legal deadlines have been ta2en into account

    when establishing the schedule for each activitLii@ 7he clarit of tender documentation was ensured in order to

    reduce the incidence of re;uests for clarication@iii@ In case of failure of the procurement procedure, a second

    solution is to be provided with )S1 support, through a

    9

  • 8/19/2019 Anexa 6.5.1. Detailed Action Plan for EAC 5.1. Risk Prevention and Risk Management

    10/10

    partnership project with research institutes or with .orld an2support 8O3&9

    @ 3oor involvement of authorities responsible with ris2 management inproject activities@ %easures to avoi and reduce the impact:

    i@ increase the no@ of high level formal written correspondencewith the responsible authorities in order to assure a bettercooperationL

    ii@ increase the informal cooperation with the eperts withinresponsible authoritiesL

    iii@ involving the responsible authorities in wor2ing groups andwor2shops dedicated to the implementation of the projectactivitiesL

     #@ 1ailure of legal framewor2 approval - *ational 3latform on +isaster Ris2

    Reduction and *ational .or2ing (roup on Ris2 &ssessment 8basis for

    setting up a national multisectorial mechanism for coordination andintegration of ris2 assessment activities9 %easures to avoid and reduce the impact:

    i@ Resumption of steps for approval of legal framewor2@ii@ &pproval of project results through informal cooperation and

    usual cooperation procedures, until the institutions are in place@

    C*onitoring procedure

     7he monitoring of the action plan implementation is going to be ensured througha monthl reporting and meetings, based on activit plan to be used asmonitoring tool, under the coordination of the %inistr of )uropean 1unds, withinthe thematic wor2ing groups organised within the 3artnership &greement1ramewor2@

     7he monitoring will be focused both on timel completion of the activities, andalso on the ;ualit of deliverables, for which /&S3)RS assistance is available toprovide support the authorities for the ;ualitative assessment of the e-anteconditionalit@