angola - afritramp · shipchandler yes shipyard no quantity capacity shore cranes from 3 to 5 t...
TRANSCRIPT
Ports description
Angola
Luanda Access Specification
LUANDA PORT MAP
Map reference number and Description Length (m) Draught (m)
1 General cargo (Multiterminal) (7 berths) 900
- 2 berths 100 3.5 - 5.5
- 5 berths 800 9.5
2 Multipurpose (Unicargas) (3 berths) 536 10
3 Container terminal (CT2) (3 berths) 550
- 2 berths 350 10.5
- 1 berth 200 12.5
4 Oil base (6 berths) 722
- 5 berths 522 12.5
- 1 new berth in construction 200 12.5
5 Container terminals and Soportos Terminal (2 berths) 500
- 1 berth Container 250 12
- 1 berth Multipurpose 250 12
Draught is calculated on high tide. Water density : 1.025 / Discharging on direct delivery basis / No storage facilities / ISPS : Level 1 / Weather : Rainy season : November to April. / State owned stevedoring & Private stevedoring. / Port position : 08.48S - 13.15E /
Port limits : For a vessel to be considered as "arrived vessel", she should be anchored in the bay past a line drawn between the Ilha lighthouse and across the bay to Fort San Pedro.
Pilotage : Pilots are provided by “EPIBAL”. 72 / 48 / 24 / 12 hours notices of arrival are to be addressed to the Vessel Agents, plus message of arrival at least 6 hours prior arrival must be received during normal office hours (07.00 - 17.00 hrs). Luanda Pilot standing-by on VHF channel 08 and 16. Pilot launch goes out from the port. Pilotage is not required for anchoring in the bay. Pilotage is compulsory for berthing / unberthing movements for all vessels a GRT > 250 tons.
Anchorage : Luanda Bay offers safe , sheltered anchorage at all times of the year. Good holding ground - sand/mud . No draft restrictions.
Towage : Two 2,200 HP tugs are available and operated by “EPINOSUL”. Use of tugs is compulsory for berthing and unberthing. Berthing : Ships taken in strict rotation of arrival for berthing (“first come, first served”), pilot usually boards at the entrance of the bay, around position 08 degrees 44.8’ South and 013 degrees 16.8’ East Maximum draft allowed for berthing 10.0 m, usually no congestion. Berthing can only take place during daylight hours, from 06.00 hrs to around 20.00 hrs, except supply/crew boats (at Sonils Base) and passengers ships. Passenger vessels, ferry boats, reefer vessels and humanitarian aid are granted priority berthing.
Luanda Access Specification
Luanda Port facilities
>> Storage facilities
Bonded warehouses None
Container storage area : - TC2 (terminal contenedores 2) - UNICARGAS
120,000 sqm 140,000 sqm
General cargo storage yard : - Multiterminais (commercial) : covered space - Multiterminais (commercial) : open air space - Oilfield related cargo : open air space
60,000 sqm 120,000 sqm 150,000 sqm
Plugs for reefer containers : - TC2 (terminal contenedores 2) - UNICARGAS
300120
Free storage zone for cargo in transit No special zones
>> Other facilities
Yes/no
Bunkering Yes (by barge)
Water Yes (by barge & tank truck)
Slops Yes (by tank truck)
Shipchlandler Yes
Shipyard : - 2 small slipways for fishing - boats and small coasters 1 floating drydock up to 6,000 DWT
Yes
>> Stevedoring equipment
Quantity Capacity Mobile crane 2 15-120 MT
Please click on the link below:http://www.afritramp.fr/UserFiles/File/Luanda%20Port%20facilities(1).pdf
Luanda Port facilities
>> Multipurpose Terminal : Unicargas
Area: 178.641 m2Berths: 3Quay length: 536 metersDraught : 10.0 metersGate hour : 24Warehousing area : 10.500 m2
Equipment (Nr of Units and max Lifting capacity)
Forklifts:1 x 37 tons3 x 12 tons3 x 7 tons6 x 3 tons
Tugmaster and Tractors
15 x 30 tons2 x 45 tons2 x 60 tons
Goosnecks (Number of units and Safe Work load) : 2 x 60 tonsMisc (as Reach Stacker or Mobile Crane) : 18 x 45 tons3 Mobiles cranes 30 Tons / 40 Tons & 80 Tons
Luanda Port facilities
>> General Cargo Terminal - Multiterminais
Area: 80.000 m2Berths: 5Quay length: 900 metersDraught : 100 meters at 5.5 m/ 800 meters at 10.0 mGate hour : 24Warehousing area : 246 675 meters
Equipment (Nr of Units and max Lifting capacity)
Forklifs:
1 x 37 tons2 x 10 tons4 x 7 tons2 x 5 tons2 x 3 tons
Tugmaster and Tractors
4 x 35 – 40 tons4 x 36 – 40 tons
Goosnecks (Number of units and Safe Work load) : 4 x 60 tonsMisc (as Reach Stacker or Mobile Crane) : 4 x 45 tons3 Mobiles cranes 30 Tons / 40 Tons & 80 Tons
Luanda Port facilities
>> 5M Terminal : Container & General Cargo
Berths: 3Quay length: 560 metersDraught : 12.0 metersGate hour : 24Equipment (Nr of Units and max Lifting capacity)
Forklifts:
4 x 37 tons3 x 12 tons3 x 7 tons2 x 5 tonsTractors: 9Mobile Harbor Cranes: 2Reach Stackers or Mobile Crane : 10Reefer plugs: 400
>> Sogester Container Terminal
Total Developed Area 14.2
Container Berths 3
Quay Length 542Draught (min-max) 9Gate Hours 24Design Capacity 10970 TEUEquipement (Nr of Units and max Lifting capacity)
Reachstackers 22Top Loaders 1Empty Container Handlers 5Forklifts 4 Tractors 16Trailers 16Mobile Habor Cranes 2Ship to Shore Cranes n/aReefer Plugs 400Stacking area 14.2
Lobito Access Specification
Tide variation : 1.8 max Lobito entrance and main channel : Drafts ; AAA - 12.5 mts, NAABSA - 13.5 mts Length of channel : 0.6 miles Draught is calculated on level 0. / Water density : 1.024 ISPS : Level 1 / Weather : Rainy season : September to April. Stevedoring : Owned and performed by Port Authority.
Pier 1 2 3 4 5 6 7 8 Depths 9.0 9.0 9.0 9.5 11.0 11.0 11 11
Map reference number and Description Length (m) Draught (m)
North dock (all cargo) 480 9.5 South dock (all cargo) 552 11 Coasting dock (fishing vessels) 92 4 Sonamet (oil base) 120 9
Lobito Port facilities
>> Storage facilities
Nil wharehouse
AMI storage (about 500 mts from the port) 4,500 sqm (in which 1,400 sqm of wharehouse)
Silos (at quay 2) 25,000 T
>> Other facilities
Yes/no
Bunkering Yes IFO AND MGO can be supplied
(by pipeline from bunker handling facility in Lobito bay) Water Yes
(available both at quay and by barge up to 30 MT) Slops Yes Shipchandler Yes Shipyard No
Quantity Capacity Shore cranes from 3 to 5 T Mobile crane 1 up to 100 T Reach stackers Khalmmar 3 20' and 40' cnts Reach stackers Liebher 2 20' and 40' cnts Forklifts Hyster 2 20' and 40' cnts Forklifts Hyster 7 from 2.5 to 5 T Forklifts Hyster nil empty 40' Trucks and trailers 4 Tractors and trailers 2 20 MT Tugs 2 2,500 HP - 4,500 HP
>> Stevedoring equipment
Cabinda Access Specification
BERTH CARGO LENGTH (m) DRAUGHT (m)
Cabinda Port dock Gal cargo / bgd cargo / Containers cargo 110 6Cabinda Anchorage Gal cargo / bgd cargo / Containers cargo nil
Malongo dock Chevron Cargo / Gal /Containers destinated to Chevron Dock F shapedMaximum vessel size 97 m 5,5
Draught is calculated on high tideCabinda Port dock is situated in an open sea with no break waterFloating barges cranes assist operations at anchorage , each with capacity to receive approx.175 teusLifting capacity 36 t max.No shore crane availableWater density : 1,025ISPS : Level 1Berthing at Malongo dock is allowed only for freighters with cargo consigneed to Cabgoc or his Contractors Cies
Rainy season : mid-October to the end of AprilDry season : May to September
Cabinda Port facilities
>> Stevedoring equipment
Quantity Capacity Tug 2 2,000 HP Reach Stakers with handle container at Terminal 5
5 Reach Stackers - which handle containers at Terminal
2 Tugs of 2 000 HP towing pontoons
2 Terminals for Full containers
1 terminal for empty containers
2 Warehouses
Namibe Access Specification
Berth/unberth permitted irrespective of daylight : The pilot can bring the vessels alongside from 06:30 to 17:45 pm, now the Unberth can be made from 06:30 to 24:00.Water density : 1.0254/ ISPS : Level 1 / Weather : dry season from mid-May to mid-August. / State owned stevedoring.
At low water maximum draught is 10.50 meters.
Berths Cargo Length Draught Porto Namibe General cargo/Bagged Cargo 450 m 10.5 Porto Saco Bunkers/loading Iron Ore only 320 m 16
Namibe Port facilities
>> Storage facilities
Container storage area 7,200 sqm (about 2,500 to 3,500 containers full and empties)
>> Stevedoring equipment
Quantity Capacity Cranes NIL Loaders 4 Forklifts 1 for empty containers (20' and 40') Forklift 1 for full containers (20' and 40') Forklift 1 for blocks of granite with 45 T Spreaders 2 20' - 40' Spreader NIL for bulk cargo like ciment Trailers NIL Tug 1 2,100 HP
Shore cranes Not available
>> Other facilities
Yes/no
Bunkering FO : Yes - DO : No
Water Yes
Slops No
Shipchandler Yes
Shipyard No
Soyo Access Specification
Crude Terminals : Dalia, Girassol, Pazflor, Kizomba (A, B,C) , PSVM, Palanca, and blocks 1-3-4-16-32-46-47-48-49 crude terminals are operated from Soyo.Please note that Maintenance works on Girassol offloading buoy have started in July 2012.Restriction on VLCC 2nd port will be lifted once all the works are fully completed.This infomation will be communicated directly to all the lifters with the povisionary lifting program (issued every 15th of each month)
Channel Pululu with 12 lighted buoys and capacity for major vessels, no tugs or pilot available / Draugth is calculated at low water
Maxi draught is 7.8 m but channel to be dredged twice a year to maintain this level / Lifting capacity up to 200 tons
Water density : 1.008/1.012 / ISPS : Level 1 / Weather conditions with moderate winds
The commercial quay is under of the Port of Soyo / Private Stevedoring.
Length (m) Draught (m)
Main Quay (Freighters) 220 7.3
Texaco (W) Quay 91.5 7.3
ENI QUAY 120 7.3
ALNG quay North (Roro vessels) 50 7.3
Commercial Quay 200 7.3
Slot 1 44.5
Slot 2 56.4 7.0
Slot 3 55.3 6.0
Texaco (E) Quay 73 7.3
6.0 exclusive for Schlumberger
Descrip on and Map reference
Soyo Port facilities
>> Stevedoring equipment
Quantity Capacity
Cranes 5 50 T - 50 T
Loaders 4
Forklifts 6
Trailers 3
Tugs 3
>> Other facilities
Yes/no
Bunkering No
Water No
Slops Yes
Shipchandler No
Shipyard No