annex 5 - turbine layout · 07/08/2018 v5.3 application boundary (900.4 hectares) planning...

1
WC 20 WC 08 WC 10 WC 11 WC 12 WC 13 WC 14 WC 07 WC 21 WC 03 WC 05 WC 06 WC 04 WC 01 WC 18 WC 17 WC 16 WC 15 WC 09 WC 02 WC 19 WC 22 SPT CB WC 23 0m 100m 200m 300m 400m 500m 0m 200m 600m Source information: N Scale: Revision: Description: Drn: Chkd: Date: Scale: 1:15000@A2 Ref: HJB / Title: Project: Drawn: CM Checked: RA App': 22.05.19 Orig': Sheet: 2nd Floor, Block C, Brandon Gate, Leechlee Road, Hamilton, Lanarkshire. ML3 6AU T: 01698 477410 F: 01698 477439 W: www.banksgroup.co.uk LETHANS Site Layout Plan (Operational Layout) 780 / 297 RA © Crown copyright and database rights ( 2019 ). Ordnance Survey 0100031673 1/1 V5.3 07/08/2018 Application Boundary (900.4 hectares) Planning Application May 2019 Drawing PA04 Turbine Location Crane Pad and Assembly Area New Water Crossing Access Track Existing Water Crossing WC XX WC XX Wind Farm Control Building SPT Control Building SPT CB Permanent Met Mast & Crane Pad Based on AECOM Drawing PA03B Site Layout Rev/Issue A - 14.05.19 Key Drawing content © Copyright ( ) Banks Developments Limited. All rights reserved. 2019 Annex 5 - Turbine Layout This is the Turbine Layout referred to in the consent by the Scottish Ministers in terms of Section 36 of the Electricity Act 1989 for the construction and operation of the Lethans Wind Farm, a wind powered electricity generating station near New Cumnock, East Ayrshire. Signed: William Black, a member of the staff of the Scottish Ministers Date: 18 June 2020 REDACTED

Upload: others

Post on 12-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Annex 5 - Turbine Layout · 07/08/2018 V5.3 Application Boundary (900.4 hectares) Planning Application May 2019 Drawing PA04 Turbine Location Crane Pad and Assembly Area New Water

WC 20

WC 08

WC 10WC 11

WC 12

WC 13

WC 14

WC 07

WC 21

WC 03

WC 05WC 06

WC 04

WC 01

WC 18

WC 17WC 16

WC 15

WC 09

WC 02

WC 19

WC 22

SPT CB

WC 23

100m 200m

0m 100m

200m

300m

400m

500m

0m 200m 600mSource information:

NScale:

Revision: Description: Drn: Chkd: Date:

Scale:1:15000@A2

Ref:HJB /

Title:

Project:

Drawn: CM Checked: RA App': 22.05.19Orig':

Sheet:

2nd Floor, Block C, Brandon Gate, Leechlee Road, Hamilton, Lanarkshire. ML3 6AUT: 01698 477410 F: 01698 477439 W: www.banksgroup.co.uk

LETHANSSite Layout Plan

(Operational Layout)

780 / 297

RA

© Crown copyright and database rights ( 2019 ). Ordnance Survey 0100031673

1/1

V5.307/08/2018

Application Boundary (900.4 hectares)

Planning Application May 2019Drawing PA04

Turbine Location

Crane Pad and Assembly Area

New Water Crossing

Access Track

Existing Water CrossingWC XX

WC XX

Wind Farm Control Building

SPT Control BuildingSPT CB

Permanent Met Mast & Crane Pad

Based on AECOM Drawing PA03B Site Layout Rev/Issue A - 14.05.19

Key

Drawing content © Copyright ( ) Banks Developments Limited. All rights reserved.2019

Annex 5 - Turbine Layout

This is the Turbine Layout referred to in the consent by the Scottish Ministers in terms of Section 36 of the Electricity Act 1989 for the construction and operation of the Lethans Wind Farm, a wind powered electricity generating station near New Cumnock, East Ayrshire.

Signed:

William Black, a member of the staff of the Scottish Ministers

Date: 18 June 2020

REDACTED

AutoCAD SHX Text
T17
AutoCAD SHX Text
T12
AutoCAD SHX Text
T23
AutoCAD SHX Text
T2
AutoCAD SHX Text
T16
AutoCAD SHX Text
T14
AutoCAD SHX Text
T19
AutoCAD SHX Text
T4
AutoCAD SHX Text
T25
AutoCAD SHX Text
T11
AutoCAD SHX Text
T20
AutoCAD SHX Text
T27
AutoCAD SHX Text
T13
AutoCAD SHX Text
T24
AutoCAD SHX Text
T26
AutoCAD SHX Text
T7
AutoCAD SHX Text
T10
AutoCAD SHX Text
T18
AutoCAD SHX Text
T15
AutoCAD SHX Text
T21
AutoCAD SHX Text
T22
AutoCAD SHX Text
T8