anouj mehta senior infrastructure finance specialist (public private partnerships) adb’s...
TRANSCRIPT
Anouj MehtaSenior Infrastructure Finance Specialist
(Public Private Partnerships)
ADB’s Assistance for PPP’s in India
On-Going & Proposed Initiatives
26-27 February 2009, Bhopal,
Rapid economic growth Rapid economic growth
Rapid UrbanisationRapid Urbanisation
Population, Income & Consumption Population, Income & Consumption Levels GrowthLevels Growth
PO
WE
R W
AT
ER T
RA
NS
PO
RT
Severe
Capacity
Pressures
On
All
Sectors
SO
CIA
L
SE
CT
OR
S
Years of Investment LagsYears of Investment Lags
BACKGROUND: Growth Fuelled Infrastructure Pressures
BACKGROUND: Huge Investment Needs Estimated at US$ 500 billion over next 5 years
SectorsSectors US $ billionUS $ billion Sectoral Shares Sectoral Shares (%)(%)
Sector-wise Sector-wise Public (%)Public (%)
Sector-wise Sector-wise Private (%)Private (%)
ELECTRICITYELECTRICITY 150.37 30.2 73.6 26.4
ROADSROADS 81.24 16.3 66.2 33.8
TELECOMSTELECOMS 65.12 13.1 73.6 26.4
RAILWAYSRAILWAYS 62.20 12.5 83 17
PORTSPORTS 18.03 3.6 26.3 73.7
AIRPORTSAIRPORTS 8.46 1.7 25.8 74.2
WATER SUPPLY & WATER SUPPLY & SANITATIONSANITATION
48.57 9.8 97.3 2.7
IRRIGATIONIRRIGATION 52.98 10.7 100 --
OTHER – Storage / GasOTHER – Storage / Gas 10.46 2.1 50/82.4 50/17.6
TOTALTOTAL 497.55497.55 100.0100.0 70.870.8 29.229.2
• 70,000 MW Capacity / Coverage expansion70,000 MW Capacity / Coverage expansion
• 6,500 km Golden Quadrilateral / North-South 6,500 km Golden Quadrilateral / North-South and East-West corridors / 11,113 km Nat. and East-West corridors / 11,113 km Nat. Highways / 1,000 km Expressways / 7,616 km Highways / 1,000 km Expressways / 7,616 km National Highways in North EastNational Highways in North East
• Dedicated freight corridors Dedicated freight corridors • 10,300 kms of new railway lines10,300 kms of new railway lines• 21 stations’ modernisation21 stations’ modernisation
• 485 MT in major ports485 MT in major ports
A huge ask of private sector
Not Just Funds…….but also EFFICIENCIES
SUSTAINABLE INFRASTRUCTURE
DIVERSEFUNDINGSOURCES
EFFICIENT USAGE OF
ASSETS
EFFICIENT DEMAND
MANAGEMENTOF
RESOURCES
Majority Public
IDEALIDEAL
REALITYREALITYLarge T&D / NRW
LossesLarge Wastages
Interlinked – Efficient, predictable, financially sustainable enterprises will attract diverse funding options
• Increasing impact on natural resources which are fast depletingIncreasing impact on natural resources which are fast depleting
Poor Institutional Poor Institutional StructuresStructures
Weak IncentivesWeak Incentives
Poor Tariffs, Poor Tariffs, Cost Recoveries & Cost Recoveries &
Financial Financial SustainabilitySustainability
Outdated MIS and Outdated MIS and FM FM
SystemsSystems
Typical Situation
Bulk water sourced 187 m litres p.d.Technical Losses Upstream 5% 9 m litres p.d.Water post treatment avail for distr 178 m litres p.d.Commercial Losses - Theft 16% 28 m litres p.d.Billed Quantity 149 m litres p.d.Collection Efficiency 67% 49 m litres p.d.Collected Bills - related Quantity 100 m litres p.d. 87 m litres p.d.Population 2009 1,000,000 31,762 m litres p.a.End Amount Supplied 100 lpcd
Lost WaterOperations Today
• ImplicationsImplications•Less than 135 lpcd supplied – even the above 100 lpcd hugely un-evenLess than 135 lpcd supplied – even the above 100 lpcd hugely un-even•Coverage poorCoverage poor•Sewerage situation even worseSewerage situation even worse•WILL GET WORSE as population increasesWILL GET WORSE as population increases•Bulk water sources under severe pressure – looking for sources 50 kms Bulk water sources under severe pressure – looking for sources 50 kms away from city nowaway from city now•Investments of Rs 500 + crores required in BWS, Distribution etcInvestments of Rs 500 + crores required in BWS, Distribution etc
Even the 4 buckets a day will fall to 2 if nothing is done!!Even the 4 buckets a day will fall to 2 if nothing is done!!
Funding??
•Normal Normal focus will befocus will be•To enhance bulk waterTo enhance bulk water•Find investments from government for capexFind investments from government for capex•JNNURM – limited supplyJNNURM – limited supply•Commercial finance – limitedCommercial finance – limited•SUSTAINABILITY is the key – both JNNURM and banks want that for SUSTAINABILITY is the key – both JNNURM and banks want that for lendinglending
Rs Tariff 21 Rs per kilo litreRevenuesBilled 3,133,746 Collected 2,099,610 Operating Costs (extrapolated) 4,031,251 Operating Ratio 1.92Net Bleed Every Day (1,931,641) PER DAY
Certainly not sustainable!!Certainly not sustainable!!
Phase in a PPP Solutiono Focus is not just funds but IBM:
• Institutional ring fencing and efficient delivery• Benchmarking and measuring performance improvements• Managing for MAINTENANCE not just CAPEX
• PPP Phase in• Short term for technical baseline development, institutions development and
revenue enhancements - for improving financials and confidence• Medium term for expansion and larger capex investments
Simple Things: Improvement Increase in Collection by(Rs per day)
a) Improve collection efficiency 90% 720,761 b) Reduce commercial losses (cum) 5% 1,090,096 c) Improve tariffs - 15% increase 24 1,545,768 d) Improve cost management - power 10% reductions in cost 1,971,677
Available funds per day now 40,036
ADB Assistance for PPPs
PPP is seen as one key solution
• Attract FRESH FUNDS into sector
• Develop Utility Institution’s EFFICIENCIES
• Faster response to CONSUMERSNeed for an Enabling Environment
P S S T
PPPolicy Strengthening Policy Strengthening
• Policy for private – Policy for private – domestic & foreign domestic & foreign investmentinvestment
• Regulation & MonitoringRegulation & Monitoring
• Incentives for PPP’sIncentives for PPP’s
• User charges policiesUser charges policies
• Viability support Viability support
SSSupply of long term Supply of long term
fundsfunds
SSStrong Stakeholder Strong Stakeholder
CapacitiesCapacities
TTTrust Amongst ALL Trust Amongst ALL
StakeholdersStakeholders
• Local and central Local and central government capacities to government capacities to contract with and monitor contract with and monitor PPPsPPPs
• Good transaction Good transaction advisory supportadvisory support
• Good domestic Good domestic contractors / operatorscontractors / operators
• Long term to match long Long term to match long gestation infrastructure gestation infrastructure
• Competitive and risk Competitive and risk basedbased
• Strong domestic funding Strong domestic funding institutions with risk institutions with risk analysis abilityanalysis ability
• Awareness for all – Awareness for all – ee’s, consumers, private ee’s, consumers, private playersplayers
• Transparency in Transparency in processprocess
• Participatory processesParticipatory processes
ADB’s Support to Government of India for Mainstreaming PPPs Follows the Value Chain
Awareness & Awareness & Capacity BuildingCapacity Building
PPP Project PPP Project Structuring – Structuring –
Demonstration Demonstration ProjectsProjects
Sector Specific Sector Specific PPP Policy PPP Policy
DevelopmentDevelopment
Technical Assistance (TA)Technical Assistance (TA) - Funds- Funds
- Expertise- Expertise
Catalytic Lending ProductsCatalytic Lending Products- - With & Without RecourseWith & Without Recourse
- Co-financingCo-financing- Credit enhancement productsCredit enhancement products
Lending Window for Lending Window for PPP Projects PPP Projects
-Non / Sub Sovereign Non / Sub Sovereign FacilityFacility
• For all stakeholdersFor all stakeholders •Frameworks for PPPFrameworks for PPP •Good early precedentsGood early precedents •Catalytic risk sharing fundsCatalytic risk sharing funds
TA 4890: Mainstreaming PPP at State Level (on-going)
SCOPE• $ 3 million Technical Assistance program• Further $2 million in final stage of Board
approval – approved already by President• Focused on 15 states
ADB Initiatives: Capacity Building - State Level ADB Initiatives: Capacity Building - State Level
FOCUS: Strengthening PPP Cells and Capacities by a) providing PPP and MIS in-house consultants for an extended period and b) access to legal advisory services
• PREPARATORY: PPP constraints identification, PPP Frameworks and policies development
• CAPACITY DEVELOPMENT: Training, manuals, good practices, improving systems for bid document and project appraisals, risk management systems
• INSTITUTIONALISATION: MIS development, consultations with stakeholders, quality checks and improvements on PPP/bid documents, project pipeline conceptualisation and supervision of projects
TA 4890: Mainstreaming PPP at State Level (contd.)
• STATUS 13 PPP Specialists – 12 states and DEA 14 MIS specialists appointed – 14 states and DEA A Legal Advisory Panel A large number of activities are taking place within the PPP Cells:
Workshops and training activities – including on risk, capacity development, sector focus (urban, health, education), etc
Exposure Visits and consultations with private sector and international governments
Value added assistance being provided by cells to projects from across sectoral departments and ministries in project risk structuring, improving bid documents
Assistance being provided for financial closure including VGF applications Development of action plans for project pipeline development – urban,
health, education Several project concepts for PPP projects are being developed within the
states for further DEA / ADB assistance
Tremendous Response from States
ADB Initiatives: Capacity Building - State Level ADB Initiatives: Capacity Building - State Level
TA 4993: Mainstreaming PPP at Central Line Ministries (on-going)
SCOPE $ 2 million Technical Assistance program Focused on 6 line ministries Strengthening PPP Cells and Capacities
FOCUS Strengthening PPP Cells and Capacities by a) providing PPP and MIS in-house consultants for an extended period and b) access to legal advisory services
PREPARATORY: PPP constraints identification, PPP Frameworks and policies development
CAPACITY DEVELOPMENT: Training needs assessments, training, good practices inculcation, improvement in systems for project appraisals and bid processes
INSTITUTIONALISATION: MIS development, consultations, quality checks and improvements on PPP/bid documents, project pipeline conceptualisation and supervision of projects
ADB Initiatives: Capacity Building - Central LevelADB Initiatives: Capacity Building - Central Level
Health & Education PPP Frameworks (TA 4890 Related)
SCOPE Assistance provided for
developing a PPP Framework for Health and Education
KPMG Consultants recruited
Cross sector-division ADB team worked with DEA (SAGF, SAUD, SANS)
ACTIVITIES Consultation Visits with 5 states - T.N., Orissa,
Uttarakhand, Rajasthan, A.P.
ADB-KPMG Consultants Report Produced
6 PPP Models Identified
Framework for PPP development outlined
Consultation Workshops on Draft Report held - Ahmedabad & Panjim (February and April) 2008
Workshop to evolve project concepts held - Panjim, April 08 – leading to a proposed concept pipeline of 20 projects
Assisted by PPP Cells in co-ordination and workshops – now assisting on project proposal development
Meetings being held with DEA and ADB for structuring projects and taking to market
Tremendous interest from states in developing projects further in a challenging area
ADB Initiatives: Sector Specific PPP Policy AssistanceADB Initiatives: Sector Specific PPP Policy Assistance
Urban PPP workshops for all states held in Jaipur and Hyderabad in October 2007 (cross ADB divisions)
States developed action plans for PPP projects
Follow up activities co--ordinated by PPP Cells leading to pipeline of over 20 PPP project proposals from states
TA PPP Pilot Projects Initiative
CONCEPT Projects being evolved in the PPP Cells and across states and sectors
Need for assisting in structuring good pilot PPP projects • Create “demonstration” models• Allows for replication across country• ADB presence will improve risk perception • Catalyse private sector involvement
List of potential projects for TA already identified by DEA with assistance from PPP Cells – further can be added on
TA will leverage ADB TA funds with GOI development funds (IIPDF) to quickly provide transaction advisory and project preparation assistance to PPP proposals
Flexible, value added, quick response modality – first such TA from ADB
ADB Initiatives: PPP Project Structuring Assistance ADB Initiatives: PPP Project Structuring Assistance